1
|
فاز يك (داخلي سازي مجموعه منبع هاي اگزوز )
|
367
|
243
|
2023/07/15
|
Jul 15 2023 8:00AM
|
2024/09/22
|
Sep 22 2024 12:30PM
|
|
1402/4/24
|
1403/7/1
|
0
|
43
|
16.51
|
22.01
|
1.34834e+009
|
|
38.21
|
Edit
Details
Delete
|
|
1.1
|
جلسه DFMEA
|
5
|
5
|
2023/07/15
|
Jul 15 2023 8:00AM
|
2023/07/19
|
Jul 19 2023 2:00PM
|
|
1402/4/24
|
1402/4/28
|
100
|
100
|
0.79
|
0.79
|
0
|
|
0.79
|
Edit
Details
Delete
|
|
1.2
|
توجيه اقتصادي پروژه-تاييد امكان سنجي
|
5
|
5
|
2023/07/25
|
Jul 25 2023 11:30AM
|
2023/08/01
|
Aug 1 2023 9:00AM
|
2FS+5 days
|
1402/5/3
|
1402/5/10
|
100
|
100
|
0.79
|
0.79
|
0
|
|
0.79
|
Edit
Details
Delete
|
|
1.3
|
شروع پروژه
|
0
|
0
|
2023/08/01
|
Aug 1 2023 9:00AM
|
2023/08/01
|
Aug 1 2023 9:00AM
|
3
|
1402/5/10
|
1402/5/10
|
100
|
100
|
0
|
0
|
0
|
كنترل پروژه
|
0
|
Edit
Details
Delete
|
|
1.4
|
مرحله مقدماتي
|
289
|
115
|
2023/08/01
|
Aug 1 2023 9:00AM
|
2024/07/15
|
Jul 15 2024 2:30PM
|
|
1402/5/10
|
1403/4/25
|
0
|
42
|
7.55
|
7.55
|
7.84309e+008
|
كنترل پروژه
|
18.08
|
Edit
Details
Delete
|
|
1.4.1
|
دريافت اطلاعات فني از مشتري (نقشه، شناسنامه فني ، تست پلن و ...)
|
7
|
7
|
2023/08/01
|
Aug 1 2023 9:00AM
|
2024/05/02
|
May 2 2024 10:30AM
|
3
|
1402/5/10
|
1403/2/13
|
100
|
100
|
1.1
|
1.1
|
0
|
مهندسي محصول
|
1.1
|
Edit
Details
Delete
|
|
1.4.2
|
دريافت نمونه اگزوز وارداتي (منفصله و مجموعه كامل)
|
1
|
1
|
2023/08/01
|
Aug 1 2023 9:00AM
|
2023/08/02
|
Aug 2 2023 8:30AM
|
3
|
1402/5/10
|
1402/5/11
|
100
|
100
|
0.16
|
0.16
|
4.90013e+008
|
مهندسي محصول
|
0.16
|
Edit
Details
Delete
|
|
1.4.3
|
انتخاب پيمانكار
|
1
|
1
|
2023/08/01
|
Aug 1 2023 9:00AM
|
2023/08/02
|
Aug 2 2023 8:30AM
|
3
|
1402/5/10
|
1402/5/11
|
100
|
100
|
0.16
|
0.16
|
2.94296e+008
|
مهندسي محصول,تامين
|
0.16
|
Edit
Details
Delete
|
|
1.4.4
|
مذاکره با پیمانکار جهت بررسي و امكان سنجي ساخت داخل اگزوز
|
2
|
2
|
2023/08/01
|
Aug 1 2023 9:00AM
|
2023/08/02
|
Aug 2 2023 4:30PM
|
3
|
1402/5/10
|
1402/5/11
|
100
|
100
|
0.31
|
0.31
|
0
|
تامين,مهندسي محصول
|
0.31
|
Edit
Details
Delete
|
|
1.4.5
|
ساخت نمونه مطالعاتي منبع ها
|
7
|
7
|
2023/08/10
|
Aug 10 2023 1:00PM
|
2023/08/19
|
Aug 19 2023 9:30AM
|
9FS+7 days
|
1402/5/19
|
1402/5/28
|
100
|
100
|
1.1
|
1.1
|
0
|
مهندسي محصول,ساپلاير
|
1.1
|
Edit
Details
Delete
|
|
1.4.6
|
بررسي مونتاژ پذيري نمونه منبع ها بر روي خودرو
|
1
|
1
|
2023/08/19
|
Aug 19 2023 9:30AM
|
2023/08/20
|
Aug 20 2023 9:00AM
|
10
|
1402/5/28
|
1402/5/29
|
100
|
100
|
0.16
|
0.16
|
0
|
مهندسي محصول,ساپلاير
|
0.16
|
Edit
Details
Delete
|
|
1.4.7
|
اصلاح در صورت نياز
|
7
|
7
|
2023/08/20
|
Aug 20 2023 9:00AM
|
2023/08/27
|
Aug 27 2023 2:00PM
|
11
|
1402/5/29
|
1402/6/5
|
100
|
100
|
1.1
|
1.1
|
0
|
|
1.1
|
Edit
Details
Delete
|
|
1.4.8
|
تحويل نمونه مقدماتي به كادك/مهندسي كرمان موتور جهت انجام تست هاي عملكردي
|
2
|
2
|
2023/08/27
|
Aug 27 2023 2:00PM
|
2023/08/29
|
Aug 29 2023 1:00PM
|
12
|
1402/6/5
|
1402/6/7
|
100
|
100
|
0.31
|
0.31
|
0
|
مهندسي محصول
|
0.31
|
Edit
Details
Delete
|
|
1.4.9
|
تست توان سر چرخ و آلايندگي نمونه مطالعاتي توسط كرمان موتور
|
20
|
20
|
2023/08/29
|
Aug 29 2023 1:00PM
|
2023/10/05
|
Oct 5 2023 11:30AM
|
13
|
1402/6/7
|
1402/7/13
|
100
|
100
|
3.14
|
3.14
|
0
|
مهندسي كرمان موتور,مهندسي محصول
|
3.14
|
Edit
Details
Delete
|
|
1.4.10
|
بررسي نتايج تست ها و صدور تاييديه
|
7
|
7
|
2024/04/29
|
Apr 29 2024 8:00AM
|
2024/05/06
|
May 6 2024 1:00PM
|
14
|
1403/2/10
|
1403/2/17
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور
|
1.1
|
Edit
Details
Delete
|
|
1.4.11
|
انجام تست هاي ذكر شده در تست پلن، تهيه تست ريپورت
|
60
|
60
|
2024/05/02
|
May 2 2024 10:30AM
|
2024/07/15
|
Jul 15 2024 2:30PM
|
6
|
1403/2/13
|
1403/4/25
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول,آقاي مهندس ابراهيم
|
9.43
|
Edit
Details
Delete
|
|
1.5
|
مرحله توليد و تاييد نمونه اوليه
|
207
|
84
|
2023/09/13
|
Sep 13 2023 10:30AM
|
2024/05/28
|
May 28 2024 11:30AM
|
|
1402/6/22
|
1403/3/8
|
0
|
56
|
7.39
|
12.89
|
5.64034e+008
|
كنترل پروژه
|
13.21
|
Edit
Details
Delete
|
|
1.5.1
|
توليد 2 ست بعنوان نمونه اوليه
|
5
|
5
|
2023/09/13
|
Sep 13 2023 10:30AM
|
2023/09/20
|
Sep 20 2023 4:30PM
|
14FS-15 days
|
1402/6/22
|
1402/6/29
|
100
|
100
|
0.79
|
0.79
|
0
|
مهندسي محصول,ساپلاير
|
0.79
|
Edit
Details
Delete
|
|
1.5.2
|
ارسال نمونه هاي اوليه به كارخانه
|
2
|
2
|
2023/09/21
|
Sep 21 2023 8:00AM
|
2023/09/23
|
Sep 23 2023 3:30PM
|
18
|
1402/6/30
|
1402/7/1
|
100
|
100
|
0.31
|
0.31
|
0
|
مهندسي محصول,كنترل موجودي
|
0.31
|
Edit
Details
Delete
|
|
1.5.3
|
بررسي نمونه هاي اوليه توسط واحد مهندسي آرمان موتور
|
2
|
2
|
2023/09/23
|
Sep 23 2023 3:30PM
|
2023/09/26
|
Sep 26 2023 2:30PM
|
19
|
1402/7/1
|
1402/7/4
|
100
|
100
|
0.31
|
0.31
|
0
|
مهندسي محصول,مهندسي توليد
|
0.31
|
Edit
Details
Delete
|
|
1.5.4
|
ارسال نمونه هاي اوليه به كرمان موتور
|
2
|
2
|
2023/09/26
|
Sep 26 2023 2:30PM
|
2023/09/28
|
Sep 28 2023 1:30PM
|
20
|
1402/7/4
|
1402/7/6
|
100
|
100
|
0.31
|
0.31
|
2.58739e+007
|
مهندسي كرمان موتور,مهندسي محصول,كنترل موجودي,مهندسي توليد
|
0.31
|
Edit
Details
Delete
|
|
1.5.5
|
بررسي و ارزيابي نمونه اوليه توسط كرمان موتور
|
2
|
2
|
2023/09/28
|
Sep 28 2023 1:30PM
|
2023/10/01
|
Oct 1 2023 12:30PM
|
21
|
1402/7/6
|
1402/7/9
|
100
|
100
|
0.31
|
0.31
|
0
|
مهندسي كرمان موتور,مهندسي توليد
|
0.31
|
Edit
Details
Delete
|
|
1.5.6
|
اعلام نتايج بررسي نمونه ها و اخذ تاييديه
|
2
|
2
|
2023/10/01
|
Oct 1 2023 12:30PM
|
2023/10/05
|
Oct 5 2023 11:30AM
|
22
|
1402/7/9
|
1402/7/13
|
100
|
100
|
0.31
|
0.31
|
0
|
مهندسي كرمان موتور,مهندسي توليد
|
0.31
|
Edit
Details
Delete
|
|
1.5.7
|
ارسال نمونه تاييد شده به تهران جهت تهيه نقشه
|
2
|
2
|
2023/10/05
|
Oct 5 2023 11:30AM
|
2023/10/08
|
Oct 8 2023 10:30AM
|
23
|
1402/7/13
|
1402/7/16
|
100
|
100
|
0.31
|
0.31
|
0
|
مهندسي محصول,مهندسي توليد
|
0.31
|
Edit
Details
Delete
|
|
1.5.8
|
اسكن و مدلسازي
|
15
|
15
|
2023/10/08
|
Oct 8 2023 10:30AM
|
2023/10/24
|
Oct 24 2023 11:30AM
|
24
|
1402/7/16
|
1402/8/2
|
100
|
100
|
2.36
|
2.36
|
2.5816e+008
|
ساپلاير,مهندسي محصول
|
2.36
|
Edit
Details
Delete
|
|
1.5.9
|
طراحي فيكسچر توليدي و كنترلي و درخواست خدمات
|
15
|
15
|
2023/10/24
|
Oct 24 2023 11:30AM
|
2023/11/09
|
Nov 9 2023 12:30PM
|
25
|
1402/8/2
|
1402/8/18
|
100
|
100
|
2.36
|
2.36
|
2.8e+008
|
آقاي نوروز زاده
|
2.36
|
Edit
Details
Delete
|
|
1.5.10
|
استعلام قيمت ، انتخاب پيمانكار
|
7
|
7
|
2024/04/29
|
Apr 29 2024 8:00AM
|
2024/05/06
|
May 6 2024 1:00PM
|
26
|
1403/2/10
|
1403/2/17
|
100
|
0
|
0
|
1.1
|
0
|
امور قراردادها,تامين
|
1.1
|
Edit
Details
Delete
|
|
1.5.11
|
ساخت فيكسچر توليدي و كنترلي به روش ليزر برش / مونتاژ در كارخانه
|
20
|
20
|
2024/05/06
|
May 6 2024 1:00PM
|
2024/05/28
|
May 28 2024 11:30AM
|
27
|
1403/2/17
|
1403/3/8
|
90
|
0
|
0
|
2.83
|
0
|
ساپلاير,مهندسي توليد,آقاي نوروز زاده,مهندسي محصول
|
3.14
|
Edit
Details
Delete
|
|
1.5.12
|
عقد قرارداد تامين و پيش پرداخت
|
10
|
10
|
2024/04/29
|
Apr 29 2024 8:00AM
|
2024/05/09
|
May 9 2024 11:30AM
|
23
|
1403/2/10
|
1403/2/20
|
100
|
0
|
0
|
1.57
|
0
|
امور قراردادها,تامين,مالي
|
1.57
|
Edit
Details
Delete
|
|
1.6
|
مرحله يك روز خط
|
123
|
34
|
2024/05/09
|
May 9 2024 11:30AM
|
2024/09/22
|
Sep 22 2024 12:30PM
|
|
1403/2/20
|
1403/7/1
|
0
|
0
|
0
|
0
|
0
|
كنترل پروژه
|
5.35
|
Edit
Details
Delete
|
|
1.6.1
|
سفارش توليد يك روز خط قطعات
|
2
|
2
|
2024/05/09
|
May 9 2024 11:30AM
|
2024/05/12
|
May 12 2024 10:30AM
|
29
|
1403/2/20
|
1403/2/23
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول
|
0.31
|
Edit
Details
Delete
|
|
1.6.2
|
توليد و ارسال قطعات يك روز خط به كارخانه
|
15
|
15
|
2024/05/12
|
May 12 2024 10:30AM
|
2024/09/05
|
Sep 5 2024 11:30AM
|
31
|
1403/2/23
|
1403/6/15
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول,كنترل موجودي
|
2.36
|
Edit
Details
Delete
|
|
1.6.3
|
آديت واحد تضمين كيفيت
|
2
|
2
|
2024/07/15
|
Jul 15 2024 2:30PM
|
2024/07/17
|
Jul 17 2024 1:30PM
|
16
|
1403/4/25
|
1403/4/27
|
0
|
0
|
0
|
0
|
0
|
تضمين كيفيت,مهندسي توليد,مهندسي محصول
|
0.31
|
Edit
Details
Delete
|
|
1.6.4
|
توليد يك روز خط اگزوز در آرمان موتور
|
2
|
2
|
2024/09/05
|
Sep 5 2024 11:30AM
|
2024/09/08
|
Sep 8 2024 10:30AM
|
33,28,32
|
1403/6/15
|
1403/6/18
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول,مهندسي توليد
|
0.31
|
Edit
Details
Delete
|
|
1.6.5
|
ارسال يك روز خط اگزوز و تست ريپورت آزمون هاي انجام شده به كرمان موتور
|
2
|
2
|
2024/09/08
|
Sep 8 2024 10:30AM
|
2024/09/10
|
Sep 10 2024 9:30AM
|
34
|
1403/6/18
|
1403/6/20
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول,آقاي مهندس ابراهيم
|
0.31
|
Edit
Details
Delete
|
|
1.6.6
|
مونتاژ يك روز خط - تزيينات كرمان موتور
|
5
|
5
|
2024/09/10
|
Sep 10 2024 9:30AM
|
2024/09/15
|
Sep 15 2024 3:30PM
|
35
|
1403/6/20
|
1403/6/25
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور,مهندسي توليد
|
0.79
|
Edit
Details
Delete
|
|
1.6.7
|
ارزيابي يك روز خط
|
4
|
4
|
2024/09/15
|
Sep 15 2024 3:30PM
|
2024/09/19
|
Sep 19 2024 1:30PM
|
36
|
1403/6/25
|
1403/6/29
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور,مهندسي توليد,مهندسي محصول
|
0.63
|
Edit
Details
Delete
|
|
1.6.8
|
تاييديه يك روز خط
|
2
|
2
|
2024/09/19
|
Sep 19 2024 1:30PM
|
2024/09/22
|
Sep 22 2024 12:30PM
|
37
|
1403/6/29
|
1403/7/1
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور,مهندسي توليد,مهندسي محصول
|
0.31
|
Edit
Details
Delete
|
|
1.6.9
|
پايان فاز اول
|
0
|
0
|
2024/09/22
|
Sep 22 2024 12:30PM
|
2024/09/22
|
Sep 22 2024 12:30PM
|
38
|
1403/7/1
|
1403/7/1
|
0
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
2
|
فاز دو ( داخلي سازي مجموعه ابتدايي اگزوز )
|
490
|
393
|
2023/08/27
|
Aug 27 2023 2:00PM
|
2025/03/19
|
Mar 19 2025 11:30AM
|
|
1402/6/5
|
1403/12/29
|
0
|
1
|
0.63
|
2.2
|
0
|
|
61.79
|
Edit
Details
Delete
|
|
2.1
|
مرحله مقدماتي
|
452
|
163
|
2023/08/27
|
Aug 27 2023 2:00PM
|
2025/02/05
|
Feb 5 2025 1:30PM
|
|
1402/6/5
|
1403/11/17
|
0
|
2
|
0.63
|
2.2
|
0
|
|
25.63
|
Edit
Details
Delete
|
|
2.1.1
|
استعلام قيمت قالبسازي مجموعه ابتدايي اگزوز
|
3
|
3
|
2023/08/27
|
Aug 27 2023 2:00PM
|
2023/08/30
|
Aug 30 2023 12:30PM
|
12
|
1402/6/5
|
1402/6/8
|
100
|
100
|
0.47
|
0.47
|
0
|
مهندسي محصول,ساپلاير
|
0.47
|
Edit
Details
Delete
|
|
2.1.2
|
انتخاب پيمانكار
|
1
|
1
|
2023/08/30
|
Aug 30 2023 12:30PM
|
2023/08/31
|
Aug 31 2023 12:00PM
|
42
|
1402/6/8
|
1402/6/9
|
100
|
100
|
0.16
|
0.16
|
0
|
تامين
|
0.16
|
Edit
Details
Delete
|
|
2.1.3
|
قرارداد قالب سازي
|
10
|
10
|
2024/04/29
|
Apr 29 2024 8:00AM
|
2024/05/18
|
May 18 2024 11:30AM
|
43
|
1403/2/10
|
1403/2/29
|
100
|
0
|
0
|
1.57
|
0
|
امور قراردادها
|
1.57
|
Edit
Details
Delete
|
|
2.1.4
|
پيش پرداخت
|
5
|
5
|
2024/05/18
|
May 18 2024 11:30AM
|
2024/05/23
|
May 23 2024 9:00AM
|
44
|
1403/2/29
|
1403/3/3
|
0
|
0
|
0
|
0
|
0
|
مالي,امور قراردادها
|
0.79
|
Edit
Details
Delete
|
|
2.1.5
|
قالب سازي
|
45
|
45
|
2024/05/23
|
May 23 2024 9:00AM
|
2024/10/20
|
Oct 20 2024 12:00PM
|
45
|
1403/3/3
|
1403/7/29
|
0
|
0
|
0
|
0
|
0
|
ساپلاير
|
7.08
|
Edit
Details
Delete
|
|
2.1.6
|
ساخت نمونه مطالعاتی و بررسي مونتاژپذيري
|
5
|
5
|
2024/10/20
|
Oct 20 2024 12:00PM
|
2024/10/26
|
Oct 26 2024 9:30AM
|
46
|
1403/7/29
|
1403/8/5
|
0
|
0
|
0
|
0
|
0
|
ساپلاير,مهندسي محصول
|
0.79
|
Edit
Details
Delete
|
|
2.1.7
|
تست مونتاژ پذيري نمونه مطالعاتی -كارخانه
|
5
|
5
|
2024/10/26
|
Oct 26 2024 9:30AM
|
2024/10/30
|
Oct 30 2024 3:30PM
|
47
|
1403/8/5
|
1403/8/9
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول,مهندسي توليد
|
0.79
|
Edit
Details
Delete
|
|
2.1.8
|
تحويل نمونه مقدماتي به مهندسي كرمان موتور جهت انجام تست هاي عملكردي
|
2
|
2
|
2024/10/30
|
Oct 30 2024 3:30PM
|
2024/11/02
|
Nov 2 2024 2:30PM
|
48
|
1403/8/9
|
1403/8/12
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور,مهندسي محصول
|
0.31
|
Edit
Details
Delete
|
|
2.1.9
|
تست توان سر چرخ و آلايندگي نمونه مطالعاتي توسط كرمان موتور
|
20
|
20
|
2024/11/02
|
Nov 2 2024 2:30PM
|
2024/11/24
|
Nov 24 2024 1:00PM
|
49
|
1403/8/12
|
1403/9/4
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور
|
3.14
|
Edit
Details
Delete
|
|
2.1.10
|
بررسي نتايج تست ها و صدور تاييديه
|
7
|
7
|
2024/11/24
|
Nov 24 2024 1:00PM
|
2024/12/02
|
Dec 2 2024 9:30AM
|
50
|
1403/9/4
|
1403/9/12
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور,مهندسي محصول
|
1.1
|
Edit
Details
Delete
|
|
2.1.11
|
انجام تست هاي ذكر شده در تست پلن، تهيه تست ريپورت
|
60
|
60
|
2024/12/02
|
Dec 2 2024 9:30AM
|
2025/02/05
|
Feb 5 2025 1:30PM
|
51
|
1403/9/12
|
1403/11/17
|
0
|
0
|
0
|
0
|
0
|
|
9.43
|
Edit
Details
Delete
|
|
2.2
|
مرحله توليد و تاييد نمونه اوليه
|
74
|
84
|
2024/12/02
|
Dec 2 2024 9:30AM
|
2025/02/20
|
Feb 20 2025 3:00PM
|
|
1403/9/12
|
1403/12/2
|
0
|
0
|
0
|
0
|
0
|
|
13.21
|
Edit
Details
Delete
|
|
2.2.1
|
توليد 3 ست بعنوان نمونه اوليه
|
5
|
5
|
2024/12/02
|
Dec 2 2024 9:30AM
|
2024/12/07
|
Dec 7 2024 3:30PM
|
51
|
1403/9/12
|
1403/9/17
|
0
|
0
|
0
|
0
|
0
|
ساپلاير,مهندسي محصول
|
0.79
|
Edit
Details
Delete
|
|
2.2.2
|
ارسال نمونه هاي اوليه به كارخانه
|
2
|
2
|
2024/12/07
|
Dec 7 2024 3:30PM
|
2024/12/09
|
Dec 9 2024 2:30PM
|
54
|
1403/9/17
|
1403/9/19
|
0
|
0
|
0
|
0
|
0
|
كنترل موجودي,مهندسي محصول
|
0.31
|
Edit
Details
Delete
|
|
2.2.3
|
بررسي نمونه هاي اوليه توسط واحد مهندسي آرمان موتور
|
2
|
2
|
2024/12/09
|
Dec 9 2024 2:30PM
|
2024/12/11
|
Dec 11 2024 1:30PM
|
55
|
1403/9/19
|
1403/9/21
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور,مهندسي محصول
|
0.31
|
Edit
Details
Delete
|
|
2.2.4
|
ارسال نمونه هاي اوليه به كرمان موتور
|
2
|
2
|
2024/12/11
|
Dec 11 2024 1:30PM
|
2024/12/14
|
Dec 14 2024 12:30PM
|
56
|
1403/9/21
|
1403/9/24
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد,مهندسي كرمان موتور
|
0.31
|
Edit
Details
Delete
|
|
2.2.5
|
بررسي و ارزيابي نمونه اوليه توسط كرمان موتور
|
2
|
2
|
2024/12/14
|
Dec 14 2024 12:30PM
|
2024/12/16
|
Dec 16 2024 11:30AM
|
57
|
1403/9/24
|
1403/9/26
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد,مهندسي كرمان موتور
|
0.31
|
Edit
Details
Delete
|
|
2.2.6
|
اعلام نتايج بررسي نمونه ها و اخذ تاييديه
|
2
|
2
|
2024/12/16
|
Dec 16 2024 11:30AM
|
2024/12/18
|
Dec 18 2024 10:30AM
|
58
|
1403/9/26
|
1403/9/28
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد,مهندسي كرمان موتور
|
0.31
|
Edit
Details
Delete
|
|
2.2.7
|
ارسال نمونه تاييد شده به تهران جهت تهيه نقشه
|
2
|
2
|
2024/12/18
|
Dec 18 2024 10:30AM
|
2024/12/21
|
Dec 21 2024 9:30AM
|
59
|
1403/9/28
|
1403/10/1
|
0
|
0
|
0
|
0
|
0
|
كنترل موجودي,مهندسي توليد,مهندسي محصول
|
0.31
|
Edit
Details
Delete
|
|
2.2.8
|
اسكن و مدلسازي
|
15
|
15
|
2024/12/21
|
Dec 21 2024 9:30AM
|
2025/01/06
|
Jan 6 2025 10:30AM
|
60
|
1403/10/1
|
1403/10/17
|
0
|
0
|
0
|
0
|
0
|
ساپلاير,مهندسي محصول
|
2.36
|
Edit
Details
Delete
|
|
2.2.9
|
طراحي فيكسچر توليدي و كنترلي و درخواست خدمات
|
15
|
15
|
2025/01/06
|
Jan 6 2025 10:30AM
|
2025/01/22
|
Jan 22 2025 11:30AM
|
61
|
1403/10/17
|
1403/11/3
|
0
|
0
|
0
|
0
|
0
|
آقاي نوروز زاده
|
2.36
|
Edit
Details
Delete
|
|
2.2.10
|
استعلام قيمت ، انتخاب پيمانكار
|
7
|
7
|
2025/01/22
|
Jan 22 2025 11:30AM
|
2025/01/29
|
Jan 29 2025 4:30PM
|
62
|
1403/11/3
|
1403/11/10
|
0
|
0
|
0
|
0
|
0
|
تامين
|
1.1
|
Edit
Details
Delete
|
|
2.2.11
|
ساخت فيكسچر توليدي و كنترلي به روش ليزر برش / مونتاژ در كارخانه
|
20
|
20
|
2025/01/30
|
Jan 30 2025 8:00AM
|
2025/02/20
|
Feb 20 2025 3:00PM
|
63
|
1403/11/11
|
1403/12/2
|
0
|
0
|
0
|
0
|
0
|
ساپلاير,مهندسي توليد,مهندسي محصول
|
3.14
|
Edit
Details
Delete
|
|
2.2.12
|
عقد قرارداد تامين و پيش پرداخت
|
10
|
10
|
2024/12/18
|
Dec 18 2024 10:30AM
|
2024/12/29
|
Dec 29 2024 2:00PM
|
59
|
1403/9/28
|
1403/10/9
|
0
|
0
|
0
|
0
|
0
|
امور قراردادها,تامين,مالي
|
1.57
|
Edit
Details
Delete
|
|
2.3
|
مرحله يك روز خط
|
292
|
146
|
2024/05/02
|
May 2 2024 10:30AM
|
2025/03/19
|
Mar 19 2025 11:30AM
|
|
1403/2/13
|
1403/12/29
|
0
|
0
|
0
|
0
|
0
|
|
22.96
|
Edit
Details
Delete
|
|
2.3.1
|
سفارش توليد يك روز خط قطعات
|
2
|
2
|
2024/12/29
|
Dec 29 2024 2:00PM
|
2024/12/31
|
Dec 31 2024 1:00PM
|
65
|
1403/10/9
|
1403/10/11
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول
|
0.31
|
Edit
Details
Delete
|
|
2.3.2
|
توليد و ارسال قطعات يك روز خط به كارخانه
|
7
|
7
|
2025/02/20
|
Feb 20 2025 3:00PM
|
2025/03/01
|
Mar 1 2025 11:30AM
|
67,64
|
1403/12/2
|
1403/12/11
|
0
|
0
|
0
|
0
|
0
|
ساپلاير,كنترل موجودي,مهندسي محصول
|
1.1
|
Edit
Details
Delete
|
|
2.3.3
|
آديت واحد تضمين كيفيت
|
2
|
2
|
2025/03/01
|
Mar 1 2025 11:30AM
|
2025/03/03
|
Mar 3 2025 10:30AM
|
68,52
|
1403/12/11
|
1403/12/13
|
0
|
0
|
0
|
0
|
0
|
تضمين كيفيت,مهندسي توليد,مهندسي محصول
|
0.31
|
Edit
Details
Delete
|
|
2.3.4
|
توليد يك روز خط اگزوز در آرمان موتور
|
2
|
2
|
2025/03/03
|
Mar 3 2025 10:30AM
|
2025/03/05
|
Mar 5 2025 9:30AM
|
69
|
1403/12/13
|
1403/12/15
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد
|
0.31
|
Edit
Details
Delete
|
|
2.3.5
|
ارسال يك روز خط اگزوز و تست ريپورت آزمون هاي انجام شده به كرمان موتور
|
2
|
2
|
2025/03/05
|
Mar 5 2025 9:30AM
|
2025/03/08
|
Mar 8 2025 8:30AM
|
70
|
1403/12/15
|
1403/12/18
|
0
|
0
|
0
|
0
|
0
|
كنترل موجودي,مهندسي توليد
|
0.31
|
Edit
Details
Delete
|
|
2.3.6
|
مونتاژ يك روز خط - تزيينات كرمان موتور
|
5
|
5
|
2025/03/08
|
Mar 8 2025 8:30AM
|
2025/03/12
|
Mar 12 2025 2:30PM
|
71
|
1403/12/18
|
1403/12/22
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد
|
0.79
|
Edit
Details
Delete
|
|
2.3.7
|
ارزيابي يك روز خط
|
4
|
4
|
2025/03/12
|
Mar 12 2025 2:30PM
|
2025/03/17
|
Mar 17 2025 12:30PM
|
72
|
1403/12/22
|
1403/12/27
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد,مهندسي كرمان موتور
|
0.63
|
Edit
Details
Delete
|
|
2.3.8
|
تاييديه يك روز خط
|
2
|
2
|
2025/03/17
|
Mar 17 2025 12:30PM
|
2025/03/19
|
Mar 19 2025 11:30AM
|
73
|
1403/12/27
|
1403/12/29
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد,مهندسي كرمان موتور,مهندسي محصول
|
0.31
|
Edit
Details
Delete
|
|
2.3.9
|
تكميل مدارك مطابق دستور العمل تكوين محصول
|
120
|
120
|
2024/05/02
|
May 2 2024 10:30AM
|
2024/12/29
|
Dec 29 2024 10:00AM
|
6
|
1403/2/13
|
1403/10/9
|
0
|
0
|
0
|
0
|
0
|
تضمين كيفيت,مهندسي محصول
|
18.87
|
Edit
Details
Delete
|
|
2.3.10
|
پايان فاز دوم
|
0
|
0
|
2025/03/19
|
Mar 19 2025 11:30AM
|
2025/03/19
|
Mar 19 2025 11:30AM
|
74,75
|
1403/12/29
|
1403/12/29
|
0
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
0
|
KMC X5-PJPR-02-005
|
529.5625d
|
636.0d
|
2023/07/15
|
7/15/2023 12:00:00 AM
|
2025/03/19
|
3/19/2025 12:00:00 AM
|
|
1402/4/24
|
1403/12/29
|
0
|
17
|
17.138364779874216
|
24.213836477987424
|
1348343390
|
|
100.00000000000001
|
Edit
Details
Delete
|
|
1
|
فاز يك (داخلي سازي مجموعه منبع هاي اگزوز )
|
367.125d
|
243.0d
|
2023/07/15
|
7/15/2023 12:00:00 AM
|
2024/09/22
|
9/22/2024 12:00:00 AM
|
|
1402/4/24
|
1403/7/1
|
0
|
43
|
16.50943396226415
|
22.012578616352204
|
1348343390
|
|
38.20754716981132
|
Edit
Details
Delete
|
|
1.1
|
جلسه DFMEA
|
5.0d
|
5.0d
|
2023/07/15
|
7/15/2023 12:00:00 AM
|
2023/07/19
|
7/19/2023 12:00:00 AM
|
|
1402/4/24
|
1402/4/28
|
100
|
100
|
0.7861635220125787
|
0.7861635220125787
|
0
|
|
0.7861635220125787
|
Edit
Details
Delete
|
|
1.2
|
توجيه اقتصادي پروژه-تاييد امكان سنجي
|
5.0d
|
5.0d
|
2023/07/25
|
7/25/2023 12:00:00 AM
|
2023/08/01
|
8/1/2023 12:00:00 AM
|
2
|
1402/5/3
|
1402/5/10
|
100
|
100
|
0.7861635220125787
|
0.7861635220125787
|
0
|
|
0.7861635220125787
|
Edit
Details
Delete
|
|
1.3
|
شروع پروژه
|
0.0d
|
0.0d
|
2023/08/01
|
8/1/2023 12:00:00 AM
|
2023/08/01
|
8/1/2023 12:00:00 AM
|
3
|
1402/5/10
|
1402/5/10
|
100
|
100
|
0
|
0
|
0
|
كنترل پروژه
|
0
|
Edit
Details
Delete
|
|
1.4
|
مرحله مقدماتي
|
289.6875d
|
115.0d
|
2023/08/01
|
8/1/2023 12:00:00 AM
|
2024/07/15
|
7/15/2024 12:00:00 AM
|
|
1402/5/10
|
1403/4/25
|
0
|
42
|
7.547169811320754
|
7.547169811320754
|
784309477
|
كنترل پروژه
|
18.081761006289312
|
Edit
Details
Delete
|
|
1.4.1
|
دريافت اطلاعات فني از مشتري (نقشه، شناسنامه فني ، تست پلن و ...)
|
7.0d
|
7.0d
|
2023/08/01
|
8/1/2023 12:00:00 AM
|
2024/05/02
|
5/2/2024 12:00:00 AM
|
3
|
1402/5/10
|
1403/2/13
|
100
|
100
|
1.10062893081761
|
1.10062893081761
|
0
|
مهندسي محصول
|
1.10062893081761
|
Edit
Details
Delete
|
|
1.4.2
|
دريافت نمونه اگزوز وارداتي (منفصله و مجموعه كامل)
|
1.0d
|
1.0d
|
2023/08/01
|
8/1/2023 12:00:00 AM
|
2023/08/02
|
8/2/2023 12:00:00 AM
|
3
|
1402/5/10
|
1402/5/11
|
100
|
100
|
0.15723270440251574
|
0.15723270440251574
|
490013394
|
مهندسي محصول
|
0.15723270440251574
|
Edit
Details
Delete
|
|
1.4.3
|
انتخاب پيمانكار
|
1.0d
|
1.0d
|
2023/08/01
|
8/1/2023 12:00:00 AM
|
2023/08/02
|
8/2/2023 12:00:00 AM
|
3
|
1402/5/10
|
1402/5/11
|
100
|
100
|
0.15723270440251574
|
0.15723270440251574
|
294296083
|
مهندسي محصول,تامين
|
0.15723270440251574
|
Edit
Details
Delete
|
|
1.4.4
|
مذاکره با پیمانکار جهت بررسي و امكان سنجي ساخت داخل اگزوز
|
2.0d
|
2.0d
|
2023/08/01
|
8/1/2023 12:00:00 AM
|
2023/08/02
|
8/2/2023 12:00:00 AM
|
3
|
1402/5/10
|
1402/5/11
|
100
|
100
|
0.3144654088050315
|
0.3144654088050315
|
0
|
تامين,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.4.5
|
ساخت نمونه مطالعاتي منبع ها
|
7.0d
|
7.0d
|
2023/08/10
|
8/10/2023 12:00:00 AM
|
2023/08/19
|
8/19/2023 12:00:00 AM
|
9
|
1402/5/19
|
1402/5/28
|
100
|
100
|
1.10062893081761
|
1.10062893081761
|
0
|
مهندسي محصول,ساپلاير
|
1.10062893081761
|
Edit
Details
Delete
|
|
1.4.6
|
بررسي مونتاژ پذيري نمونه منبع ها بر روي خودرو
|
1.0d
|
1.0d
|
2023/08/19
|
8/19/2023 12:00:00 AM
|
2023/08/20
|
8/20/2023 12:00:00 AM
|
10
|
1402/5/28
|
1402/5/29
|
100
|
100
|
0.15723270440251574
|
0.15723270440251574
|
0
|
مهندسي محصول,ساپلاير
|
0.15723270440251574
|
Edit
Details
Delete
|
|
1.4.7
|
اصلاح در صورت نياز
|
7.0d
|
7.0d
|
2023/08/20
|
8/20/2023 12:00:00 AM
|
2023/08/27
|
8/27/2023 12:00:00 AM
|
11
|
1402/5/29
|
1402/6/5
|
100
|
100
|
1.10062893081761
|
1.10062893081761
|
0
|
|
1.10062893081761
|
Edit
Details
Delete
|
|
1.4.8
|
تحويل نمونه مقدماتي به كادك/مهندسي كرمان موتور جهت انجام تست هاي عملكردي
|
2.0d
|
2.0d
|
2023/08/27
|
8/27/2023 12:00:00 AM
|
2023/08/29
|
8/29/2023 12:00:00 AM
|
12
|
1402/6/5
|
1402/6/7
|
100
|
100
|
0.3144654088050315
|
0.3144654088050315
|
0
|
مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.4.9
|
تست توان سر چرخ و آلايندگي نمونه مطالعاتي توسط كرمان موتور
|
20.0d
|
20.0d
|
2023/08/29
|
8/29/2023 12:00:00 AM
|
2023/10/05
|
10/5/2023 12:00:00 AM
|
13
|
1402/6/7
|
1402/7/13
|
100
|
100
|
3.1446540880503147
|
3.1446540880503147
|
0
|
مهندسي كرمان موتور,مهندسي محصول
|
3.1446540880503147
|
Edit
Details
Delete
|
|
1.4.10
|
بررسي نتايج تست ها و صدور تاييديه
|
7.0d
|
7.0d
|
2024/04/29
|
4/29/2024 12:00:00 AM
|
2024/05/06
|
5/6/2024 12:00:00 AM
|
14
|
1403/2/10
|
1403/2/17
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور
|
1.10062893081761
|
Edit
Details
Delete
|
|
1.4.11
|
انجام تست هاي ذكر شده در تست پلن، تهيه تست ريپورت
|
60.0d
|
60.0d
|
2024/05/02
|
5/2/2024 12:00:00 AM
|
2024/07/15
|
7/15/2024 12:00:00 AM
|
6
|
1403/2/13
|
1403/4/25
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول,آقاي مهندس ابراهيم
|
9.433962264150944
|
Edit
Details
Delete
|
|
1.5
|
مرحله توليد و تاييد نمونه اوليه
|
207.3125d
|
84.0d
|
2023/09/13
|
9/13/2023 12:00:00 AM
|
2024/05/28
|
5/28/2024 12:00:00 AM
|
|
1402/6/22
|
1403/3/8
|
0
|
56
|
7.389937106918241
|
12.893081761006286
|
564033913
|
كنترل پروژه
|
13.207547169811319
|
Edit
Details
Delete
|
|
1.5.1
|
توليد 2 ست بعنوان نمونه اوليه
|
5.0d
|
5.0d
|
2023/09/13
|
9/13/2023 12:00:00 AM
|
2023/09/20
|
9/20/2023 12:00:00 AM
|
14
|
1402/6/22
|
1402/6/29
|
100
|
100
|
0.7861635220125787
|
0.7861635220125787
|
0
|
مهندسي محصول,ساپلاير
|
0.7861635220125787
|
Edit
Details
Delete
|
|
1.5.2
|
ارسال نمونه هاي اوليه به كارخانه
|
2.0d
|
2.0d
|
2023/09/21
|
9/21/2023 12:00:00 AM
|
2023/09/23
|
9/23/2023 12:00:00 AM
|
18
|
1402/6/30
|
1402/7/1
|
100
|
100
|
0.3144654088050315
|
0.3144654088050315
|
0
|
مهندسي محصول,كنترل موجودي
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.5.3
|
بررسي نمونه هاي اوليه توسط واحد مهندسي آرمان موتور
|
2.0d
|
2.0d
|
2023/09/23
|
9/23/2023 12:00:00 AM
|
2023/09/26
|
9/26/2023 12:00:00 AM
|
19
|
1402/7/1
|
1402/7/4
|
100
|
100
|
0.3144654088050315
|
0.3144654088050315
|
0
|
مهندسي محصول,مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.5.4
|
ارسال نمونه هاي اوليه به كرمان موتور
|
2.0d
|
2.0d
|
2023/09/26
|
9/26/2023 12:00:00 AM
|
2023/09/28
|
9/28/2023 12:00:00 AM
|
20
|
1402/7/4
|
1402/7/6
|
100
|
100
|
0.3144654088050315
|
0.3144654088050315
|
25873913
|
مهندسي كرمان موتور,مهندسي محصول,كنترل موجودي,مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.5.5
|
بررسي و ارزيابي نمونه اوليه توسط كرمان موتور
|
2.0d
|
2.0d
|
2023/09/28
|
9/28/2023 12:00:00 AM
|
2023/10/01
|
10/1/2023 12:00:00 AM
|
21
|
1402/7/6
|
1402/7/9
|
100
|
100
|
0.3144654088050315
|
0.3144654088050315
|
0
|
مهندسي كرمان موتور,مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.5.6
|
اعلام نتايج بررسي نمونه ها و اخذ تاييديه
|
2.0d
|
2.0d
|
2023/10/01
|
10/1/2023 12:00:00 AM
|
2023/10/05
|
10/5/2023 12:00:00 AM
|
22
|
1402/7/9
|
1402/7/13
|
100
|
100
|
0.3144654088050315
|
0.3144654088050315
|
0
|
مهندسي كرمان موتور,مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.5.7
|
ارسال نمونه تاييد شده به تهران جهت تهيه نقشه
|
2.0d
|
2.0d
|
2023/10/05
|
10/5/2023 12:00:00 AM
|
2023/10/08
|
10/8/2023 12:00:00 AM
|
23
|
1402/7/13
|
1402/7/16
|
100
|
100
|
0.3144654088050315
|
0.3144654088050315
|
0
|
مهندسي محصول,مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.5.8
|
اسكن و مدلسازي
|
15.0d
|
15.0d
|
2023/10/08
|
10/8/2023 12:00:00 AM
|
2023/10/24
|
10/24/2023 12:00:00 AM
|
24
|
1402/7/16
|
1402/8/2
|
100
|
100
|
2.358490566037736
|
2.358490566037736
|
258160000
|
ساپلاير,مهندسي محصول
|
2.358490566037736
|
Edit
Details
Delete
|
|
1.5.9
|
طراحي فيكسچر توليدي و كنترلي و درخواست خدمات
|
15.0d
|
15.0d
|
2023/10/24
|
10/24/2023 12:00:00 AM
|
2023/11/09
|
11/9/2023 12:00:00 AM
|
25
|
1402/8/2
|
1402/8/18
|
100
|
100
|
2.358490566037736
|
2.358490566037736
|
280000000
|
آقاي نوروز زاده
|
2.358490566037736
|
Edit
Details
Delete
|
|
1.5.10
|
استعلام قيمت ، انتخاب پيمانكار
|
7.0d
|
7.0d
|
2024/04/29
|
4/29/2024 12:00:00 AM
|
2024/05/06
|
5/6/2024 12:00:00 AM
|
26
|
1403/2/10
|
1403/2/17
|
100
|
0
|
0
|
1.10062893081761
|
0
|
امور قراردادها,تامين
|
1.10062893081761
|
Edit
Details
Delete
|
|
1.5.11
|
ساخت فيكسچر توليدي و كنترلي به روش ليزر برش / مونتاژ در كارخانه
|
20.0d
|
20.0d
|
2024/05/06
|
5/6/2024 12:00:00 AM
|
2024/05/28
|
5/28/2024 12:00:00 AM
|
27
|
1403/2/17
|
1403/3/8
|
90
|
0
|
0
|
2.8301886792452833
|
0
|
ساپلاير,مهندسي توليد,آقاي نوروز زاده,مهندسي محصول
|
3.1446540880503147
|
Edit
Details
Delete
|
|
1.5.12
|
عقد قرارداد تامين و پيش پرداخت
|
10.0d
|
10.0d
|
2024/04/29
|
4/29/2024 12:00:00 AM
|
2024/05/09
|
5/9/2024 12:00:00 AM
|
23
|
1403/2/10
|
1403/2/20
|
100
|
0
|
0
|
1.5723270440251573
|
0
|
امور قراردادها,تامين,مالي
|
1.5723270440251573
|
Edit
Details
Delete
|
|
1.6
|
مرحله يك روز خط
|
123.375d
|
34.0d
|
2024/05/09
|
5/9/2024 12:00:00 AM
|
2024/09/22
|
9/22/2024 12:00:00 AM
|
|
1403/2/20
|
1403/7/1
|
0
|
0
|
0
|
0
|
0
|
كنترل پروژه
|
5.345911949685536
|
Edit
Details
Delete
|
|
1.6.1
|
سفارش توليد يك روز خط قطعات
|
2.0d
|
2.0d
|
2024/05/09
|
5/9/2024 12:00:00 AM
|
2024/05/12
|
5/12/2024 12:00:00 AM
|
29
|
1403/2/20
|
1403/2/23
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.6.2
|
توليد و ارسال قطعات يك روز خط به كارخانه
|
15.0d
|
15.0d
|
2024/05/12
|
5/12/2024 12:00:00 AM
|
2024/09/05
|
9/5/2024 12:00:00 AM
|
31
|
1403/2/23
|
1403/6/15
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول,كنترل موجودي
|
2.358490566037736
|
Edit
Details
Delete
|
|
1.6.3
|
آديت واحد تضمين كيفيت
|
2.0d
|
2.0d
|
2024/07/15
|
7/15/2024 12:00:00 AM
|
2024/07/17
|
7/17/2024 12:00:00 AM
|
16
|
1403/4/25
|
1403/4/27
|
0
|
0
|
0
|
0
|
0
|
تضمين كيفيت,مهندسي توليد,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.6.4
|
توليد يك روز خط اگزوز در آرمان موتور
|
2.0d
|
2.0d
|
2024/09/05
|
9/5/2024 12:00:00 AM
|
2024/09/08
|
9/8/2024 12:00:00 AM
|
33,28,32
|
1403/6/15
|
1403/6/18
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول,مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.6.5
|
ارسال يك روز خط اگزوز و تست ريپورت آزمون هاي انجام شده به كرمان موتور
|
2.0d
|
2.0d
|
2024/09/08
|
9/8/2024 12:00:00 AM
|
2024/09/10
|
9/10/2024 12:00:00 AM
|
34
|
1403/6/18
|
1403/6/20
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول,آقاي مهندس ابراهيم
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.6.6
|
مونتاژ يك روز خط - تزيينات كرمان موتور
|
5.0d
|
5.0d
|
2024/09/10
|
9/10/2024 12:00:00 AM
|
2024/09/15
|
9/15/2024 12:00:00 AM
|
35
|
1403/6/20
|
1403/6/25
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور,مهندسي توليد
|
0.7861635220125787
|
Edit
Details
Delete
|
|
1.6.7
|
ارزيابي يك روز خط
|
4.0d
|
4.0d
|
2024/09/15
|
9/15/2024 12:00:00 AM
|
2024/09/19
|
9/19/2024 12:00:00 AM
|
36
|
1403/6/25
|
1403/6/29
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور,مهندسي توليد,مهندسي محصول
|
0.628930817610063
|
Edit
Details
Delete
|
|
1.6.8
|
تاييديه يك روز خط
|
2.0d
|
2.0d
|
2024/09/19
|
9/19/2024 12:00:00 AM
|
2024/09/22
|
9/22/2024 12:00:00 AM
|
37
|
1403/6/29
|
1403/7/1
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور,مهندسي توليد,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.6.9
|
پايان فاز اول
|
0.0d
|
0.0d
|
2024/09/22
|
9/22/2024 12:00:00 AM
|
2024/09/22
|
9/22/2024 12:00:00 AM
|
38
|
1403/7/1
|
1403/7/1
|
0
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
2
|
فاز دو ( داخلي سازي مجموعه ابتدايي اگزوز )
|
490.5625d
|
393.0d
|
2023/08/27
|
8/27/2023 12:00:00 AM
|
2025/03/19
|
3/19/2025 12:00:00 AM
|
|
1402/6/5
|
1403/12/29
|
0
|
1
|
0.628930817610063
|
2.20125786163522
|
0
|
|
61.792452830188694
|
Edit
Details
Delete
|
|
2.1
|
مرحله مقدماتي
|
452.5625d
|
163.0d
|
2023/08/27
|
8/27/2023 12:00:00 AM
|
2025/02/05
|
2/5/2025 12:00:00 AM
|
|
1402/6/5
|
1403/11/17
|
0
|
2
|
0.628930817610063
|
2.20125786163522
|
0
|
|
25.62893081761007
|
Edit
Details
Delete
|
|
2.1.1
|
استعلام قيمت قالبسازي مجموعه ابتدايي اگزوز
|
3.0d
|
3.0d
|
2023/08/27
|
8/27/2023 12:00:00 AM
|
2023/08/30
|
8/30/2023 12:00:00 AM
|
12
|
1402/6/5
|
1402/6/8
|
100
|
100
|
0.4716981132075472
|
0.4716981132075472
|
0
|
مهندسي محصول,ساپلاير
|
0.4716981132075472
|
Edit
Details
Delete
|
|
2.1.2
|
انتخاب پيمانكار
|
1.0d
|
1.0d
|
2023/08/30
|
8/30/2023 12:00:00 AM
|
2023/08/31
|
8/31/2023 12:00:00 AM
|
42
|
1402/6/8
|
1402/6/9
|
100
|
100
|
0.15723270440251574
|
0.15723270440251574
|
0
|
تامين
|
0.15723270440251574
|
Edit
Details
Delete
|
|
2.1.3
|
قرارداد قالب سازي
|
10.0d
|
10.0d
|
2024/04/29
|
4/29/2024 12:00:00 AM
|
2024/05/18
|
5/18/2024 12:00:00 AM
|
43
|
1403/2/10
|
1403/2/29
|
100
|
0
|
0
|
1.5723270440251573
|
0
|
امور قراردادها
|
1.5723270440251573
|
Edit
Details
Delete
|
|
2.1.4
|
پيش پرداخت
|
5.0d
|
5.0d
|
2024/05/18
|
5/18/2024 12:00:00 AM
|
2024/05/23
|
5/23/2024 12:00:00 AM
|
44
|
1403/2/29
|
1403/3/3
|
0
|
0
|
0
|
0
|
0
|
مالي,امور قراردادها
|
0.7861635220125787
|
Edit
Details
Delete
|
|
2.1.5
|
قالب سازي
|
45.0d
|
45.0d
|
2024/05/23
|
5/23/2024 12:00:00 AM
|
2024/10/20
|
10/20/2024 12:00:00 AM
|
45
|
1403/3/3
|
1403/7/29
|
0
|
0
|
0
|
0
|
0
|
ساپلاير
|
7.0754716981132075
|
Edit
Details
Delete
|
|
2.1.6
|
ساخت نمونه مطالعاتی و بررسي مونتاژپذيري
|
5.0d
|
5.0d
|
2024/10/20
|
10/20/2024 12:00:00 AM
|
2024/10/26
|
10/26/2024 12:00:00 AM
|
46
|
1403/7/29
|
1403/8/5
|
0
|
0
|
0
|
0
|
0
|
ساپلاير,مهندسي محصول
|
0.7861635220125787
|
Edit
Details
Delete
|
|
2.1.7
|
تست مونتاژ پذيري نمونه مطالعاتی -كارخانه
|
5.0d
|
5.0d
|
2024/10/26
|
10/26/2024 12:00:00 AM
|
2024/10/30
|
10/30/2024 12:00:00 AM
|
47
|
1403/8/5
|
1403/8/9
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول,مهندسي توليد
|
0.7861635220125787
|
Edit
Details
Delete
|
|
2.1.8
|
تحويل نمونه مقدماتي به مهندسي كرمان موتور جهت انجام تست هاي عملكردي
|
2.0d
|
2.0d
|
2024/10/30
|
10/30/2024 12:00:00 AM
|
2024/11/02
|
11/2/2024 12:00:00 AM
|
48
|
1403/8/9
|
1403/8/12
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.1.9
|
تست توان سر چرخ و آلايندگي نمونه مطالعاتي توسط كرمان موتور
|
20.0d
|
20.0d
|
2024/11/02
|
11/2/2024 12:00:00 AM
|
2024/11/24
|
11/24/2024 12:00:00 AM
|
49
|
1403/8/12
|
1403/9/4
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور
|
3.1446540880503147
|
Edit
Details
Delete
|
|
2.1.10
|
بررسي نتايج تست ها و صدور تاييديه
|
7.0d
|
7.0d
|
2024/11/24
|
11/24/2024 12:00:00 AM
|
2024/12/02
|
12/2/2024 12:00:00 AM
|
50
|
1403/9/4
|
1403/9/12
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور,مهندسي محصول
|
1.10062893081761
|
Edit
Details
Delete
|
|
2.1.11
|
انجام تست هاي ذكر شده در تست پلن، تهيه تست ريپورت
|
60.0d
|
60.0d
|
2024/12/02
|
12/2/2024 12:00:00 AM
|
2025/02/05
|
2/5/2025 12:00:00 AM
|
51
|
1403/9/12
|
1403/11/17
|
0
|
0
|
0
|
0
|
0
|
|
9.433962264150944
|
Edit
Details
Delete
|
|
2.2
|
مرحله توليد و تاييد نمونه اوليه
|
74.0d
|
84.0d
|
2024/12/02
|
12/2/2024 12:00:00 AM
|
2025/02/20
|
2/20/2025 12:00:00 AM
|
|
1403/9/12
|
1403/12/2
|
0
|
0
|
0
|
0
|
0
|
|
13.207547169811319
|
Edit
Details
Delete
|
|
2.2.1
|
توليد 3 ست بعنوان نمونه اوليه
|
5.0d
|
5.0d
|
2024/12/02
|
12/2/2024 12:00:00 AM
|
2024/12/07
|
12/7/2024 12:00:00 AM
|
51
|
1403/9/12
|
1403/9/17
|
0
|
0
|
0
|
0
|
0
|
ساپلاير,مهندسي محصول
|
0.7861635220125787
|
Edit
Details
Delete
|
|
2.2.2
|
ارسال نمونه هاي اوليه به كارخانه
|
2.0d
|
2.0d
|
2024/12/07
|
12/7/2024 12:00:00 AM
|
2024/12/09
|
12/9/2024 12:00:00 AM
|
54
|
1403/9/17
|
1403/9/19
|
0
|
0
|
0
|
0
|
0
|
كنترل موجودي,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.2.3
|
بررسي نمونه هاي اوليه توسط واحد مهندسي آرمان موتور
|
2.0d
|
2.0d
|
2024/12/09
|
12/9/2024 12:00:00 AM
|
2024/12/11
|
12/11/2024 12:00:00 AM
|
55
|
1403/9/19
|
1403/9/21
|
0
|
0
|
0
|
0
|
0
|
مهندسي كرمان موتور,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.2.4
|
ارسال نمونه هاي اوليه به كرمان موتور
|
2.0d
|
2.0d
|
2024/12/11
|
12/11/2024 12:00:00 AM
|
2024/12/14
|
12/14/2024 12:00:00 AM
|
56
|
1403/9/21
|
1403/9/24
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد,مهندسي كرمان موتور
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.2.5
|
بررسي و ارزيابي نمونه اوليه توسط كرمان موتور
|
2.0d
|
2.0d
|
2024/12/14
|
12/14/2024 12:00:00 AM
|
2024/12/16
|
12/16/2024 12:00:00 AM
|
57
|
1403/9/24
|
1403/9/26
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد,مهندسي كرمان موتور
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.2.6
|
اعلام نتايج بررسي نمونه ها و اخذ تاييديه
|
2.0d
|
2.0d
|
2024/12/16
|
12/16/2024 12:00:00 AM
|
2024/12/18
|
12/18/2024 12:00:00 AM
|
58
|
1403/9/26
|
1403/9/28
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد,مهندسي كرمان موتور
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.2.7
|
ارسال نمونه تاييد شده به تهران جهت تهيه نقشه
|
2.0d
|
2.0d
|
2024/12/18
|
12/18/2024 12:00:00 AM
|
2024/12/21
|
12/21/2024 12:00:00 AM
|
59
|
1403/9/28
|
1403/10/1
|
0
|
0
|
0
|
0
|
0
|
كنترل موجودي,مهندسي توليد,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.2.8
|
اسكن و مدلسازي
|
15.0d
|
15.0d
|
2024/12/21
|
12/21/2024 12:00:00 AM
|
2025/01/06
|
1/6/2025 12:00:00 AM
|
60
|
1403/10/1
|
1403/10/17
|
0
|
0
|
0
|
0
|
0
|
ساپلاير,مهندسي محصول
|
2.358490566037736
|
Edit
Details
Delete
|
|
2.2.9
|
طراحي فيكسچر توليدي و كنترلي و درخواست خدمات
|
15.0d
|
15.0d
|
2025/01/06
|
1/6/2025 12:00:00 AM
|
2025/01/22
|
1/22/2025 12:00:00 AM
|
61
|
1403/10/17
|
1403/11/3
|
0
|
0
|
0
|
0
|
0
|
آقاي نوروز زاده
|
2.358490566037736
|
Edit
Details
Delete
|
|
2.2.10
|
استعلام قيمت ، انتخاب پيمانكار
|
7.0d
|
7.0d
|
2025/01/22
|
1/22/2025 12:00:00 AM
|
2025/01/29
|
1/29/2025 12:00:00 AM
|
62
|
1403/11/3
|
1403/11/10
|
0
|
0
|
0
|
0
|
0
|
تامين
|
1.10062893081761
|
Edit
Details
Delete
|
|
2.2.11
|
ساخت فيكسچر توليدي و كنترلي به روش ليزر برش / مونتاژ در كارخانه
|
20.0d
|
20.0d
|
2025/01/30
|
1/30/2025 12:00:00 AM
|
2025/02/20
|
2/20/2025 12:00:00 AM
|
63
|
1403/11/11
|
1403/12/2
|
0
|
0
|
0
|
0
|
0
|
ساپلاير,مهندسي توليد,مهندسي محصول
|
3.1446540880503147
|
Edit
Details
Delete
|
|
2.2.12
|
عقد قرارداد تامين و پيش پرداخت
|
10.0d
|
10.0d
|
2024/12/18
|
12/18/2024 12:00:00 AM
|
2024/12/29
|
12/29/2024 12:00:00 AM
|
59
|
1403/9/28
|
1403/10/9
|
0
|
0
|
0
|
0
|
0
|
امور قراردادها,تامين,مالي
|
1.5723270440251573
|
Edit
Details
Delete
|
|
2.3
|
مرحله يك روز خط
|
292.3125d
|
146.0d
|
2024/05/02
|
5/2/2024 12:00:00 AM
|
2025/03/19
|
3/19/2025 12:00:00 AM
|
|
1403/2/13
|
1403/12/29
|
0
|
0
|
0
|
0
|
0
|
|
22.955974842767294
|
Edit
Details
Delete
|
|
2.3.1
|
سفارش توليد يك روز خط قطعات
|
2.0d
|
2.0d
|
2024/12/29
|
12/29/2024 12:00:00 AM
|
2024/12/31
|
12/31/2024 12:00:00 AM
|
65
|
1403/10/9
|
1403/10/11
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.3.2
|
توليد و ارسال قطعات يك روز خط به كارخانه
|
7.0d
|
7.0d
|
2025/02/20
|
2/20/2025 12:00:00 AM
|
2025/03/01
|
3/1/2025 12:00:00 AM
|
67,64
|
1403/12/2
|
1403/12/11
|
0
|
0
|
0
|
0
|
0
|
ساپلاير,كنترل موجودي,مهندسي محصول
|
1.10062893081761
|
Edit
Details
Delete
|
|
2.3.3
|
آديت واحد تضمين كيفيت
|
2.0d
|
2.0d
|
2025/03/01
|
3/1/2025 12:00:00 AM
|
2025/03/03
|
3/3/2025 12:00:00 AM
|
68,52
|
1403/12/11
|
1403/12/13
|
0
|
0
|
0
|
0
|
0
|
تضمين كيفيت,مهندسي توليد,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.3.4
|
توليد يك روز خط اگزوز در آرمان موتور
|
2.0d
|
2.0d
|
2025/03/03
|
3/3/2025 12:00:00 AM
|
2025/03/05
|
3/5/2025 12:00:00 AM
|
69
|
1403/12/13
|
1403/12/15
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.3.5
|
ارسال يك روز خط اگزوز و تست ريپورت آزمون هاي انجام شده به كرمان موتور
|
2.0d
|
2.0d
|
2025/03/05
|
3/5/2025 12:00:00 AM
|
2025/03/08
|
3/8/2025 12:00:00 AM
|
70
|
1403/12/15
|
1403/12/18
|
0
|
0
|
0
|
0
|
0
|
كنترل موجودي,مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.3.6
|
مونتاژ يك روز خط - تزيينات كرمان موتور
|
5.0d
|
5.0d
|
2025/03/08
|
3/8/2025 12:00:00 AM
|
2025/03/12
|
3/12/2025 12:00:00 AM
|
71
|
1403/12/18
|
1403/12/22
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد
|
0.7861635220125787
|
Edit
Details
Delete
|
|
2.3.7
|
ارزيابي يك روز خط
|
4.0d
|
4.0d
|
2025/03/12
|
3/12/2025 12:00:00 AM
|
2025/03/17
|
3/17/2025 12:00:00 AM
|
72
|
1403/12/22
|
1403/12/27
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد,مهندسي كرمان موتور
|
0.628930817610063
|
Edit
Details
Delete
|
|
2.3.8
|
تاييديه يك روز خط
|
2.0d
|
2.0d
|
2025/03/17
|
3/17/2025 12:00:00 AM
|
2025/03/19
|
3/19/2025 12:00:00 AM
|
73
|
1403/12/27
|
1403/12/29
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد,مهندسي كرمان موتور,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.3.9
|
تكميل مدارك مطابق دستور العمل تكوين محصول
|
120.0d
|
120.0d
|
2024/05/02
|
5/2/2024 12:00:00 AM
|
2024/12/29
|
12/29/2024 12:00:00 AM
|
6
|
1403/2/13
|
1403/10/9
|
0
|
0
|
0
|
0
|
0
|
تضمين كيفيت,مهندسي محصول
|
18.867924528301888
|
Edit
Details
Delete
|
|
2.3.10
|
پايان فاز دوم
|
0.0d
|
0.0d
|
2025/03/19
|
3/19/2025 12:00:00 AM
|
2025/03/19
|
3/19/2025 12:00:00 AM
|
74,75
|
1403/12/29
|
1403/12/29
|
0
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
0
|
KMC X5-PJPR-02-005
|
1.10326
|
1.10326
|
2023/07/15
|
2023-07-15 08:00
|
2025/03/19
|
2025-03-19 11:30
|
|
1402/4/24
|
1403/12/29
|
0
|
17.0
|
0
|
90.7583
|
1.34834339E9
|
|
100.00000000000001
|
Edit
Details
Delete
|
|
1
|
فاز يك (داخلي سازي مجموعه منبع هاي اگزوز )
|
0.764844
|
0.764844
|
2023/07/15
|
2023-07-15 08:00
|
2024/09/22
|
2024-09-22 12:30
|
|
1402/4/24
|
1403/7/1
|
0
|
43.0
|
0
|
158.634
|
1.34834339E9
|
|
38.20754716981132
|
Edit
Details
Delete
|
|
1.1
|
جلسه DFMEA
|
0.0104167
|
0.0104167
|
2023/07/15
|
2023-07-15 08:00
|
2023/07/19
|
2023-07-19 14:00
|
|
1402/4/24
|
1402/4/28
|
100
|
100.0
|
0
|
5
|
0.0
|
|
0.7861635220125787
|
Edit
Details
Delete
|
|
1.2
|
توجيه اقتصادي پروژه-تاييد امكان سنجي
|
0.0104167
|
0.0104167
|
2023/07/25
|
2023-07-25 11:30
|
2023/08/01
|
2023-08-01 09:00
|
2
|
1402/5/3
|
1402/5/10
|
100
|
100.0
|
0
|
5
|
0.0
|
|
0.7861635220125787
|
Edit
Details
Delete
|
|
1.3
|
شروع پروژه
|
0
|
0
|
2023/08/01
|
2023-08-01 09:00
|
2023/08/01
|
2023-08-01 09:00
|
3
|
1402/5/10
|
1402/5/10
|
100
|
100.0
|
0
|
0
|
0.0
|
كنترل پروژه
|
0.0
|
Edit
Details
Delete
|
|
1.4
|
مرحله مقدماتي
|
0.603516
|
0.603516
|
2023/08/01
|
2023-08-01 09:00
|
2024/07/15
|
2024-07-15 14:30
|
|
1402/5/10
|
1403/4/25
|
0
|
42.0
|
0
|
120.913
|
7.84309477E8
|
كنترل پروژه
|
18.081761006289312
|
Edit
Details
Delete
|
|
1.4.1
|
دريافت اطلاعات فني از مشتري (نقشه، شناسنامه فني ، تست پلن و ...)
|
0.0145833
|
0.0145833
|
2023/08/01
|
2023-08-01 09:00
|
2024/05/02
|
2024-05-02 10:30
|
3
|
1402/5/10
|
1403/2/13
|
100
|
100.0
|
0
|
7
|
0.0
|
مهندسي محصول
|
1.10062893081761
|
Edit
Details
Delete
|
|
1.4.2
|
دريافت نمونه اگزوز وارداتي (منفصله و مجموعه كامل)
|
0.00208333
|
0.00208333
|
2023/08/01
|
2023-08-01 09:00
|
2023/08/02
|
2023-08-02 08:30
|
3
|
1402/5/10
|
1402/5/11
|
100
|
100.0
|
0
|
1
|
4.90013394E8
|
مهندسي محصول
|
0.15723270440251574
|
Edit
Details
Delete
|
|
1.4.3
|
انتخاب پيمانكار
|
0.00208333
|
0.00208333
|
2023/08/01
|
2023-08-01 09:00
|
2023/08/02
|
2023-08-02 08:30
|
3
|
1402/5/10
|
1402/5/11
|
100
|
100.0
|
0
|
1
|
2.94296083E8
|
مهندسي محصول,تامين
|
0.15723270440251574
|
Edit
Details
Delete
|
|
1.4.4
|
مذاکره با پیمانکار جهت بررسي و امكان سنجي ساخت داخل اگزوز
|
0.00416667
|
0.00416667
|
2023/08/01
|
2023-08-01 09:00
|
2023/08/02
|
2023-08-02 16:30
|
3
|
1402/5/10
|
1402/5/11
|
100
|
100.0
|
0
|
2
|
0.0
|
تامين,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.4.5
|
ساخت نمونه مطالعاتي منبع ها
|
0.0145833
|
0.0145833
|
2023/08/10
|
2023-08-10 13:00
|
2023/08/19
|
2023-08-19 09:30
|
9
|
1402/5/19
|
1402/5/28
|
100
|
100.0
|
0
|
7
|
0.0
|
مهندسي محصول,ساپلاير
|
1.10062893081761
|
Edit
Details
Delete
|
|
1.4.6
|
بررسي مونتاژ پذيري نمونه منبع ها بر روي خودرو
|
0.00208333
|
0.00208333
|
2023/08/19
|
2023-08-19 09:30
|
2023/08/20
|
2023-08-20 09:00
|
10
|
1402/5/28
|
1402/5/29
|
100
|
100.0
|
0
|
1
|
0.0
|
مهندسي محصول,ساپلاير
|
0.15723270440251574
|
Edit
Details
Delete
|
|
1.4.7
|
اصلاح در صورت نياز
|
0.0145833
|
0.0145833
|
2023/08/20
|
2023-08-20 09:00
|
2023/08/27
|
2023-08-27 14:00
|
11
|
1402/5/29
|
1402/6/5
|
100
|
100.0
|
0
|
7
|
0.0
|
|
1.10062893081761
|
Edit
Details
Delete
|
|
1.4.8
|
تحويل نمونه مقدماتي به كادك/مهندسي كرمان موتور جهت انجام تست هاي عملكردي
|
0.00416667
|
0.00416667
|
2023/08/27
|
2023-08-27 14:00
|
2023/08/29
|
2023-08-29 13:00
|
12
|
1402/6/5
|
1402/6/7
|
100
|
100.0
|
0
|
2
|
0.0
|
مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.4.9
|
تست توان سر چرخ و آلايندگي نمونه مطالعاتي توسط كرمان موتور
|
0.0416667
|
0.0416667
|
2023/08/29
|
2023-08-29 13:00
|
2023/10/05
|
2023-10-05 11:30
|
13
|
1402/6/7
|
1402/7/13
|
100
|
100.0
|
0
|
20
|
0.0
|
مهندسي كرمان موتور,مهندسي محصول
|
3.1446540880503147
|
Edit
Details
Delete
|
|
1.4.10
|
بررسي نتايج تست ها و صدور تاييديه
|
0.0145833
|
0.0145833
|
2024/04/29
|
2024-04-29 08:00
|
2024/05/06
|
2024-05-06 13:00
|
14
|
1403/2/10
|
1403/2/17
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي كرمان موتور
|
1.10062893081761
|
Edit
Details
Delete
|
|
1.4.11
|
انجام تست هاي ذكر شده در تست پلن، تهيه تست ريپورت
|
0.125
|
0.125
|
2024/05/02
|
2024-05-02 10:30
|
2024/07/15
|
2024-07-15 14:30
|
6
|
1403/2/13
|
1403/4/25
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي محصول,آقاي مهندس ابراهيم
|
9.433962264150944
|
Edit
Details
Delete
|
|
1.5
|
مرحله توليد و تاييد نمونه اوليه
|
0.431901
|
0.431901
|
2023/09/13
|
2023-09-13 10:30
|
2024/05/28
|
2024-05-28 11:30
|
|
1402/6/22
|
1403/3/8
|
0
|
56.0
|
0
|
115.996
|
5.64033913E8
|
كنترل پروژه
|
13.207547169811319
|
Edit
Details
Delete
|
|
1.5.1
|
توليد 2 ست بعنوان نمونه اوليه
|
0.0104167
|
0.0104167
|
2023/09/13
|
2023-09-13 10:30
|
2023/09/20
|
2023-09-20 16:30
|
14
|
1402/6/22
|
1402/6/29
|
100
|
100.0
|
0
|
5
|
0.0
|
مهندسي محصول,ساپلاير
|
0.7861635220125787
|
Edit
Details
Delete
|
|
1.5.2
|
ارسال نمونه هاي اوليه به كارخانه
|
0.00416667
|
0.00416667
|
2023/09/21
|
2023-09-21 08:00
|
2023/09/23
|
2023-09-23 15:30
|
18
|
1402/6/30
|
1402/7/1
|
100
|
100.0
|
0
|
2
|
0.0
|
مهندسي محصول,كنترل موجودي
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.5.3
|
بررسي نمونه هاي اوليه توسط واحد مهندسي آرمان موتور
|
0.00416667
|
0.00416667
|
2023/09/23
|
2023-09-23 15:30
|
2023/09/26
|
2023-09-26 14:30
|
19
|
1402/7/1
|
1402/7/4
|
100
|
100.0
|
0
|
2
|
0.0
|
مهندسي محصول,مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.5.4
|
ارسال نمونه هاي اوليه به كرمان موتور
|
0.00416667
|
0.00416667
|
2023/09/26
|
2023-09-26 14:30
|
2023/09/28
|
2023-09-28 13:30
|
20
|
1402/7/4
|
1402/7/6
|
100
|
100.0
|
0
|
2
|
2.5873913E7
|
مهندسي كرمان موتور,مهندسي محصول,كنترل موجودي,مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.5.5
|
بررسي و ارزيابي نمونه اوليه توسط كرمان موتور
|
0.00416667
|
0.00416667
|
2023/09/28
|
2023-09-28 13:30
|
2023/10/01
|
2023-10-01 12:30
|
21
|
1402/7/6
|
1402/7/9
|
100
|
100.0
|
0
|
2
|
0.0
|
مهندسي كرمان موتور,مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.5.6
|
اعلام نتايج بررسي نمونه ها و اخذ تاييديه
|
0.00416667
|
0.00416667
|
2023/10/01
|
2023-10-01 12:30
|
2023/10/05
|
2023-10-05 11:30
|
22
|
1402/7/9
|
1402/7/13
|
100
|
100.0
|
0
|
2
|
0.0
|
مهندسي كرمان موتور,مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.5.7
|
ارسال نمونه تاييد شده به تهران جهت تهيه نقشه
|
0.00416667
|
0.00416667
|
2023/10/05
|
2023-10-05 11:30
|
2023/10/08
|
2023-10-08 10:30
|
23
|
1402/7/13
|
1402/7/16
|
100
|
100.0
|
0
|
2
|
0.0
|
مهندسي محصول,مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.5.8
|
اسكن و مدلسازي
|
0.03125
|
0.03125
|
2023/10/08
|
2023-10-08 10:30
|
2023/10/24
|
2023-10-24 11:30
|
24
|
1402/7/16
|
1402/8/2
|
100
|
100.0
|
0
|
15
|
2.5816E8
|
ساپلاير,مهندسي محصول
|
2.358490566037736
|
Edit
Details
Delete
|
|
1.5.9
|
طراحي فيكسچر توليدي و كنترلي و درخواست خدمات
|
0.03125
|
0.03125
|
2023/10/24
|
2023-10-24 11:30
|
2023/11/09
|
2023-11-09 12:30
|
25
|
1402/8/2
|
1402/8/18
|
100
|
100.0
|
0
|
15
|
2.8E8
|
آقاي نوروز زاده
|
2.358490566037736
|
Edit
Details
Delete
|
|
1.5.10
|
استعلام قيمت ، انتخاب پيمانكار
|
0.0145833
|
0.0145833
|
2024/04/29
|
2024-04-29 08:00
|
2024/05/06
|
2024-05-06 13:00
|
26
|
1403/2/10
|
1403/2/17
|
100
|
0.0
|
0
|
0
|
0.0
|
امور قراردادها,تامين
|
1.10062893081761
|
Edit
Details
Delete
|
|
1.5.11
|
ساخت فيكسچر توليدي و كنترلي به روش ليزر برش / مونتاژ در كارخانه
|
0.0416667
|
0.0416667
|
2024/05/06
|
2024-05-06 13:00
|
2024/05/28
|
2024-05-28 11:30
|
27
|
1403/2/17
|
1403/3/8
|
90
|
0.0
|
0
|
0
|
0.0
|
ساپلاير,مهندسي توليد,آقاي نوروز زاده,مهندسي محصول
|
3.1446540880503147
|
Edit
Details
Delete
|
|
1.5.12
|
عقد قرارداد تامين و پيش پرداخت
|
0.0208333
|
0.0208333
|
2024/04/29
|
2024-04-29 08:00
|
2024/05/09
|
2024-05-09 11:30
|
23
|
1403/2/10
|
1403/2/20
|
100
|
0.0
|
0
|
0
|
0.0
|
امور قراردادها,تامين,مالي
|
1.5723270440251573
|
Edit
Details
Delete
|
|
1.6
|
مرحله يك روز خط
|
0.257031
|
0.257031
|
2024/05/09
|
2024-05-09 11:30
|
2024/09/22
|
2024-09-22 12:30
|
|
1403/2/20
|
1403/7/1
|
0
|
0.0
|
0
|
0
|
0.0
|
كنترل پروژه
|
5.345911949685536
|
Edit
Details
Delete
|
|
1.6.1
|
سفارش توليد يك روز خط قطعات
|
0.00416667
|
0.00416667
|
2024/05/09
|
2024-05-09 11:30
|
2024/05/12
|
2024-05-12 10:30
|
29
|
1403/2/20
|
1403/2/23
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.6.2
|
توليد و ارسال قطعات يك روز خط به كارخانه
|
0.03125
|
0.03125
|
2024/05/12
|
2024-05-12 10:30
|
2024/09/05
|
2024-09-05 11:30
|
31
|
1403/2/23
|
1403/6/15
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي محصول,كنترل موجودي
|
2.358490566037736
|
Edit
Details
Delete
|
|
1.6.3
|
آديت واحد تضمين كيفيت
|
0.00416667
|
0.00416667
|
2024/07/15
|
2024-07-15 14:30
|
2024/07/17
|
2024-07-17 13:30
|
16
|
1403/4/25
|
1403/4/27
|
0
|
0.0
|
0
|
0
|
0.0
|
تضمين كيفيت,مهندسي توليد,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.6.4
|
توليد يك روز خط اگزوز در آرمان موتور
|
0.00416667
|
0.00416667
|
2024/09/05
|
2024-09-05 11:30
|
2024/09/08
|
2024-09-08 10:30
|
33,28,32
|
1403/6/15
|
1403/6/18
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي محصول,مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.6.5
|
ارسال يك روز خط اگزوز و تست ريپورت آزمون هاي انجام شده به كرمان موتور
|
0.00416667
|
0.00416667
|
2024/09/08
|
2024-09-08 10:30
|
2024/09/10
|
2024-09-10 09:30
|
34
|
1403/6/18
|
1403/6/20
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي محصول,آقاي مهندس ابراهيم
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.6.6
|
مونتاژ يك روز خط - تزيينات كرمان موتور
|
0.0104167
|
0.0104167
|
2024/09/10
|
2024-09-10 09:30
|
2024/09/15
|
2024-09-15 15:30
|
35
|
1403/6/20
|
1403/6/25
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي كرمان موتور,مهندسي توليد
|
0.7861635220125787
|
Edit
Details
Delete
|
|
1.6.7
|
ارزيابي يك روز خط
|
0.00833333
|
0.00833333
|
2024/09/15
|
2024-09-15 15:30
|
2024/09/19
|
2024-09-19 13:30
|
36
|
1403/6/25
|
1403/6/29
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي كرمان موتور,مهندسي توليد,مهندسي محصول
|
0.628930817610063
|
Edit
Details
Delete
|
|
1.6.8
|
تاييديه يك روز خط
|
0.00416667
|
0.00416667
|
2024/09/19
|
2024-09-19 13:30
|
2024/09/22
|
2024-09-22 12:30
|
37
|
1403/6/29
|
1403/7/1
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي كرمان موتور,مهندسي توليد,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
1.6.9
|
پايان فاز اول
|
0
|
0
|
2024/09/22
|
2024-09-22 12:30
|
2024/09/22
|
2024-09-22 12:30
|
38
|
1403/7/1
|
1403/7/1
|
0
|
0.0
|
0
|
0
|
0.0
|
|
0.0
|
Edit
Details
Delete
|
|
2
|
فاز دو ( داخلي سازي مجموعه ابتدايي اگزوز )
|
1.02201
|
1.02201
|
2023/08/27
|
2023-08-27 14:00
|
2025/03/19
|
2025-03-19 11:30
|
|
1402/6/5
|
1403/12/29
|
0
|
1.0
|
0
|
4.99292
|
0.0
|
|
61.792452830188694
|
Edit
Details
Delete
|
|
2.1
|
مرحله مقدماتي
|
0.942839
|
0.942839
|
2023/08/27
|
2023-08-27 14:00
|
2025/02/05
|
2025-02-05 13:30
|
|
1402/6/5
|
1403/11/17
|
0
|
2.0
|
0
|
11.1058
|
0.0
|
|
25.62893081761007
|
Edit
Details
Delete
|
|
2.1.1
|
استعلام قيمت قالبسازي مجموعه ابتدايي اگزوز
|
0.00625
|
0.00625
|
2023/08/27
|
2023-08-27 14:00
|
2023/08/30
|
2023-08-30 12:30
|
12
|
1402/6/5
|
1402/6/8
|
100
|
100.0
|
0
|
3
|
0.0
|
مهندسي محصول,ساپلاير
|
0.4716981132075472
|
Edit
Details
Delete
|
|
2.1.2
|
انتخاب پيمانكار
|
0.00208333
|
0.00208333
|
2023/08/30
|
2023-08-30 12:30
|
2023/08/31
|
2023-08-31 12:00
|
42
|
1402/6/8
|
1402/6/9
|
100
|
100.0
|
0
|
1
|
0.0
|
تامين
|
0.15723270440251574
|
Edit
Details
Delete
|
|
2.1.3
|
قرارداد قالب سازي
|
0.0208333
|
0.0208333
|
2024/04/29
|
2024-04-29 08:00
|
2024/05/18
|
2024-05-18 11:30
|
43
|
1403/2/10
|
1403/2/29
|
100
|
0.0
|
0
|
0
|
0.0
|
امور قراردادها
|
1.5723270440251573
|
Edit
Details
Delete
|
|
2.1.4
|
پيش پرداخت
|
0.0104167
|
0.0104167
|
2024/05/18
|
2024-05-18 11:30
|
2024/05/23
|
2024-05-23 09:00
|
44
|
1403/2/29
|
1403/3/3
|
0
|
0.0
|
0
|
0
|
0.0
|
مالي,امور قراردادها
|
0.7861635220125787
|
Edit
Details
Delete
|
|
2.1.5
|
قالب سازي
|
0.09375
|
0.09375
|
2024/05/23
|
2024-05-23 09:00
|
2024/10/20
|
2024-10-20 12:00
|
45
|
1403/3/3
|
1403/7/29
|
0
|
0.0
|
0
|
0
|
0.0
|
ساپلاير
|
7.0754716981132075
|
Edit
Details
Delete
|
|
2.1.6
|
ساخت نمونه مطالعاتی و بررسي مونتاژپذيري
|
0.0104167
|
0.0104167
|
2024/10/20
|
2024-10-20 12:00
|
2024/10/26
|
2024-10-26 09:30
|
46
|
1403/7/29
|
1403/8/5
|
0
|
0.0
|
0
|
0
|
0.0
|
ساپلاير,مهندسي محصول
|
0.7861635220125787
|
Edit
Details
Delete
|
|
2.1.7
|
تست مونتاژ پذيري نمونه مطالعاتی -كارخانه
|
0.0104167
|
0.0104167
|
2024/10/26
|
2024-10-26 09:30
|
2024/10/30
|
2024-10-30 15:30
|
47
|
1403/8/5
|
1403/8/9
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي محصول,مهندسي توليد
|
0.7861635220125787
|
Edit
Details
Delete
|
|
2.1.8
|
تحويل نمونه مقدماتي به مهندسي كرمان موتور جهت انجام تست هاي عملكردي
|
0.00416667
|
0.00416667
|
2024/10/30
|
2024-10-30 15:30
|
2024/11/02
|
2024-11-02 14:30
|
48
|
1403/8/9
|
1403/8/12
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي كرمان موتور,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.1.9
|
تست توان سر چرخ و آلايندگي نمونه مطالعاتي توسط كرمان موتور
|
0.0416667
|
0.0416667
|
2024/11/02
|
2024-11-02 14:30
|
2024/11/24
|
2024-11-24 13:00
|
49
|
1403/8/12
|
1403/9/4
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي كرمان موتور
|
3.1446540880503147
|
Edit
Details
Delete
|
|
2.1.10
|
بررسي نتايج تست ها و صدور تاييديه
|
0.0145833
|
0.0145833
|
2024/11/24
|
2024-11-24 13:00
|
2024/12/02
|
2024-12-02 09:30
|
50
|
1403/9/4
|
1403/9/12
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي كرمان موتور,مهندسي محصول
|
1.10062893081761
|
Edit
Details
Delete
|
|
2.1.11
|
انجام تست هاي ذكر شده در تست پلن، تهيه تست ريپورت
|
0.125
|
0.125
|
2024/12/02
|
2024-12-02 09:30
|
2025/02/05
|
2025-02-05 13:30
|
51
|
1403/9/12
|
1403/11/17
|
0
|
0.0
|
0
|
0
|
0.0
|
|
9.433962264150944
|
Edit
Details
Delete
|
|
2.2
|
مرحله توليد و تاييد نمونه اوليه
|
0.154167
|
0.154167
|
2024/12/02
|
2024-12-02 09:30
|
2025/02/20
|
2025-02-20 15:00
|
|
1403/9/12
|
1403/12/2
|
0
|
0.0
|
0
|
0
|
0.0
|
|
13.207547169811319
|
Edit
Details
Delete
|
|
2.2.1
|
توليد 3 ست بعنوان نمونه اوليه
|
0.0104167
|
0.0104167
|
2024/12/02
|
2024-12-02 09:30
|
2024/12/07
|
2024-12-07 15:30
|
51
|
1403/9/12
|
1403/9/17
|
0
|
0.0
|
0
|
0
|
0.0
|
ساپلاير,مهندسي محصول
|
0.7861635220125787
|
Edit
Details
Delete
|
|
2.2.2
|
ارسال نمونه هاي اوليه به كارخانه
|
0.00416667
|
0.00416667
|
2024/12/07
|
2024-12-07 15:30
|
2024/12/09
|
2024-12-09 14:30
|
54
|
1403/9/17
|
1403/9/19
|
0
|
0.0
|
0
|
0
|
0.0
|
كنترل موجودي,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.2.3
|
بررسي نمونه هاي اوليه توسط واحد مهندسي آرمان موتور
|
0.00416667
|
0.00416667
|
2024/12/09
|
2024-12-09 14:30
|
2024/12/11
|
2024-12-11 13:30
|
55
|
1403/9/19
|
1403/9/21
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي كرمان موتور,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.2.4
|
ارسال نمونه هاي اوليه به كرمان موتور
|
0.00416667
|
0.00416667
|
2024/12/11
|
2024-12-11 13:30
|
2024/12/14
|
2024-12-14 12:30
|
56
|
1403/9/21
|
1403/9/24
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي توليد,مهندسي كرمان موتور
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.2.5
|
بررسي و ارزيابي نمونه اوليه توسط كرمان موتور
|
0.00416667
|
0.00416667
|
2024/12/14
|
2024-12-14 12:30
|
2024/12/16
|
2024-12-16 11:30
|
57
|
1403/9/24
|
1403/9/26
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي توليد,مهندسي كرمان موتور
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.2.6
|
اعلام نتايج بررسي نمونه ها و اخذ تاييديه
|
0.00416667
|
0.00416667
|
2024/12/16
|
2024-12-16 11:30
|
2024/12/18
|
2024-12-18 10:30
|
58
|
1403/9/26
|
1403/9/28
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي توليد,مهندسي كرمان موتور
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.2.7
|
ارسال نمونه تاييد شده به تهران جهت تهيه نقشه
|
0.00416667
|
0.00416667
|
2024/12/18
|
2024-12-18 10:30
|
2024/12/21
|
2024-12-21 09:30
|
59
|
1403/9/28
|
1403/10/1
|
0
|
0.0
|
0
|
0
|
0.0
|
كنترل موجودي,مهندسي توليد,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.2.8
|
اسكن و مدلسازي
|
0.03125
|
0.03125
|
2024/12/21
|
2024-12-21 09:30
|
2025/01/06
|
2025-01-06 10:30
|
60
|
1403/10/1
|
1403/10/17
|
0
|
0.0
|
0
|
0
|
0.0
|
ساپلاير,مهندسي محصول
|
2.358490566037736
|
Edit
Details
Delete
|
|
2.2.9
|
طراحي فيكسچر توليدي و كنترلي و درخواست خدمات
|
0.03125
|
0.03125
|
2025/01/06
|
2025-01-06 10:30
|
2025/01/22
|
2025-01-22 11:30
|
61
|
1403/10/17
|
1403/11/3
|
0
|
0.0
|
0
|
0
|
0.0
|
آقاي نوروز زاده
|
2.358490566037736
|
Edit
Details
Delete
|
|
2.2.10
|
استعلام قيمت ، انتخاب پيمانكار
|
0.0145833
|
0.0145833
|
2025/01/22
|
2025-01-22 11:30
|
2025/01/29
|
2025-01-29 16:30
|
62
|
1403/11/3
|
1403/11/10
|
0
|
0.0
|
0
|
0
|
0.0
|
تامين
|
1.10062893081761
|
Edit
Details
Delete
|
|
2.2.11
|
ساخت فيكسچر توليدي و كنترلي به روش ليزر برش / مونتاژ در كارخانه
|
0.0416667
|
0.0416667
|
2025/01/30
|
2025-01-30 08:00
|
2025/02/20
|
2025-02-20 15:00
|
63
|
1403/11/11
|
1403/12/2
|
0
|
0.0
|
0
|
0
|
0.0
|
ساپلاير,مهندسي توليد,مهندسي محصول
|
3.1446540880503147
|
Edit
Details
Delete
|
|
2.2.12
|
عقد قرارداد تامين و پيش پرداخت
|
0.0208333
|
0.0208333
|
2024/12/18
|
2024-12-18 10:30
|
2024/12/29
|
2024-12-29 14:00
|
59
|
1403/9/28
|
1403/10/9
|
0
|
0.0
|
0
|
0
|
0.0
|
امور قراردادها,تامين,مالي
|
1.5723270440251573
|
Edit
Details
Delete
|
|
2.3
|
مرحله يك روز خط
|
0.608984
|
0.608984
|
2024/05/02
|
2024-05-02 10:30
|
2025/03/19
|
2025-03-19 11:30
|
|
1403/2/13
|
1403/12/29
|
0
|
0.0
|
0
|
0
|
0.0
|
|
22.955974842767294
|
Edit
Details
Delete
|
|
2.3.1
|
سفارش توليد يك روز خط قطعات
|
0.00416667
|
0.00416667
|
2024/12/29
|
2024-12-29 14:00
|
2024/12/31
|
2024-12-31 13:00
|
65
|
1403/10/9
|
1403/10/11
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.3.2
|
توليد و ارسال قطعات يك روز خط به كارخانه
|
0.0145833
|
0.0145833
|
2025/02/20
|
2025-02-20 15:00
|
2025/03/01
|
2025-03-01 11:30
|
67,64
|
1403/12/2
|
1403/12/11
|
0
|
0.0
|
0
|
0
|
0.0
|
ساپلاير,كنترل موجودي,مهندسي محصول
|
1.10062893081761
|
Edit
Details
Delete
|
|
2.3.3
|
آديت واحد تضمين كيفيت
|
0.00416667
|
0.00416667
|
2025/03/01
|
2025-03-01 11:30
|
2025/03/03
|
2025-03-03 10:30
|
68,52
|
1403/12/11
|
1403/12/13
|
0
|
0.0
|
0
|
0
|
0.0
|
تضمين كيفيت,مهندسي توليد,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.3.4
|
توليد يك روز خط اگزوز در آرمان موتور
|
0.00416667
|
0.00416667
|
2025/03/03
|
2025-03-03 10:30
|
2025/03/05
|
2025-03-05 09:30
|
69
|
1403/12/13
|
1403/12/15
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.3.5
|
ارسال يك روز خط اگزوز و تست ريپورت آزمون هاي انجام شده به كرمان موتور
|
0.00416667
|
0.00416667
|
2025/03/05
|
2025-03-05 09:30
|
2025/03/08
|
2025-03-08 08:30
|
70
|
1403/12/15
|
1403/12/18
|
0
|
0.0
|
0
|
0
|
0.0
|
كنترل موجودي,مهندسي توليد
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.3.6
|
مونتاژ يك روز خط - تزيينات كرمان موتور
|
0.0104167
|
0.0104167
|
2025/03/08
|
2025-03-08 08:30
|
2025/03/12
|
2025-03-12 14:30
|
71
|
1403/12/18
|
1403/12/22
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي توليد
|
0.7861635220125787
|
Edit
Details
Delete
|
|
2.3.7
|
ارزيابي يك روز خط
|
0.00833333
|
0.00833333
|
2025/03/12
|
2025-03-12 14:30
|
2025/03/17
|
2025-03-17 12:30
|
72
|
1403/12/22
|
1403/12/27
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي توليد,مهندسي كرمان موتور
|
0.628930817610063
|
Edit
Details
Delete
|
|
2.3.8
|
تاييديه يك روز خط
|
0.00416667
|
0.00416667
|
2025/03/17
|
2025-03-17 12:30
|
2025/03/19
|
2025-03-19 11:30
|
73
|
1403/12/27
|
1403/12/29
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي توليد,مهندسي كرمان موتور,مهندسي محصول
|
0.3144654088050315
|
Edit
Details
Delete
|
|
2.3.9
|
تكميل مدارك مطابق دستور العمل تكوين محصول
|
0.25
|
0.25
|
2024/05/02
|
2024-05-02 10:30
|
2024/12/29
|
2024-12-29 10:00
|
6
|
1403/2/13
|
1403/10/9
|
0
|
0.0
|
0
|
0
|
0.0
|
تضمين كيفيت,مهندسي محصول
|
18.867924528301888
|
Edit
Details
Delete
|
|
2.3.10
|
پايان فاز دوم
|
0
|
0
|
2025/03/19
|
2025-03-19 11:30
|
2025/03/19
|
2025-03-19 11:30
|
74,75
|
1403/12/29
|
1403/12/29
|
0
|
0.0
|
0
|
0
|
0.0
|
|
0.0
|
Edit
Details
Delete
|
|
1
|
امكان سنجي و توجيه اقتصادي پروژه
|
0
|
0
|
2025/05/01
|
May 1 2025 8:00AM
|
2025/05/01
|
May 1 2025 8:00AM
|
|
1404/2/11
|
1404/2/11
|
0
|
100
|
0
|
0
|
0
|
مسئول پروژه ( آقاي رضائي فرد)/كنترل پروژه[0%]
|
0
|
Edit
Details
Delete
|
|
2
|
شروع پروژه
|
0
|
0
|
2025/05/01
|
May 1 2025 8:00AM
|
2025/05/01
|
May 1 2025 8:00AM
|
1
|
1404/2/11
|
1404/2/11
|
0
|
100
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
3
|
فاز مهندسي
|
43
|
0
|
2025/05/01
|
May 1 2025 8:00AM
|
2025/06/29
|
Jun 29 2025 12:00PM
|
1
|
1404/2/11
|
1404/4/8
|
0
|
100
|
7.17
|
4.32
|
0
|
|
7.17
|
Edit
Details
Delete
|
|
3.1
|
دريافت اطلاعات فني از مشتري (نقشه، شناسنامه فني ، تست پلن و ...)
|
7
|
0
|
2025/05/01
|
May 1 2025 8:00AM
|
2025/05/10
|
May 10 2025 5:00PM
|
1SS
|
1404/2/11
|
1404/2/20
|
50
|
100
|
1.32
|
0.66
|
0
|
مهندسي پروژه ( آقاي ابراهيم )
|
1.32
|
Edit
Details
Delete
|
|
3.2
|
دريافت نمونه اگزوز وارداتي ( مجموعه كامل)
|
2
|
0
|
2025/06/03
|
Jun 3 2025 8:00AM
|
2025/06/04
|
Jun 4 2025 5:00PM
|
1SS
|
1404/3/13
|
1404/3/14
|
100
|
100
|
0.38
|
0.38
|
0
|
مهندسي پروژه ( آقاي يعقوبي)
|
0.38
|
Edit
Details
Delete
|
|
3.3
|
دريافت نمونه اگزوز وارداتي (منفصله )
|
7
|
0
|
2025/05/01
|
May 1 2025 8:00AM
|
2025/05/10
|
May 10 2025 5:00PM
|
1SS
|
1404/2/11
|
1404/2/20
|
100
|
100
|
1.32
|
1.32
|
0
|
مهندسي پروژه ( آقاي يعقوبي)
|
1.32
|
Edit
Details
Delete
|
|
3.4
|
spl /Bomتهيه اوليه
|
5
|
0
|
2025/06/07
|
Jun 7 2025 8:00AM
|
2025/06/11
|
Jun 11 2025 5:00PM
|
5,4
|
1404/3/17
|
1404/3/21
|
50
|
100
|
0.94
|
0.47
|
0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.94
|
Edit
Details
Delete
|
|
3.5
|
اسكن اگزوز دريافتي
|
14
|
0
|
2025/06/07
|
Jun 7 2025 8:00AM
|
2025/06/24
|
Jun 24 2025 5:00PM
|
5
|
1404/3/17
|
1404/4/3
|
50
|
100
|
2.64
|
1.32
|
0
|
بازرگاني ( آقاي مرادي)
|
2.64
|
Edit
Details
Delete
|
|
3.6
|
بررسي نمونه دريافتي با نقشه هاو اعلام مغايرت ها /bom
|
2
|
0
|
2025/06/25
|
Jun 25 2025 8:00AM
|
2025/06/28
|
Jun 28 2025 12:00PM
|
4,8
|
1404/4/4
|
1404/4/7
|
20
|
100
|
0.38
|
0.08
|
0
|
مسئول پروژه ( آقاي رضائي فرد)
|
0.38
|
Edit
Details
Delete
|
|
3.7
|
تهيه و ارسال نقشه هاي اگزوز به واحد بازرگاني
|
1
|
0
|
2025/06/28
|
Jun 28 2025 1:00PM
|
2025/06/29
|
Jun 29 2025 12:00PM
|
9
|
1404/4/7
|
1404/4/8
|
50
|
100
|
0.19
|
0.09
|
0
|
مهندسي پروژه ( آقاي يعقوبي)
|
0.19
|
Edit
Details
Delete
|
|
3.8
|
پايان فاز مهندسي
|
0
|
0
|
2025/06/29
|
Jun 29 2025 12:00PM
|
2025/06/29
|
Jun 29 2025 12:00PM
|
4,5,7,9,10
|
1404/4/8
|
1404/4/8
|
0
|
100
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
4
|
فاز تامين و قالب سازي
|
61
|
0
|
2025/06/07
|
Jun 7 2025 8:00AM
|
2025/08/25
|
Aug 25 2025 5:00PM
|
|
1404/3/17
|
1404/6/3
|
0
|
32
|
15.09
|
4.91
|
0
|
|
47.17
|
Edit
Details
Delete
|
|
4.1
|
نمونه مقدماتي اگزوزبا منبع ،لوله و هنگر
|
61
|
0
|
2025/06/07
|
Jun 7 2025 8:00AM
|
2025/08/25
|
Aug 25 2025 5:00PM
|
|
1404/3/17
|
1404/6/3
|
0
|
41
|
4.72
|
3.96
|
0
|
|
11.51
|
Edit
Details
Delete
|
|
4.1.1
|
انتخاب پيمانكار
|
5
|
0
|
2025/06/07
|
Jun 7 2025 8:00AM
|
2025/06/11
|
Jun 11 2025 5:00PM
|
5
|
1404/3/17
|
1404/3/21
|
100
|
100
|
0.94
|
0.94
|
0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.94
|
Edit
Details
Delete
|
|
4.1.2
|
مذاکره با پیمانکار جهت بررسي و ساخت اگزوز
|
16
|
0
|
2025/06/12
|
Jun 12 2025 8:00AM
|
2025/07/03
|
Jul 3 2025 5:00PM
|
14
|
1404/3/22
|
1404/4/12
|
100
|
100
|
3.02
|
3.02
|
0
|
بازرگاني ( آقايان صفائي / نظري )
|
3.02
|
Edit
Details
Delete
|
|
4.1.3
|
توليد 5 ست بعنوان نمونه اوليه
|
35
|
0
|
2025/07/06
|
Jul 6 2025 8:00AM
|
2025/08/19
|
Aug 19 2025 12:00PM
|
15
|
1404/4/15
|
1404/5/28
|
0
|
11
|
0.73
|
0
|
0
|
تامين كننده ( ايران اگزوز )
|
6.6
|
Edit
Details
Delete
|
|
4.1.4
|
ارسال نمونه هاي اوليه به كارخانه
|
5
|
0
|
2025/08/19
|
Aug 19 2025 1:00PM
|
2025/08/25
|
Aug 25 2025 5:00PM
|
16
|
1404/5/28
|
1404/6/3
|
0
|
0
|
0
|
0
|
0
|
تامين كننده ( ايران اگزوز )
|
0.94
|
Edit
Details
Delete
|
|
4.2
|
GPF
|
18
|
0
|
2025/06/29
|
Jun 29 2025 1:00PM
|
2025/07/22
|
Jul 22 2025 5:00PM
|
|
1404/4/8
|
1404/4/31
|
0
|
62
|
3.04
|
0
|
0
|
|
4.91
|
Edit
Details
Delete
|
|
4.2.1
|
X5 توليدقطعات مشابه كاتاباكس(عايق حرارت گير ، شيپوري و براكت )
|
15
|
0
|
2025/06/29
|
Jun 29 2025 1:00PM
|
2025/07/19
|
Jul 19 2025 5:00PM
|
10
|
1404/4/8
|
1404/4/28
|
0
|
53
|
1.5
|
0
|
0
|
تامين كننده كاراحديد نامي
|
2.83
|
Edit
Details
Delete
|
|
4.2.2
|
سفارشگذاري و توليد پوسته
|
1
|
0
|
2025/06/29
|
Jun 29 2025 1:00PM
|
2025/06/30
|
Jun 30 2025 12:00PM
|
10
|
1404/4/8
|
1404/4/9
|
0
|
100
|
0.19
|
0
|
0
|
آريا پاك مبدل
|
0.19
|
Edit
Details
Delete
|
|
4.2.3
|
تامين مهره و پيچ جوشي براكت
|
7
|
0
|
2025/06/29
|
Jun 29 2025 1:00PM
|
2025/07/08
|
Jul 8 2025 5:00PM
|
10
|
1404/4/8
|
1404/4/17
|
0
|
100
|
1.32
|
0
|
0
|
سازنده مشخص نشده
|
1.32
|
Edit
Details
Delete
|
|
4.2.4
|
ارسال قطعات توليدي به بم
|
3
|
0
|
2025/07/20
|
Jul 20 2025 8:00AM
|
2025/07/22
|
Jul 22 2025 5:00PM
|
19,21,20
|
1404/4/29
|
1404/4/31
|
0
|
0
|
0
|
0
|
0
|
تامين كننده كاراحديد نامي
|
0.57
|
Edit
Details
Delete
|
|
4.3
|
سر اگزوز
|
44
|
0
|
2025/06/29
|
Jun 29 2025 1:00PM
|
2025/08/25
|
Aug 25 2025 5:00PM
|
|
1404/4/8
|
1404/6/3
|
0
|
18
|
1.49
|
0
|
0
|
|
8.3
|
Edit
Details
Delete
|
|
4.3.1
|
انتخاب پيمانكار ساخت قالب
|
5
|
0
|
2025/06/29
|
Jun 29 2025 1:00PM
|
2025/07/06
|
Jul 6 2025 5:00PM
|
10,6
|
1404/4/8
|
1404/4/15
|
0
|
100
|
0.94
|
0
|
0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.94
|
Edit
Details
Delete
|
|
4.3.2
|
عقد قرارداد و پيش پرداخت
|
5
|
0
|
2025/07/07
|
Jul 7 2025 8:00AM
|
2025/07/13
|
Jul 13 2025 12:00PM
|
24
|
1404/4/16
|
1404/4/22
|
0
|
60
|
0.57
|
0
|
0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.94
|
Edit
Details
Delete
|
|
4.3.3
|
ساخت قالب ها
|
30
|
0
|
2025/07/13
|
Jul 13 2025 1:00PM
|
2025/08/20
|
Aug 20 2025 12:00PM
|
25
|
1404/4/22
|
1404/5/29
|
0
|
0
|
0
|
0
|
0
|
تامين كننده ( افرا كوشا فدك)
|
5.66
|
Edit
Details
Delete
|
|
4.3.4
|
توليد نمونه
|
2
|
0
|
2025/08/20
|
Aug 20 2025 1:00PM
|
2025/08/23
|
Aug 23 2025 5:00PM
|
26
|
1404/5/29
|
1404/6/1
|
0
|
0
|
0
|
0
|
0
|
تامين كننده ( افرا كوشا فدك)
|
0.38
|
Edit
Details
Delete
|
|
4.3.5
|
تائيديه قالب و نمونه
|
2
|
0
|
2025/08/24
|
Aug 24 2025 8:00AM
|
2025/08/25
|
Aug 25 2025 5:00PM
|
27
|
1404/6/2
|
1404/6/3
|
0
|
0
|
0
|
0
|
0
|
مسئول پروژه ( آقاي رضائي فرد)
|
0.38
|
Edit
Details
Delete
|
|
4.4
|
Pipe قالبسازي براكت
|
44
|
0
|
2025/06/29
|
Jun 29 2025 1:00PM
|
2025/08/25
|
Aug 25 2025 5:00PM
|
|
1404/4/8
|
1404/6/3
|
0
|
18
|
1.49
|
0
|
0
|
|
8.3
|
Edit
Details
Delete
|
|
4.4.1
|
انتخاب پيمانكار ساخت قالب
|
5
|
0
|
2025/06/29
|
Jun 29 2025 1:00PM
|
2025/07/06
|
Jul 6 2025 5:00PM
|
10,6
|
1404/4/8
|
1404/4/15
|
0
|
100
|
0.94
|
0
|
0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.94
|
Edit
Details
Delete
|
|
4.4.2
|
عقد قرارداد و پيش پرداخت
|
2
|
0
|
2025/07/07
|
Jul 7 2025 8:00AM
|
2025/07/08
|
Jul 8 2025 5:00PM
|
30
|
1404/4/16
|
1404/4/17
|
0
|
100
|
0.38
|
0
|
0
|
سازنده قالب نهائي نشده
|
0.38
|
Edit
Details
Delete
|
|
4.4.3
|
ساخت قالب ها
|
34
|
0
|
2025/07/09
|
Jul 9 2025 8:00AM
|
2025/08/21
|
Aug 21 2025 12:00PM
|
31
|
1404/4/18
|
1404/5/30
|
0
|
3
|
0.19
|
0
|
0
|
سازنده قالب نهائي نشده
|
6.42
|
Edit
Details
Delete
|
|
4.4.4
|
توليد نمونه
|
2
|
0
|
2025/08/23
|
Aug 23 2025 8:00AM
|
2025/08/24
|
Aug 24 2025 5:00PM
|
32
|
1404/6/1
|
1404/6/2
|
0
|
0
|
0
|
0
|
0
|
سازنده قالب نهائي نشده
|
0.38
|
Edit
Details
Delete
|
|
4.4.5
|
تائيديه قالب و نمونه
|
1
|
0
|
2025/08/25
|
Aug 25 2025 8:00AM
|
2025/08/25
|
Aug 25 2025 5:00PM
|
33
|
1404/6/3
|
1404/6/3
|
0
|
0
|
0
|
0
|
0
|
سازنده قالب نهائي نشده
|
0.19
|
Edit
Details
Delete
|
|
4.5
|
مهره سنسور فشار و دما ( مشترك X5-J7-SR6)
|
30
|
0
|
2025/06/29
|
Jun 29 2025 1:00PM
|
2025/08/06
|
Aug 6 2025 5:00PM
|
|
1404/4/8
|
1404/5/15
|
0
|
27
|
1.53
|
0
|
0
|
|
5.66
|
Edit
Details
Delete
|
|
4.5.1
|
انتخاب تراشكار
|
7
|
0
|
2025/06/29
|
Jun 29 2025 1:00PM
|
2025/07/08
|
Jul 8 2025 5:00PM
|
10
|
1404/4/8
|
1404/4/17
|
0
|
100
|
1.32
|
0
|
0
|
ماشين كار مشخص نشده است
|
1.32
|
Edit
Details
Delete
|
|
4.5.2
|
عقد قرارداد و پيش پرداخت
|
2
|
0
|
2025/07/09
|
Jul 9 2025 8:00AM
|
2025/07/12
|
Jul 12 2025 12:00PM
|
36
|
1404/4/18
|
1404/4/21
|
0
|
50
|
0.19
|
0
|
0
|
ماشين كار مشخص نشده است
|
0.38
|
Edit
Details
Delete
|
|
4.5.3
|
توليد نمونه
|
20
|
0
|
2025/07/12
|
Jul 12 2025 1:00PM
|
2025/08/05
|
Aug 5 2025 5:00PM
|
37
|
1404/4/21
|
1404/5/14
|
0
|
0
|
0
|
0
|
0
|
ماشين كار مشخص نشده است
|
3.77
|
Edit
Details
Delete
|
|
4.5.4
|
تائيديه نمونه
|
1
|
0
|
2025/08/06
|
Aug 6 2025 8:00AM
|
2025/08/06
|
Aug 6 2025 5:00PM
|
38
|
1404/5/15
|
1404/5/15
|
0
|
0
|
0
|
0
|
0
|
ماشين كار مشخص نشده است
|
0.19
|
Edit
Details
Delete
|
|
4.6
|
منجيد(مشابه )
|
10
|
0
|
2025/06/29
|
Jun 29 2025 1:00PM
|
2025/07/13
|
Jul 13 2025 12:00PM
|
|
1404/4/8
|
1404/4/22
|
0
|
80
|
1.51
|
0.94
|
0
|
|
1.89
|
Edit
Details
Delete
|
|
4.6.1
|
تامين منجيد دو سوراخ
|
10
|
0
|
2025/06/29
|
Jun 29 2025 1:00PM
|
2025/07/13
|
Jul 13 2025 12:00PM
|
10
|
1404/4/8
|
1404/4/22
|
50
|
80
|
1.51
|
0.94
|
0
|
آذين پليمر/ بازرگاني(آقاي صفائي)
|
1.89
|
Edit
Details
Delete
|
|
4.7
|
مت و منوليت
|
35
|
0
|
2025/06/29
|
Jun 29 2025 1:00PM
|
2025/08/13
|
Aug 13 2025 12:00PM
|
|
1404/4/8
|
1404/5/22
|
0
|
23
|
1.52
|
0
|
0
|
|
6.6
|
Edit
Details
Delete
|
|
4.7.1
|
سفارش گذاري براي پك ckd مت منوليت
|
35
|
0
|
2025/06/29
|
Jun 29 2025 1:00PM
|
2025/08/13
|
Aug 13 2025 12:00PM
|
10
|
1404/4/8
|
1404/5/22
|
0
|
23
|
1.52
|
0
|
0
|
بازرگاني خارجي ( آقاي محمودي)
|
6.6
|
Edit
Details
Delete
|
|
4.8
|
پايان تامين و قالب سازي
|
0
|
0
|
2025/08/25
|
Aug 25 2025 5:00PM
|
2025/08/25
|
Aug 25 2025 5:00PM
|
22,17,28,34,39,41,43
|
1404/6/3
|
1404/6/3
|
0
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
5
|
فاز نمونه اوليه وساخت فيكسچر
|
98
|
0
|
2025/08/26
|
Aug 26 2025 8:00AM
|
2025/12/31
|
Dec 31 2025 5:00PM
|
|
1404/6/4
|
1404/10/10
|
0
|
0
|
0
|
0
|
0
|
|
32.83
|
Edit
Details
Delete
|
|
5.1
|
توليد 5 عدد مجموعه اگزوز اوليه
|
2
|
0
|
2025/08/26
|
Aug 26 2025 8:00AM
|
2025/08/27
|
Aug 27 2025 5:00PM
|
17,44
|
1404/6/4
|
1404/6/5
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول ( آقاي غضنفري)
|
0.38
|
Edit
Details
Delete
|
|
5.2
|
تحويل به مهندسي محصول كرمان موتور جهت بررسي
|
3
|
0
|
2025/08/28
|
Aug 28 2025 8:00AM
|
2025/09/02
|
Sep 2 2025 12:00PM
|
46
|
1404/6/6
|
1404/6/11
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول ( آقاي غضنفري)/مهندسي محصول كرمان موتور ( آقاي تيرگر)
|
0.57
|
Edit
Details
Delete
|
|
5.3
|
ثبت كارتابل نمونه اوليه
|
2
|
0
|
2025/09/02
|
Sep 2 2025 1:00PM
|
2025/09/04
|
Sep 4 2025 12:00PM
|
47
|
1404/6/11
|
1404/6/13
|
0
|
0
|
0
|
0
|
0
|
كادك ( خانم معافي)
|
0.38
|
Edit
Details
Delete
|
|
5.4
|
اخذ تاييديه نمونه اوليه
|
10
|
0
|
2025/09/06
|
Sep 6 2025 8:00AM
|
2025/09/18
|
Sep 18 2025 12:00PM
|
|
1404/6/15
|
1404/6/27
|
0
|
0
|
0
|
0
|
0
|
|
1.89
|
Edit
Details
Delete
|
|
5.4.1
|
انجام تست هاي مونتاژ پذيري در بم
|
5
|
0
|
2025/09/06
|
Sep 6 2025 8:00AM
|
2025/09/13
|
Sep 13 2025 12:00PM
|
48
|
1404/6/15
|
1404/6/22
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول كرمان موتور
|
0.94
|
Edit
Details
Delete
|
|
5.4.2
|
ارسال گزارش
|
2
|
0
|
2025/09/13
|
Sep 13 2025 1:00PM
|
2025/09/15
|
Sep 15 2025 12:00PM
|
50
|
1404/6/22
|
1404/6/24
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول كرمان موتور
|
0.38
|
Edit
Details
Delete
|
|
5.4.3
|
اخذ تائيديه
|
3
|
0
|
2025/09/15
|
Sep 15 2025 1:00PM
|
2025/09/18
|
Sep 18 2025 12:00PM
|
51
|
1404/6/24
|
1404/6/27
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.57
|
Edit
Details
Delete
|
|
5.5
|
تهيه نهايي BOM
|
2
|
0
|
2025/09/20
|
Sep 20 2025 8:00AM
|
2025/09/21
|
Sep 21 2025 5:00PM
|
52
|
1404/6/29
|
1404/6/30
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول( خانم فرامرز پور)
|
0.38
|
Edit
Details
Delete
|
|
5.6
|
آدیت تضمین کیفیت
|
1
|
0
|
2025/09/22
|
Sep 22 2025 8:00AM
|
2025/09/22
|
Sep 22 2025 5:00PM
|
53,52
|
1404/6/31
|
1404/6/31
|
0
|
0
|
0
|
0
|
0
|
تضمين كيفيت ( آقاي جلال الديني)
|
0.19
|
Edit
Details
Delete
|
|
5.7
|
تست آلايندگي
|
50
|
0
|
2025/09/20
|
Sep 20 2025 8:00AM
|
2025/11/22
|
Nov 22 2025 12:00PM
|
|
1404/6/29
|
1404/9/1
|
0
|
0
|
0
|
0
|
0
|
|
9.43
|
Edit
Details
Delete
|
|
5.7.1
|
ارسال نمونه به تهران جهت ارسال به كرمان موتور براي انجام تست
|
3
|
0
|
2025/09/20
|
Sep 20 2025 8:00AM
|
2025/09/22
|
Sep 22 2025 5:00PM
|
52
|
1404/6/29
|
1404/6/31
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول كرمان موتور
|
0.57
|
Edit
Details
Delete
|
|
5.7.2
|
تست آلايندگي و تست توان سر چرخ نمونه مطالعاتی
|
45
|
0
|
2025/09/23
|
Sep 23 2025 8:00AM
|
2025/11/18
|
Nov 18 2025 5:00PM
|
56
|
1404/7/1
|
1404/8/27
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول كرمان موتور
|
8.49
|
Edit
Details
Delete
|
|
5.7.3
|
ارسال نتايج به آرمان موتور جهت ثبت در آرشيو فني
|
2
|
0
|
2025/11/19
|
Nov 19 2025 8:00AM
|
2025/11/22
|
Nov 22 2025 12:00PM
|
57
|
1404/8/28
|
1404/9/1
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.38
|
Edit
Details
Delete
|
|
5.8
|
فيكسچرهاي توليدي وكنترلي
|
81
|
0
|
2025/09/20
|
Sep 20 2025 8:00AM
|
2025/12/31
|
Dec 31 2025 5:00PM
|
|
1404/6/29
|
1404/10/10
|
0
|
0
|
0
|
0
|
0
|
|
19.62
|
Edit
Details
Delete
|
|
5.8.1
|
طراحي فيكسچر
|
29
|
0
|
2025/09/20
|
Sep 20 2025 8:00AM
|
2025/10/26
|
Oct 26 2025 12:00PM
|
|
1404/6/29
|
1404/8/4
|
0
|
0
|
0
|
0
|
0
|
|
5.47
|
Edit
Details
Delete
|
|
5.8.1.1
|
اسكن نمونه تائيد شده و مدلسازي
|
14
|
0
|
2025/09/20
|
Sep 20 2025 8:00AM
|
2025/10/06
|
Oct 6 2025 5:00PM
|
52
|
1404/6/29
|
1404/7/14
|
0
|
0
|
0
|
0
|
0
|
بازرگاني ( آقايان صفائي / نظري )
|
2.64
|
Edit
Details
Delete
|
|
5.8.1.2
|
طراحي فيكسچر توليدي و كنترلي
|
10
|
0
|
2025/10/07
|
Oct 7 2025 8:00AM
|
2025/10/19
|
Oct 19 2025 5:00PM
|
61
|
1404/7/15
|
1404/7/27
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي يوسفيان)
|
1.89
|
Edit
Details
Delete
|
|
5.8.1.3
|
اخذ تائيديه براي فيكسچرهاي كنترلي مجموعه نهايي از كادك
|
5
|
0
|
2025/10/20
|
Oct 20 2025 8:00AM
|
2025/10/26
|
Oct 26 2025 12:00PM
|
62
|
1404/7/28
|
1404/8/4
|
0
|
0
|
0
|
0
|
0
|
الزامات كادك ( آقاي صالحي)
|
0.94
|
Edit
Details
Delete
|
|
5.8.2
|
ساخت فيكسچرتوليدي
|
23
|
0
|
2025/10/26
|
Oct 26 2025 1:00PM
|
2025/11/25
|
Nov 25 2025 12:00PM
|
|
1404/8/4
|
1404/9/4
|
0
|
0
|
0
|
0
|
0
|
|
4.34
|
Edit
Details
Delete
|
|
5.8.2.1
|
ليزر برش قطعات فيكسچر توليدي
|
15
|
0
|
2025/10/26
|
Oct 26 2025 1:00PM
|
2025/11/13
|
Nov 13 2025 12:00PM
|
63
|
1404/8/4
|
1404/8/22
|
0
|
0
|
0
|
0
|
0
|
سازنده مشخص نشده
|
2.83
|
Edit
Details
Delete
|
|
5.8.2.2
|
ارسال فيكسچر به بم
|
3
|
0
|
2025/11/15
|
Nov 15 2025 8:00AM
|
2025/11/17
|
Nov 17 2025 5:00PM
|
65
|
1404/8/24
|
1404/8/26
|
0
|
0
|
0
|
0
|
0
|
بازرگاني ( آقاي مرادي),مهندسي پروژه ( آقاي يوسفيان)
|
0.57
|
Edit
Details
Delete
|
|
5.8.2.3
|
مونتاژ فيكسچر هاي توليدي در كارخانه
|
5
|
0
|
2025/11/18
|
Nov 18 2025 8:00AM
|
2025/11/25
|
Nov 25 2025 12:00PM
|
66
|
1404/8/27
|
1404/9/4
|
0
|
0
|
0
|
0
|
0
|
مهندسي ابزار(آقاي ترك پور)
|
0.94
|
Edit
Details
Delete
|
|
5.8.3
|
ساخت فيكسچركنترلي
|
50
|
0
|
2025/10/26
|
Oct 26 2025 1:00PM
|
2025/12/29
|
Dec 29 2025 5:00PM
|
|
1404/8/4
|
1404/10/8
|
0
|
0
|
0
|
0
|
0
|
|
9.43
|
Edit
Details
Delete
|
|
5.8.3.1
|
ساخت فيكسچرهاي كنترلي
|
45
|
0
|
2025/10/26
|
Oct 26 2025 1:00PM
|
2025/12/23
|
Dec 23 2025 12:00PM
|
62,63
|
1404/8/4
|
1404/10/2
|
0
|
0
|
0
|
0
|
0
|
سازنده مشخص نشده
|
8.49
|
Edit
Details
Delete
|
|
5.8.3.2
|
گزارش گيري ابعادي/ cmm
|
2
|
0
|
2025/12/23
|
Dec 23 2025 1:00PM
|
2025/12/25
|
Dec 25 2025 12:00PM
|
69
|
1404/10/2
|
1404/10/4
|
0
|
0
|
0
|
0
|
0
|
سازنده مشخص نشده
|
0.38
|
Edit
Details
Delete
|
|
5.8.3.3
|
ارسال فيكسچر به بم
|
3
|
0
|
2025/12/27
|
Dec 27 2025 8:00AM
|
2025/12/29
|
Dec 29 2025 5:00PM
|
70
|
1404/10/6
|
1404/10/8
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي يوسفيان),بازرگاني ( آقاي مرادي)
|
0.57
|
Edit
Details
Delete
|
|
5.8.4
|
صورتجلسه تائيد و تحويل فيكسچرها به واحد توليد
|
2
|
0
|
2025/12/30
|
Dec 30 2025 8:00AM
|
2025/12/31
|
Dec 31 2025 5:00PM
|
67,71
|
1404/10/9
|
1404/10/10
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي يوسفيان),مهندسي ابزار(آقاي ترك پور)
|
0.38
|
Edit
Details
Delete
|
|
5.9
|
پايان فاز
|
0
|
0
|
2025/12/31
|
Dec 31 2025 5:00PM
|
2025/12/31
|
Dec 31 2025 5:00PM
|
52,58,67,63,71,72
|
1404/10/10
|
1404/10/10
|
0
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
6
|
فاز يك روز خط
|
87
|
0
|
2025/09/20
|
Sep 20 2025 8:00AM
|
2026/01/08
|
Jan 8 2026 12:00PM
|
|
1404/6/29
|
1404/10/18
|
0
|
0
|
0
|
0
|
0
|
|
12.83
|
Edit
Details
Delete
|
|
6.1
|
سفارش گذاري 100 ست
|
5
|
0
|
2025/09/20
|
Sep 20 2025 8:00AM
|
2025/09/24
|
Sep 24 2025 5:00PM
|
49,52
|
1404/6/29
|
1404/7/2
|
0
|
0
|
0
|
0
|
0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.94
|
Edit
Details
Delete
|
|
6.2
|
توليد و ارسال قطعات يك روز خط به كارخانه
|
10
|
0
|
2025/09/25
|
Sep 25 2025 8:00AM
|
2025/10/07
|
Oct 7 2025 5:00PM
|
75
|
1404/7/3
|
1404/7/15
|
0
|
0
|
0
|
0
|
0
|
تامين كننده ( ايران اگزوز )
|
1.89
|
Edit
Details
Delete
|
|
6.3
|
آديت فرآيند واحد تضمين كيفيت
|
1
|
0
|
2025/10/08
|
Oct 8 2025 8:00AM
|
2025/10/08
|
Oct 8 2025 5:00PM
|
76
|
1404/7/16
|
1404/7/16
|
0
|
0
|
0
|
0
|
0
|
تضمين كيفيت ( آقاي جلال الديني)
|
0.19
|
Edit
Details
Delete
|
|
6.4
|
توليد يك روز خط اگزوز در آرمان موتور
|
4
|
0
|
2025/11/25
|
Nov 25 2025 1:00PM
|
2025/11/30
|
Nov 30 2025 5:00PM
|
77SS,76,67
|
1404/9/4
|
1404/9/9
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد /مهندسي پروژه
|
0.75
|
Edit
Details
Delete
|
|
6.5
|
ثبت كارتابل يك روز خط و ارسال قطعات به خط توليد كرمان موتور
|
3
|
0
|
2025/12/01
|
Dec 1 2025 8:00AM
|
2025/12/03
|
Dec 3 2025 5:00PM
|
78
|
1404/9/10
|
1404/9/12
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.57
|
Edit
Details
Delete
|
|
6.6
|
مونتاژ يك روز خط-بسته به برنامه توليد
|
3
|
0
|
2025/12/04
|
Dec 4 2025 8:00AM
|
2025/12/08
|
Dec 8 2025 12:00PM
|
79
|
1404/9/13
|
1404/9/17
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد /مهندسي پروژه
|
0.57
|
Edit
Details
Delete
|
|
6.7
|
ارزيابي يك روز خط
|
4
|
0
|
2026/01/01
|
Jan 1 2026 8:00AM
|
2026/01/06
|
Jan 6 2026 12:00PM
|
80,73
|
1404/10/11
|
1404/10/16
|
0
|
0
|
0
|
0
|
0
|
كادك ( آقاي عبدي)
|
0.75
|
Edit
Details
Delete
|
|
6.8
|
تاييديه يك روز خط
|
2
|
0
|
2026/01/06
|
Jan 6 2026 1:00PM
|
2026/01/08
|
Jan 8 2026 12:00PM
|
81
|
1404/10/16
|
1404/10/18
|
0
|
0
|
0
|
0
|
0
|
كادك ( آقاي عبدي)
|
0.38
|
Edit
Details
Delete
|
|
6.9
|
انجام تست هاي ذكر شده در تست پلن، تهيه تست ريپورت
|
36
|
0
|
2025/11/22
|
Nov 22 2025 1:00PM
|
2026/01/07
|
Jan 7 2026 12:00PM
|
|
1404/9/1
|
1404/10/17
|
0
|
0
|
0
|
0
|
0
|
|
6.79
|
Edit
Details
Delete
|
|
6.9.1
|
دريافت پيش فاكتور از آزمايشگاه
|
2
|
0
|
2025/11/22
|
Nov 22 2025 1:00PM
|
2025/11/25
|
Nov 25 2025 12:00PM
|
58
|
1404/9/1
|
1404/9/4
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.38
|
Edit
Details
Delete
|
|
6.9.2
|
پرداخت مبلغ انجام تست
|
2
|
0
|
2025/11/25
|
Nov 25 2025 1:00PM
|
2025/11/27
|
Nov 27 2025 12:00PM
|
84
|
1404/9/4
|
1404/9/6
|
0
|
0
|
0
|
0
|
0
|
خزانه ( آقاي محمودي)
|
0.38
|
Edit
Details
Delete
|
|
6.9.3
|
ارسال قطعات به ازمايشگاه
|
2
|
0
|
2025/11/29
|
Nov 29 2025 8:00AM
|
2025/11/30
|
Nov 30 2025 5:00PM
|
85
|
1404/9/8
|
1404/9/9
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.38
|
Edit
Details
Delete
|
|
6.9.4
|
انجام آزمون و تهيه تست ريپورت
|
30
|
0
|
2025/12/01
|
Dec 1 2025 8:00AM
|
2026/01/07
|
Jan 7 2026 12:00PM
|
86
|
1404/9/10
|
1404/10/17
|
0
|
0
|
0
|
0
|
0
|
آزمايشگاه مشخص نيست
|
5.66
|
Edit
Details
Delete
|
|
7
|
اتمام پروژه- سفارشگذاري جهت توليد انبوه
|
0
|
0
|
2026/01/08
|
Jan 8 2026 12:00PM
|
2026/01/08
|
Jan 8 2026 12:00PM
|
82,83
|
1404/10/18
|
1404/10/18
|
0
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
0
|
Exhaust-SR6
|
191.5d
|
0.0d
|
2025/05/01
|
5/1/2025 12:00:00 AM
|
2026/01/08
|
1/8/2026 12:00:00 AM
|
|
1404/2/11
|
1404/10/18
|
0
|
22
|
21.999999999999996
|
9.226415094339623
|
0
|
|
99.99999999999997
|
Edit
Details
Delete
|
|
1
|
امكان سنجي و توجيه اقتصادي پروژه
|
0.0d
|
0.0d
|
2025/05/01
|
5/1/2025 12:00:00 AM
|
2025/05/01
|
5/1/2025 12:00:00 AM
|
|
1404/2/11
|
1404/2/11
|
0
|
100
|
0
|
0
|
0
|
مسئول پروژه ( آقاي رضائي فرد)/كنترل پروژه
|
0
|
Edit
Details
Delete
|
|
2
|
شروع پروژه
|
0.0d
|
0.0d
|
2025/05/01
|
5/1/2025 12:00:00 AM
|
2025/05/01
|
5/1/2025 12:00:00 AM
|
1
|
1404/2/11
|
1404/2/11
|
0
|
100
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
3
|
فاز مهندسي
|
43.5d
|
0.0d
|
2025/05/01
|
5/1/2025 12:00:00 AM
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
1
|
1404/2/11
|
1404/4/8
|
0
|
100
|
7.169811320754718
|
4.320754716981132
|
0
|
|
7.169811320754718
|
Edit
Details
Delete
|
|
3.1
|
دريافت اطلاعات فني از مشتري (نقشه، شناسنامه فني ، تست پلن و ...)
|
7.0d
|
7.0d
|
2025/05/01
|
5/1/2025 12:00:00 AM
|
2025/05/10
|
5/10/2025 12:00:00 AM
|
1
|
1404/2/11
|
1404/2/20
|
50
|
100
|
1.3207547169811322
|
0.6603773584905661
|
0
|
مهندسي پروژه ( آقاي ابراهيم )
|
1.3207547169811322
|
Edit
Details
Delete
|
|
3.2
|
دريافت نمونه اگزوز وارداتي ( مجموعه كامل)
|
2.0d
|
2.0d
|
2025/06/03
|
6/3/2025 12:00:00 AM
|
2025/06/04
|
6/4/2025 12:00:00 AM
|
1
|
1404/3/13
|
1404/3/14
|
100
|
100
|
0.37735849056603776
|
0.37735849056603776
|
0
|
مهندسي پروژه ( آقاي يعقوبي)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
3.3
|
دريافت نمونه اگزوز وارداتي (منفصله )
|
7.0d
|
7.0d
|
2025/05/01
|
5/1/2025 12:00:00 AM
|
2025/05/10
|
5/10/2025 12:00:00 AM
|
1
|
1404/2/11
|
1404/2/20
|
100
|
100
|
1.3207547169811322
|
1.3207547169811322
|
0
|
مهندسي پروژه ( آقاي يعقوبي)
|
1.3207547169811322
|
Edit
Details
Delete
|
|
3.4
|
spl /Bomتهيه اوليه
|
5.0d
|
5.0d
|
2025/06/07
|
6/7/2025 12:00:00 AM
|
2025/06/11
|
6/11/2025 12:00:00 AM
|
5,4
|
1404/3/17
|
1404/3/21
|
50
|
100
|
0.9433962264150944
|
0.4716981132075472
|
0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.9433962264150944
|
Edit
Details
Delete
|
|
3.5
|
اسكن اگزوز دريافتي
|
14.0d
|
14.0d
|
2025/06/07
|
6/7/2025 12:00:00 AM
|
2025/06/24
|
6/24/2025 12:00:00 AM
|
5
|
1404/3/17
|
1404/4/3
|
50
|
100
|
2.6415094339622645
|
1.3207547169811322
|
0
|
بازرگاني ( آقاي مرادي)
|
2.6415094339622645
|
Edit
Details
Delete
|
|
3.6
|
بررسي نمونه دريافتي با نقشه هاو اعلام مغايرت ها /bom
|
2.0d
|
2.0d
|
2025/06/25
|
6/25/2025 12:00:00 AM
|
2025/06/28
|
6/28/2025 12:00:00 AM
|
4,8
|
1404/4/4
|
1404/4/7
|
20
|
100
|
0.37735849056603776
|
0.07547169811320754
|
0
|
مسئول پروژه ( آقاي رضائي فرد)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
3.7
|
تهيه و ارسال نقشه هاي اگزوز به واحد بازرگاني
|
1.0d
|
1.0d
|
2025/06/28
|
6/28/2025 12:00:00 AM
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
9
|
1404/4/7
|
1404/4/8
|
50
|
100
|
0.18867924528301888
|
0.09433962264150944
|
0
|
مهندسي پروژه ( آقاي يعقوبي)
|
0.18867924528301888
|
Edit
Details
Delete
|
|
3.8
|
پايان فاز مهندسي
|
0.0d
|
0.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
4,5,7,9,10
|
1404/4/8
|
1404/4/8
|
0
|
100
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
4
|
فاز تامين و قالب سازي
|
61.0d
|
0.0d
|
2025/06/07
|
6/7/2025 12:00:00 AM
|
2025/08/25
|
8/25/2025 12:00:00 AM
|
|
1404/3/17
|
1404/6/3
|
0
|
32
|
15.094339622641511
|
4.905660377358491
|
0
|
|
47.169811320754725
|
Edit
Details
Delete
|
|
4.1
|
نمونه مقدماتي اگزوزبا منبع ،لوله و هنگر
|
61.0d
|
0.0d
|
2025/06/07
|
6/7/2025 12:00:00 AM
|
2025/08/25
|
8/25/2025 12:00:00 AM
|
|
1404/3/17
|
1404/6/3
|
0
|
41
|
4.718867924528302
|
3.9622641509433967
|
0
|
|
11.509433962264152
|
Edit
Details
Delete
|
|
4.1.1
|
انتخاب پيمانكار
|
5.0d
|
5.0d
|
2025/06/07
|
6/7/2025 12:00:00 AM
|
2025/06/11
|
6/11/2025 12:00:00 AM
|
5
|
1404/3/17
|
1404/3/21
|
100
|
100
|
0.9433962264150944
|
0.9433962264150944
|
0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.9433962264150944
|
Edit
Details
Delete
|
|
4.1.2
|
مذاکره با پیمانکار جهت بررسي و ساخت اگزوز
|
16.0d
|
16.0d
|
2025/06/12
|
6/12/2025 12:00:00 AM
|
2025/07/03
|
7/3/2025 12:00:00 AM
|
14
|
1404/3/22
|
1404/4/12
|
100
|
100
|
3.018867924528302
|
3.018867924528302
|
0
|
بازرگاني ( آقايان صفائي / نظري )
|
3.018867924528302
|
Edit
Details
Delete
|
|
4.1.3
|
توليد 5 ست بعنوان نمونه اوليه
|
35.0d
|
35.0d
|
2025/07/06
|
7/6/2025 12:00:00 AM
|
2025/08/19
|
8/19/2025 12:00:00 AM
|
15
|
1404/4/15
|
1404/5/28
|
0
|
11
|
0.7264150943396226
|
0
|
0
|
تامين كننده ( ايران اگزوز )
|
6.60377358490566
|
Edit
Details
Delete
|
|
4.1.4
|
ارسال نمونه هاي اوليه به كارخانه
|
5.0d
|
5.0d
|
2025/08/19
|
8/19/2025 12:00:00 AM
|
2025/08/25
|
8/25/2025 12:00:00 AM
|
16
|
1404/5/28
|
1404/6/3
|
0
|
0
|
0
|
0
|
0
|
تامين كننده ( ايران اگزوز )
|
0.9433962264150944
|
Edit
Details
Delete
|
|
4.2
|
GPF
|
18.0d
|
0.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/07/22
|
7/22/2025 12:00:00 AM
|
|
1404/4/8
|
1404/4/31
|
0
|
62
|
3.041509433962264
|
0
|
0
|
|
4.90566037735849
|
Edit
Details
Delete
|
|
4.2.1
|
X5 توليدقطعات مشابه كاتاباكس(عايق حرارت گير ، شيپوري و براكت )
|
15.0d
|
15.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/07/19
|
7/19/2025 12:00:00 AM
|
10
|
1404/4/8
|
1404/4/28
|
0
|
53
|
1.5
|
0
|
0
|
تامين كننده كاراحديد نامي
|
2.8301886792452833
|
Edit
Details
Delete
|
|
4.2.2
|
سفارشگذاري و توليد پوسته
|
1.0d
|
1.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/06/30
|
6/30/2025 12:00:00 AM
|
10
|
1404/4/8
|
1404/4/9
|
0
|
100
|
0.18867924528301888
|
0
|
0
|
آريا پاك مبدل
|
0.18867924528301888
|
Edit
Details
Delete
|
|
4.2.3
|
تامين مهره و پيچ جوشي براكت
|
7.0d
|
7.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/07/08
|
7/8/2025 12:00:00 AM
|
10
|
1404/4/8
|
1404/4/17
|
0
|
100
|
1.3207547169811322
|
0
|
0
|
سازنده مشخص نشده
|
1.3207547169811322
|
Edit
Details
Delete
|
|
4.2.4
|
ارسال قطعات توليدي به بم
|
3.0d
|
3.0d
|
2025/07/20
|
7/20/2025 12:00:00 AM
|
2025/07/22
|
7/22/2025 12:00:00 AM
|
19,21,20
|
1404/4/29
|
1404/4/31
|
0
|
0
|
0
|
0
|
0
|
تامين كننده كاراحديد نامي
|
0.5660377358490566
|
Edit
Details
Delete
|
|
4.3
|
سر اگزوز
|
44.0d
|
0.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/08/25
|
8/25/2025 12:00:00 AM
|
|
1404/4/8
|
1404/6/3
|
0
|
18
|
1.4943396226415095
|
0
|
0
|
|
8.30188679245283
|
Edit
Details
Delete
|
|
4.3.1
|
انتخاب پيمانكار ساخت قالب
|
5.0d
|
5.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/07/06
|
7/6/2025 12:00:00 AM
|
10,6
|
1404/4/8
|
1404/4/15
|
0
|
100
|
0.9433962264150944
|
0
|
0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.9433962264150944
|
Edit
Details
Delete
|
|
4.3.2
|
عقد قرارداد و پيش پرداخت
|
5.0d
|
5.0d
|
2025/07/07
|
7/7/2025 12:00:00 AM
|
2025/07/13
|
7/13/2025 12:00:00 AM
|
24
|
1404/4/16
|
1404/4/22
|
0
|
60
|
0.5660377358490566
|
0
|
0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.9433962264150944
|
Edit
Details
Delete
|
|
4.3.3
|
ساخت قالب ها
|
30.0d
|
30.0d
|
2025/07/13
|
7/13/2025 12:00:00 AM
|
2025/08/20
|
8/20/2025 12:00:00 AM
|
25
|
1404/4/22
|
1404/5/29
|
0
|
0
|
0
|
0
|
0
|
تامين كننده ( افرا كوشا فدك)
|
5.660377358490567
|
Edit
Details
Delete
|
|
4.3.4
|
توليد نمونه
|
2.0d
|
2.0d
|
2025/08/20
|
8/20/2025 12:00:00 AM
|
2025/08/23
|
8/23/2025 12:00:00 AM
|
26
|
1404/5/29
|
1404/6/1
|
0
|
0
|
0
|
0
|
0
|
تامين كننده ( افرا كوشا فدك)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
4.3.5
|
تائيديه قالب و نمونه
|
2.0d
|
2.0d
|
2025/08/24
|
8/24/2025 12:00:00 AM
|
2025/08/25
|
8/25/2025 12:00:00 AM
|
27
|
1404/6/2
|
1404/6/3
|
0
|
0
|
0
|
0
|
0
|
مسئول پروژه ( آقاي رضائي فرد)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
4.4
|
Pipe قالبسازي براكت
|
44.0d
|
0.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/08/25
|
8/25/2025 12:00:00 AM
|
|
1404/4/8
|
1404/6/3
|
0
|
18
|
1.4943396226415095
|
0
|
0
|
|
8.30188679245283
|
Edit
Details
Delete
|
|
4.4.1
|
انتخاب پيمانكار ساخت قالب
|
5.0d
|
5.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/07/06
|
7/6/2025 12:00:00 AM
|
10,6
|
1404/4/8
|
1404/4/15
|
0
|
100
|
0.9433962264150944
|
0
|
0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.9433962264150944
|
Edit
Details
Delete
|
|
4.4.2
|
عقد قرارداد و پيش پرداخت
|
2.0d
|
2.0d
|
2025/07/07
|
7/7/2025 12:00:00 AM
|
2025/07/08
|
7/8/2025 12:00:00 AM
|
30
|
1404/4/16
|
1404/4/17
|
0
|
100
|
0.37735849056603776
|
0
|
0
|
سازنده قالب نهائي نشده
|
0.37735849056603776
|
Edit
Details
Delete
|
|
4.4.3
|
ساخت قالب ها
|
34.0d
|
34.0d
|
2025/07/09
|
7/9/2025 12:00:00 AM
|
2025/08/21
|
8/21/2025 12:00:00 AM
|
31
|
1404/4/18
|
1404/5/30
|
0
|
3
|
0.19245283018867926
|
0
|
0
|
سازنده قالب نهائي نشده
|
6.415094339622642
|
Edit
Details
Delete
|
|
4.4.4
|
توليد نمونه
|
2.0d
|
2.0d
|
2025/08/23
|
8/23/2025 12:00:00 AM
|
2025/08/24
|
8/24/2025 12:00:00 AM
|
32
|
1404/6/1
|
1404/6/2
|
0
|
0
|
0
|
0
|
0
|
سازنده قالب نهائي نشده
|
0.37735849056603776
|
Edit
Details
Delete
|
|
4.4.5
|
تائيديه قالب و نمونه
|
1.0d
|
1.0d
|
2025/08/25
|
8/25/2025 12:00:00 AM
|
2025/08/25
|
8/25/2025 12:00:00 AM
|
33
|
1404/6/3
|
1404/6/3
|
0
|
0
|
0
|
0
|
0
|
سازنده قالب نهائي نشده
|
0.18867924528301888
|
Edit
Details
Delete
|
|
4.5
|
مهره سنسور فشار و دما ( مشترك X5-J7-SR6)
|
30.0d
|
0.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/08/06
|
8/6/2025 12:00:00 AM
|
|
1404/4/8
|
1404/5/15
|
0
|
27
|
1.5283018867924532
|
0
|
0
|
|
5.660377358490567
|
Edit
Details
Delete
|
|
4.5.1
|
انتخاب تراشكار
|
7.0d
|
7.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/07/08
|
7/8/2025 12:00:00 AM
|
10
|
1404/4/8
|
1404/4/17
|
0
|
100
|
1.3207547169811322
|
0
|
0
|
ماشين كار مشخص نشده است
|
1.3207547169811322
|
Edit
Details
Delete
|
|
4.5.2
|
عقد قرارداد و پيش پرداخت
|
2.0d
|
2.0d
|
2025/07/09
|
7/9/2025 12:00:00 AM
|
2025/07/12
|
7/12/2025 12:00:00 AM
|
36
|
1404/4/18
|
1404/4/21
|
0
|
50
|
0.18867924528301888
|
0
|
0
|
ماشين كار مشخص نشده است
|
0.37735849056603776
|
Edit
Details
Delete
|
|
4.5.3
|
توليد نمونه
|
20.0d
|
20.0d
|
2025/07/12
|
7/12/2025 12:00:00 AM
|
2025/08/05
|
8/5/2025 12:00:00 AM
|
37
|
1404/4/21
|
1404/5/14
|
0
|
0
|
0
|
0
|
0
|
ماشين كار مشخص نشده است
|
3.7735849056603774
|
Edit
Details
Delete
|
|
4.5.4
|
تائيديه نمونه
|
1.0d
|
1.0d
|
2025/08/06
|
8/6/2025 12:00:00 AM
|
2025/08/06
|
8/6/2025 12:00:00 AM
|
38
|
1404/5/15
|
1404/5/15
|
0
|
0
|
0
|
0
|
0
|
ماشين كار مشخص نشده است
|
0.18867924528301888
|
Edit
Details
Delete
|
|
4.6
|
منجيد(مشابه )
|
10.0d
|
0.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/07/13
|
7/13/2025 12:00:00 AM
|
|
1404/4/8
|
1404/4/22
|
0
|
80
|
1.509433962264151
|
0.9433962264150944
|
0
|
|
1.8867924528301887
|
Edit
Details
Delete
|
|
4.6.1
|
تامين منجيد دو سوراخ
|
10.0d
|
10.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/07/13
|
7/13/2025 12:00:00 AM
|
10
|
1404/4/8
|
1404/4/22
|
50
|
80
|
1.509433962264151
|
0.9433962264150944
|
0
|
آذين پليمر/ بازرگاني(آقاي صفائي)
|
1.8867924528301887
|
Edit
Details
Delete
|
|
4.7
|
مت و منوليت
|
35.0d
|
0.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/08/13
|
8/13/2025 12:00:00 AM
|
|
1404/4/8
|
1404/5/22
|
0
|
23
|
1.5188679245283019
|
0
|
0
|
|
6.60377358490566
|
Edit
Details
Delete
|
|
4.7.1
|
سفارش گذاري براي پك ckd مت منوليت
|
35.0d
|
35.0d
|
2025/06/29
|
6/29/2025 12:00:00 AM
|
2025/08/13
|
8/13/2025 12:00:00 AM
|
10
|
1404/4/8
|
1404/5/22
|
0
|
23
|
1.5188679245283019
|
0
|
0
|
بازرگاني خارجي ( آقاي محمودي)
|
6.60377358490566
|
Edit
Details
Delete
|
|
4.8
|
پايان تامين و قالب سازي
|
0.0d
|
0.0d
|
2025/08/25
|
8/25/2025 12:00:00 AM
|
2025/08/25
|
8/25/2025 12:00:00 AM
|
22,17,28,34,39,41,43
|
1404/6/3
|
1404/6/3
|
0
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
5
|
فاز نمونه اوليه وساخت فيكسچر
|
98.0d
|
0.0d
|
2025/08/26
|
8/26/2025 12:00:00 AM
|
2025/12/31
|
12/31/2025 12:00:00 AM
|
|
1404/6/4
|
1404/10/10
|
0
|
0
|
0
|
0
|
0
|
|
32.83018867924529
|
Edit
Details
Delete
|
|
5.1
|
توليد 5 عدد مجموعه اگزوز اوليه
|
2.0d
|
2.0d
|
2025/08/26
|
8/26/2025 12:00:00 AM
|
2025/08/27
|
8/27/2025 12:00:00 AM
|
17,44
|
1404/6/4
|
1404/6/5
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول ( آقاي غضنفري)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
5.2
|
تحويل به مهندسي محصول كرمان موتور جهت بررسي
|
3.0d
|
3.0d
|
2025/08/28
|
8/28/2025 12:00:00 AM
|
2025/09/02
|
9/2/2025 12:00:00 AM
|
46
|
1404/6/6
|
1404/6/11
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول ( آقاي غضنفري)/مهندسي محصول كرمان موتور ( آقاي تيرگر)
|
0.5660377358490566
|
Edit
Details
Delete
|
|
5.3
|
ثبت كارتابل نمونه اوليه
|
2.0d
|
2.0d
|
2025/09/02
|
9/2/2025 12:00:00 AM
|
2025/09/04
|
9/4/2025 12:00:00 AM
|
47
|
1404/6/11
|
1404/6/13
|
0
|
0
|
0
|
0
|
0
|
كادك ( خانم معافي)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
5.4
|
اخذ تاييديه نمونه اوليه
|
10.0d
|
0.0d
|
2025/09/06
|
9/6/2025 12:00:00 AM
|
2025/09/18
|
9/18/2025 12:00:00 AM
|
|
1404/6/15
|
1404/6/27
|
0
|
0
|
0
|
0
|
0
|
|
1.8867924528301887
|
Edit
Details
Delete
|
|
5.4.1
|
انجام تست هاي مونتاژ پذيري در بم
|
5.0d
|
5.0d
|
2025/09/06
|
9/6/2025 12:00:00 AM
|
2025/09/13
|
9/13/2025 12:00:00 AM
|
48
|
1404/6/15
|
1404/6/22
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول كرمان موتور
|
0.9433962264150944
|
Edit
Details
Delete
|
|
5.4.2
|
ارسال گزارش
|
2.0d
|
2.0d
|
2025/09/13
|
9/13/2025 12:00:00 AM
|
2025/09/15
|
9/15/2025 12:00:00 AM
|
50
|
1404/6/22
|
1404/6/24
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول كرمان موتور
|
0.37735849056603776
|
Edit
Details
Delete
|
|
5.4.3
|
اخذ تائيديه
|
3.0d
|
3.0d
|
2025/09/15
|
9/15/2025 12:00:00 AM
|
2025/09/18
|
9/18/2025 12:00:00 AM
|
51
|
1404/6/24
|
1404/6/27
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.5660377358490566
|
Edit
Details
Delete
|
|
5.5
|
تهيه نهايي BOM
|
2.0d
|
2.0d
|
2025/09/20
|
9/20/2025 12:00:00 AM
|
2025/09/21
|
9/21/2025 12:00:00 AM
|
52
|
1404/6/29
|
1404/6/30
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول( خانم فرامرز پور)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
5.6
|
آدیت تضمین کیفیت
|
1.0d
|
1.0d
|
2025/09/22
|
9/22/2025 12:00:00 AM
|
2025/09/22
|
9/22/2025 12:00:00 AM
|
53,52
|
1404/6/31
|
1404/6/31
|
0
|
0
|
0
|
0
|
0
|
تضمين كيفيت ( آقاي جلال الديني)
|
0.18867924528301888
|
Edit
Details
Delete
|
|
5.7
|
تست آلايندگي
|
50.0d
|
0.0d
|
2025/09/20
|
9/20/2025 12:00:00 AM
|
2025/11/22
|
11/22/2025 12:00:00 AM
|
|
1404/6/29
|
1404/9/1
|
0
|
0
|
0
|
0
|
0
|
|
9.433962264150944
|
Edit
Details
Delete
|
|
5.7.1
|
ارسال نمونه به تهران جهت ارسال به كرمان موتور براي انجام تست
|
3.0d
|
3.0d
|
2025/09/20
|
9/20/2025 12:00:00 AM
|
2025/09/22
|
9/22/2025 12:00:00 AM
|
52
|
1404/6/29
|
1404/6/31
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول كرمان موتور
|
0.5660377358490566
|
Edit
Details
Delete
|
|
5.7.2
|
تست آلايندگي و تست توان سر چرخ نمونه مطالعاتی
|
45.0d
|
45.0d
|
2025/09/23
|
9/23/2025 12:00:00 AM
|
2025/11/18
|
11/18/2025 12:00:00 AM
|
56
|
1404/7/1
|
1404/8/27
|
0
|
0
|
0
|
0
|
0
|
مهندسي محصول كرمان موتور
|
8.49056603773585
|
Edit
Details
Delete
|
|
5.7.3
|
ارسال نتايج به آرمان موتور جهت ثبت در آرشيو فني
|
2.0d
|
2.0d
|
2025/11/19
|
11/19/2025 12:00:00 AM
|
2025/11/22
|
11/22/2025 12:00:00 AM
|
57
|
1404/8/28
|
1404/9/1
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.37735849056603776
|
Edit
Details
Delete
|
|
5.8
|
فيكسچرهاي توليدي وكنترلي
|
81.0d
|
0.0d
|
2025/09/20
|
9/20/2025 12:00:00 AM
|
2025/12/31
|
12/31/2025 12:00:00 AM
|
|
1404/6/29
|
1404/10/10
|
0
|
0
|
0
|
0
|
0
|
|
19.62264150943396
|
Edit
Details
Delete
|
|
5.8.1
|
طراحي فيكسچر
|
29.0d
|
0.0d
|
2025/09/20
|
9/20/2025 12:00:00 AM
|
2025/10/26
|
10/26/2025 12:00:00 AM
|
|
1404/6/29
|
1404/8/4
|
0
|
0
|
0
|
0
|
0
|
|
5.471698113207547
|
Edit
Details
Delete
|
|
5.8.1.1
|
اسكن نمونه تائيد شده و مدلسازي
|
14.0d
|
14.0d
|
2025/09/20
|
9/20/2025 12:00:00 AM
|
2025/10/06
|
10/6/2025 12:00:00 AM
|
52
|
1404/6/29
|
1404/7/14
|
0
|
0
|
0
|
0
|
0
|
بازرگاني ( آقايان صفائي / نظري )
|
2.6415094339622645
|
Edit
Details
Delete
|
|
5.8.1.2
|
طراحي فيكسچر توليدي و كنترلي
|
10.0d
|
10.0d
|
2025/10/07
|
10/7/2025 12:00:00 AM
|
2025/10/19
|
10/19/2025 12:00:00 AM
|
61
|
1404/7/15
|
1404/7/27
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي يوسفيان)
|
1.8867924528301887
|
Edit
Details
Delete
|
|
5.8.1.3
|
اخذ تائيديه براي فيكسچرهاي كنترلي مجموعه نهايي از كادك
|
5.0d
|
5.0d
|
2025/10/20
|
10/20/2025 12:00:00 AM
|
2025/10/26
|
10/26/2025 12:00:00 AM
|
62
|
1404/7/28
|
1404/8/4
|
0
|
0
|
0
|
0
|
0
|
الزامات كادك ( آقاي صالحي)
|
0.9433962264150944
|
Edit
Details
Delete
|
|
5.8.2
|
ساخت فيكسچرتوليدي
|
23.0d
|
0.0d
|
2025/10/26
|
10/26/2025 12:00:00 AM
|
2025/11/25
|
11/25/2025 12:00:00 AM
|
|
1404/8/4
|
1404/9/4
|
0
|
0
|
0
|
0
|
0
|
|
4.339622641509434
|
Edit
Details
Delete
|
|
5.8.2.1
|
ليزر برش قطعات فيكسچر توليدي
|
15.0d
|
0.0d
|
2025/10/26
|
10/26/2025 12:00:00 AM
|
2025/11/13
|
11/13/2025 12:00:00 AM
|
63
|
1404/8/4
|
1404/8/22
|
0
|
0
|
0
|
0
|
0
|
سازنده مشخص نشده
|
2.8301886792452833
|
Edit
Details
Delete
|
|
5.8.2.2
|
ارسال فيكسچر به بم
|
3.0d
|
3.0d
|
2025/11/15
|
11/15/2025 12:00:00 AM
|
2025/11/17
|
11/17/2025 12:00:00 AM
|
65
|
1404/8/24
|
1404/8/26
|
0
|
0
|
0
|
0
|
0
|
بازرگاني ( آقاي مرادي),مهندسي پروژه ( آقاي يوسفيان)
|
0.5660377358490566
|
Edit
Details
Delete
|
|
5.8.2.3
|
مونتاژ فيكسچر هاي توليدي در كارخانه
|
5.0d
|
5.0d
|
2025/11/18
|
11/18/2025 12:00:00 AM
|
2025/11/25
|
11/25/2025 12:00:00 AM
|
66
|
1404/8/27
|
1404/9/4
|
0
|
0
|
0
|
0
|
0
|
مهندسي ابزار(آقاي ترك پور)
|
0.9433962264150944
|
Edit
Details
Delete
|
|
5.8.3
|
ساخت فيكسچركنترلي
|
50.0d
|
0.0d
|
2025/10/26
|
10/26/2025 12:00:00 AM
|
2025/12/29
|
12/29/2025 12:00:00 AM
|
|
1404/8/4
|
1404/10/8
|
0
|
0
|
0
|
0
|
0
|
|
9.433962264150944
|
Edit
Details
Delete
|
|
5.8.3.1
|
ساخت فيكسچرهاي كنترلي
|
45.0d
|
45.0d
|
2025/10/26
|
10/26/2025 12:00:00 AM
|
2025/12/23
|
12/23/2025 12:00:00 AM
|
62,63
|
1404/8/4
|
1404/10/2
|
0
|
0
|
0
|
0
|
0
|
سازنده مشخص نشده
|
8.49056603773585
|
Edit
Details
Delete
|
|
5.8.3.2
|
گزارش گيري ابعادي/ cmm
|
2.0d
|
2.0d
|
2025/12/23
|
12/23/2025 12:00:00 AM
|
2025/12/25
|
12/25/2025 12:00:00 AM
|
69
|
1404/10/2
|
1404/10/4
|
0
|
0
|
0
|
0
|
0
|
سازنده مشخص نشده
|
0.37735849056603776
|
Edit
Details
Delete
|
|
5.8.3.3
|
ارسال فيكسچر به بم
|
3.0d
|
3.0d
|
2025/12/27
|
12/27/2025 12:00:00 AM
|
2025/12/29
|
12/29/2025 12:00:00 AM
|
70
|
1404/10/6
|
1404/10/8
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي يوسفيان),بازرگاني ( آقاي مرادي)
|
0.5660377358490566
|
Edit
Details
Delete
|
|
5.8.4
|
صورتجلسه تائيد و تحويل فيكسچرها به واحد توليد
|
2.0d
|
2.0d
|
2025/12/30
|
12/30/2025 12:00:00 AM
|
2025/12/31
|
12/31/2025 12:00:00 AM
|
67,71
|
1404/10/9
|
1404/10/10
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي يوسفيان),مهندسي ابزار(آقاي ترك پور)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
5.9
|
پايان فاز
|
0.0d
|
0.0d
|
2025/12/31
|
12/31/2025 12:00:00 AM
|
2025/12/31
|
12/31/2025 12:00:00 AM
|
52,58,67,63,71,72
|
1404/10/10
|
1404/10/10
|
0
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
6
|
فاز يك روز خط
|
87.0d
|
0.0d
|
2025/09/20
|
9/20/2025 12:00:00 AM
|
2026/01/08
|
1/8/2026 12:00:00 AM
|
|
1404/6/29
|
1404/10/18
|
0
|
0
|
0
|
0
|
0
|
|
12.830188679245284
|
Edit
Details
Delete
|
|
6.1
|
سفارش گذاري 100 ست
|
5.0d
|
5.0d
|
2025/09/20
|
9/20/2025 12:00:00 AM
|
2025/09/24
|
9/24/2025 12:00:00 AM
|
49,52
|
1404/6/29
|
1404/7/2
|
0
|
0
|
0
|
0
|
0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.9433962264150944
|
Edit
Details
Delete
|
|
6.2
|
توليد و ارسال قطعات يك روز خط به كارخانه
|
10.0d
|
10.0d
|
2025/09/25
|
9/25/2025 12:00:00 AM
|
2025/10/07
|
10/7/2025 12:00:00 AM
|
75
|
1404/7/3
|
1404/7/15
|
0
|
0
|
0
|
0
|
0
|
تامين كننده ( ايران اگزوز )
|
1.8867924528301887
|
Edit
Details
Delete
|
|
6.3
|
آديت فرآيند واحد تضمين كيفيت
|
1.0d
|
1.0d
|
2025/10/08
|
10/8/2025 12:00:00 AM
|
2025/10/08
|
10/8/2025 12:00:00 AM
|
76
|
1404/7/16
|
1404/7/16
|
0
|
0
|
0
|
0
|
0
|
تضمين كيفيت ( آقاي جلال الديني)
|
0.18867924528301888
|
Edit
Details
Delete
|
|
6.4
|
توليد يك روز خط اگزوز در آرمان موتور
|
4.0d
|
4.0d
|
2025/11/25
|
11/25/2025 12:00:00 AM
|
2025/11/30
|
11/30/2025 12:00:00 AM
|
77,76,67
|
1404/9/4
|
1404/9/9
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد /مهندسي پروژه
|
0.7547169811320755
|
Edit
Details
Delete
|
|
6.5
|
ثبت كارتابل يك روز خط و ارسال قطعات به خط توليد كرمان موتور
|
3.0d
|
3.0d
|
2025/12/01
|
12/1/2025 12:00:00 AM
|
2025/12/03
|
12/3/2025 12:00:00 AM
|
78
|
1404/9/10
|
1404/9/12
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.5660377358490566
|
Edit
Details
Delete
|
|
6.6
|
مونتاژ يك روز خط-بسته به برنامه توليد
|
3.0d
|
3.0d
|
2025/12/04
|
12/4/2025 12:00:00 AM
|
2025/12/08
|
12/8/2025 12:00:00 AM
|
79
|
1404/9/13
|
1404/9/17
|
0
|
0
|
0
|
0
|
0
|
مهندسي توليد /مهندسي پروژه
|
0.5660377358490566
|
Edit
Details
Delete
|
|
6.7
|
ارزيابي يك روز خط
|
4.0d
|
4.0d
|
2026/01/01
|
1/1/2026 12:00:00 AM
|
2026/01/06
|
1/6/2026 12:00:00 AM
|
80,73
|
1404/10/11
|
1404/10/16
|
0
|
0
|
0
|
0
|
0
|
كادك ( آقاي عبدي)
|
0.7547169811320755
|
Edit
Details
Delete
|
|
6.8
|
تاييديه يك روز خط
|
2.0d
|
2.0d
|
2026/01/06
|
1/6/2026 12:00:00 AM
|
2026/01/08
|
1/8/2026 12:00:00 AM
|
81
|
1404/10/16
|
1404/10/18
|
0
|
0
|
0
|
0
|
0
|
كادك ( آقاي عبدي)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
6.9
|
انجام تست هاي ذكر شده در تست پلن، تهيه تست ريپورت
|
36.0d
|
0.0d
|
2025/11/22
|
11/22/2025 12:00:00 AM
|
2026/01/07
|
1/7/2026 12:00:00 AM
|
|
1404/9/1
|
1404/10/17
|
0
|
0
|
0
|
0
|
0
|
|
6.7924528301886795
|
Edit
Details
Delete
|
|
6.9.1
|
دريافت پيش فاكتور از آزمايشگاه
|
2.0d
|
2.0d
|
2025/11/22
|
11/22/2025 12:00:00 AM
|
2025/11/25
|
11/25/2025 12:00:00 AM
|
58
|
1404/9/1
|
1404/9/4
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.37735849056603776
|
Edit
Details
Delete
|
|
6.9.2
|
پرداخت مبلغ انجام تست
|
2.0d
|
2.0d
|
2025/11/25
|
11/25/2025 12:00:00 AM
|
2025/11/27
|
11/27/2025 12:00:00 AM
|
84
|
1404/9/4
|
1404/9/6
|
0
|
0
|
0
|
0
|
0
|
خزانه ( آقاي محمودي)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
6.9.3
|
ارسال قطعات به ازمايشگاه
|
2.0d
|
2.0d
|
2025/11/29
|
11/29/2025 12:00:00 AM
|
2025/11/30
|
11/30/2025 12:00:00 AM
|
85
|
1404/9/8
|
1404/9/9
|
0
|
0
|
0
|
0
|
0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.37735849056603776
|
Edit
Details
Delete
|
|
6.9.4
|
انجام آزمون و تهيه تست ريپورت
|
30.0d
|
30.0d
|
2025/12/01
|
12/1/2025 12:00:00 AM
|
2026/01/07
|
1/7/2026 12:00:00 AM
|
86
|
1404/9/10
|
1404/10/17
|
0
|
0
|
0
|
0
|
0
|
آزمايشگاه مشخص نيست
|
5.660377358490567
|
Edit
Details
Delete
|
|
7
|
اتمام پروژه- سفارشگذاري جهت توليد انبوه
|
0.0d
|
0.0d
|
2026/01/08
|
1/8/2026 12:00:00 AM
|
2026/01/08
|
1/8/2026 12:00:00 AM
|
82,83
|
1404/10/18
|
1404/10/18
|
0
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
0
|
Exhaust-SR6
|
0.398958
|
0.398958
|
2025/05/01
|
2025-05-01 08:00
|
2026/01/08
|
2026-01-08 12:00
|
|
1404/2/11
|
1404/10/18
|
0
|
22.0
|
0
|
42.9971
|
0.0
|
|
99.99999999999997
|
Edit
Details
Delete
|
|
1
|
امكان سنجي و توجيه اقتصادي پروژه
|
0
|
0
|
2025/05/01
|
2025-05-01 08:00
|
2025/05/01
|
2025-05-01 08:00
|
|
1404/2/11
|
1404/2/11
|
0
|
100.0
|
0
|
0
|
0.0
|
مسئول پروژه ( آقاي رضائي فرد)/كنترل پروژه
|
0.0
|
Edit
Details
Delete
|
|
2
|
شروع پروژه
|
0
|
0
|
2025/05/01
|
2025-05-01 08:00
|
2025/05/01
|
2025-05-01 08:00
|
1
|
1404/2/11
|
1404/2/11
|
0
|
100.0
|
0
|
0
|
0.0
|
|
0.0
|
Edit
Details
Delete
|
|
3
|
فاز مهندسي
|
0.090625
|
0.090625
|
2025/05/01
|
2025-05-01 08:00
|
2025/06/29
|
2025-06-29 12:00
|
1
|
1404/2/11
|
1404/4/8
|
0
|
100.0
|
0
|
43.5
|
0.0
|
|
7.169811320754718
|
Edit
Details
Delete
|
|
3.1
|
دريافت اطلاعات فني از مشتري (نقشه، شناسنامه فني ، تست پلن و ...)
|
0.0145833
|
0.0145833
|
2025/05/01
|
2025-05-01 08:00
|
2025/05/10
|
2025-05-10 17:00
|
1
|
1404/2/11
|
1404/2/20
|
50
|
100.0
|
0
|
7
|
0.0
|
مهندسي پروژه ( آقاي ابراهيم )
|
1.3207547169811322
|
Edit
Details
Delete
|
|
3.2
|
دريافت نمونه اگزوز وارداتي ( مجموعه كامل)
|
0.00416667
|
0.00416667
|
2025/06/03
|
2025-06-03 08:00
|
2025/06/04
|
2025-06-04 17:00
|
1
|
1404/3/13
|
1404/3/14
|
100
|
100.0
|
0
|
2
|
0.0
|
مهندسي پروژه ( آقاي يعقوبي)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
3.3
|
دريافت نمونه اگزوز وارداتي (منفصله )
|
0.0145833
|
0.0145833
|
2025/05/01
|
2025-05-01 08:00
|
2025/05/10
|
2025-05-10 17:00
|
1
|
1404/2/11
|
1404/2/20
|
100
|
100.0
|
0
|
7
|
0.0
|
مهندسي پروژه ( آقاي يعقوبي)
|
1.3207547169811322
|
Edit
Details
Delete
|
|
3.4
|
spl /Bomتهيه اوليه
|
0.0104167
|
0.0104167
|
2025/06/07
|
2025-06-07 08:00
|
2025/06/11
|
2025-06-11 17:00
|
5,4
|
1404/3/17
|
1404/3/21
|
50
|
100.0
|
0
|
5
|
0.0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.9433962264150944
|
Edit
Details
Delete
|
|
3.5
|
اسكن اگزوز دريافتي
|
0.0291667
|
0.0291667
|
2025/06/07
|
2025-06-07 08:00
|
2025/06/24
|
2025-06-24 17:00
|
5
|
1404/3/17
|
1404/4/3
|
50
|
100.0
|
0
|
14
|
0.0
|
بازرگاني ( آقاي مرادي)
|
2.6415094339622645
|
Edit
Details
Delete
|
|
3.6
|
بررسي نمونه دريافتي با نقشه هاو اعلام مغايرت ها /bom
|
0.00416667
|
0.00416667
|
2025/06/25
|
2025-06-25 08:00
|
2025/06/28
|
2025-06-28 12:00
|
4,8
|
1404/4/4
|
1404/4/7
|
20
|
100.0
|
0
|
2
|
0.0
|
مسئول پروژه ( آقاي رضائي فرد)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
3.7
|
تهيه و ارسال نقشه هاي اگزوز به واحد بازرگاني
|
0.00208333
|
0.00208333
|
2025/06/28
|
2025-06-28 13:00
|
2025/06/29
|
2025-06-29 12:00
|
9
|
1404/4/7
|
1404/4/8
|
50
|
100.0
|
0
|
1
|
0.0
|
مهندسي پروژه ( آقاي يعقوبي)
|
0.18867924528301888
|
Edit
Details
Delete
|
|
3.8
|
پايان فاز مهندسي
|
0
|
0
|
2025/06/29
|
2025-06-29 12:00
|
2025/06/29
|
2025-06-29 12:00
|
4,5,7,9,10
|
1404/4/8
|
1404/4/8
|
0
|
100.0
|
0
|
0
|
0.0
|
|
0.0
|
Edit
Details
Delete
|
|
4
|
فاز تامين و قالب سازي
|
0.127083
|
0.127083
|
2025/06/07
|
2025-06-07 08:00
|
2025/08/25
|
2025-08-25 17:00
|
|
1404/3/17
|
1404/6/3
|
0
|
32.0
|
0
|
19.764
|
0.0
|
|
47.169811320754725
|
Edit
Details
Delete
|
|
4.1
|
نمونه مقدماتي اگزوزبا منبع ،لوله و هنگر
|
0.127083
|
0.127083
|
2025/06/07
|
2025-06-07 08:00
|
2025/08/25
|
2025-08-25 17:00
|
|
1404/3/17
|
1404/6/3
|
0
|
41.0
|
0
|
25
|
0.0
|
|
11.509433962264152
|
Edit
Details
Delete
|
|
4.1.1
|
انتخاب پيمانكار
|
0.0104167
|
0.0104167
|
2025/06/07
|
2025-06-07 08:00
|
2025/06/11
|
2025-06-11 17:00
|
5
|
1404/3/17
|
1404/3/21
|
100
|
100.0
|
0
|
5
|
0.0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.9433962264150944
|
Edit
Details
Delete
|
|
4.1.2
|
مذاکره با پیمانکار جهت بررسي و ساخت اگزوز
|
0.0333333
|
0.0333333
|
2025/06/12
|
2025-06-12 08:00
|
2025/07/03
|
2025-07-03 17:00
|
14
|
1404/3/22
|
1404/4/12
|
100
|
100.0
|
0
|
16
|
0.0
|
بازرگاني ( آقايان صفائي / نظري )
|
3.018867924528302
|
Edit
Details
Delete
|
|
4.1.3
|
توليد 5 ست بعنوان نمونه اوليه
|
0.0729167
|
0.0729167
|
2025/07/06
|
2025-07-06 08:00
|
2025/08/19
|
2025-08-19 12:00
|
15
|
1404/4/15
|
1404/5/28
|
0
|
11.0
|
0
|
4
|
0.0
|
تامين كننده ( ايران اگزوز )
|
6.60377358490566
|
Edit
Details
Delete
|
|
4.1.4
|
ارسال نمونه هاي اوليه به كارخانه
|
0.0104167
|
0.0104167
|
2025/08/19
|
2025-08-19 13:00
|
2025/08/25
|
2025-08-25 17:00
|
16
|
1404/5/28
|
1404/6/3
|
0
|
0.0
|
0
|
0
|
0.0
|
تامين كننده ( ايران اگزوز )
|
0.9433962264150944
|
Edit
Details
Delete
|
|
4.2
|
GPF
|
0.0375
|
0.0375
|
2025/06/29
|
2025-06-29 13:00
|
2025/07/22
|
2025-07-22 17:00
|
|
1404/4/8
|
1404/4/31
|
0
|
62.0
|
0
|
11.0769
|
0.0
|
|
4.90566037735849
|
Edit
Details
Delete
|
|
4.2.1
|
X5 توليدقطعات مشابه كاتاباكس(عايق حرارت گير ، شيپوري و براكت )
|
0.03125
|
0.03125
|
2025/06/29
|
2025-06-29 13:00
|
2025/07/19
|
2025-07-19 17:00
|
10
|
1404/4/8
|
1404/4/28
|
0
|
53.0
|
0
|
8
|
0.0
|
تامين كننده كاراحديد نامي
|
2.8301886792452833
|
Edit
Details
Delete
|
|
4.2.2
|
سفارشگذاري و توليد پوسته
|
0.00208333
|
0.00208333
|
2025/06/29
|
2025-06-29 13:00
|
2025/06/30
|
2025-06-30 12:00
|
10
|
1404/4/8
|
1404/4/9
|
0
|
100.0
|
0
|
1
|
0.0
|
آريا پاك مبدل
|
0.18867924528301888
|
Edit
Details
Delete
|
|
4.2.3
|
تامين مهره و پيچ جوشي براكت
|
0.0145833
|
0.0145833
|
2025/06/29
|
2025-06-29 13:00
|
2025/07/08
|
2025-07-08 17:00
|
10
|
1404/4/8
|
1404/4/17
|
0
|
100.0
|
0
|
7
|
0.0
|
سازنده مشخص نشده
|
1.3207547169811322
|
Edit
Details
Delete
|
|
4.2.4
|
ارسال قطعات توليدي به بم
|
0.00625
|
0.00625
|
2025/07/20
|
2025-07-20 08:00
|
2025/07/22
|
2025-07-22 17:00
|
19,21,20
|
1404/4/29
|
1404/4/31
|
0
|
0.0
|
0
|
0
|
0.0
|
تامين كننده كاراحديد نامي
|
0.5660377358490566
|
Edit
Details
Delete
|
|
4.3
|
سر اگزوز
|
0.0916667
|
0.0916667
|
2025/06/29
|
2025-06-29 13:00
|
2025/08/25
|
2025-08-25 17:00
|
|
1404/4/8
|
1404/6/3
|
0
|
18.0
|
0
|
8
|
0.0
|
|
8.30188679245283
|
Edit
Details
Delete
|
|
4.3.1
|
انتخاب پيمانكار ساخت قالب
|
0.0104167
|
0.0104167
|
2025/06/29
|
2025-06-29 13:00
|
2025/07/06
|
2025-07-06 17:00
|
10,6
|
1404/4/8
|
1404/4/15
|
0
|
100.0
|
0
|
5
|
0.0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.9433962264150944
|
Edit
Details
Delete
|
|
4.3.2
|
عقد قرارداد و پيش پرداخت
|
0.0104167
|
0.0104167
|
2025/07/07
|
2025-07-07 08:00
|
2025/07/13
|
2025-07-13 12:00
|
24
|
1404/4/16
|
1404/4/22
|
0
|
60.0
|
0
|
3
|
0.0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.9433962264150944
|
Edit
Details
Delete
|
|
4.3.3
|
ساخت قالب ها
|
0.0625
|
0.0625
|
2025/07/13
|
2025-07-13 13:00
|
2025/08/20
|
2025-08-20 12:00
|
25
|
1404/4/22
|
1404/5/29
|
0
|
0.0
|
0
|
0
|
0.0
|
تامين كننده ( افرا كوشا فدك)
|
5.660377358490567
|
Edit
Details
Delete
|
|
4.3.4
|
توليد نمونه
|
0.00416667
|
0.00416667
|
2025/08/20
|
2025-08-20 13:00
|
2025/08/23
|
2025-08-23 17:00
|
26
|
1404/5/29
|
1404/6/1
|
0
|
0.0
|
0
|
0
|
0.0
|
تامين كننده ( افرا كوشا فدك)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
4.3.5
|
تائيديه قالب و نمونه
|
0.00416667
|
0.00416667
|
2025/08/24
|
2025-08-24 08:00
|
2025/08/25
|
2025-08-25 17:00
|
27
|
1404/6/2
|
1404/6/3
|
0
|
0.0
|
0
|
0
|
0.0
|
مسئول پروژه ( آقاي رضائي فرد)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
4.4
|
Pipe قالبسازي براكت
|
0.0916667
|
0.0916667
|
2025/06/29
|
2025-06-29 13:00
|
2025/08/25
|
2025-08-25 17:00
|
|
1404/4/8
|
1404/6/3
|
0
|
18.0
|
0
|
8
|
0.0
|
|
8.30188679245283
|
Edit
Details
Delete
|
|
4.4.1
|
انتخاب پيمانكار ساخت قالب
|
0.0104167
|
0.0104167
|
2025/06/29
|
2025-06-29 13:00
|
2025/07/06
|
2025-07-06 17:00
|
10,6
|
1404/4/8
|
1404/4/15
|
0
|
100.0
|
0
|
5
|
0.0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.9433962264150944
|
Edit
Details
Delete
|
|
4.4.2
|
عقد قرارداد و پيش پرداخت
|
0.00416667
|
0.00416667
|
2025/07/07
|
2025-07-07 08:00
|
2025/07/08
|
2025-07-08 17:00
|
30
|
1404/4/16
|
1404/4/17
|
0
|
100.0
|
0
|
2
|
0.0
|
سازنده قالب نهائي نشده
|
0.37735849056603776
|
Edit
Details
Delete
|
|
4.4.3
|
ساخت قالب ها
|
0.0708333
|
0.0708333
|
2025/07/09
|
2025-07-09 08:00
|
2025/08/21
|
2025-08-21 12:00
|
31
|
1404/4/18
|
1404/5/30
|
0
|
3.0
|
0
|
1
|
0.0
|
سازنده قالب نهائي نشده
|
6.415094339622642
|
Edit
Details
Delete
|
|
4.4.4
|
توليد نمونه
|
0.00416667
|
0.00416667
|
2025/08/23
|
2025-08-23 08:00
|
2025/08/24
|
2025-08-24 17:00
|
32
|
1404/6/1
|
1404/6/2
|
0
|
0.0
|
0
|
0
|
0.0
|
سازنده قالب نهائي نشده
|
0.37735849056603776
|
Edit
Details
Delete
|
|
4.4.5
|
تائيديه قالب و نمونه
|
0.00208333
|
0.00208333
|
2025/08/25
|
2025-08-25 08:00
|
2025/08/25
|
2025-08-25 17:00
|
33
|
1404/6/3
|
1404/6/3
|
0
|
0.0
|
0
|
0
|
0.0
|
سازنده قالب نهائي نشده
|
0.18867924528301888
|
Edit
Details
Delete
|
|
4.5
|
مهره سنسور فشار و دما ( مشترك X5-J7-SR6)
|
0.0625
|
0.0625
|
2025/06/29
|
2025-06-29 13:00
|
2025/08/06
|
2025-08-06 17:00
|
|
1404/4/8
|
1404/5/15
|
0
|
27.0
|
0
|
8
|
0.0
|
|
5.660377358490567
|
Edit
Details
Delete
|
|
4.5.1
|
انتخاب تراشكار
|
0.0145833
|
0.0145833
|
2025/06/29
|
2025-06-29 13:00
|
2025/07/08
|
2025-07-08 17:00
|
10
|
1404/4/8
|
1404/4/17
|
0
|
100.0
|
0
|
7
|
0.0
|
ماشين كار مشخص نشده است
|
1.3207547169811322
|
Edit
Details
Delete
|
|
4.5.2
|
عقد قرارداد و پيش پرداخت
|
0.00416667
|
0.00416667
|
2025/07/09
|
2025-07-09 08:00
|
2025/07/12
|
2025-07-12 12:00
|
36
|
1404/4/18
|
1404/4/21
|
0
|
50.0
|
0
|
1
|
0.0
|
ماشين كار مشخص نشده است
|
0.37735849056603776
|
Edit
Details
Delete
|
|
4.5.3
|
توليد نمونه
|
0.0416667
|
0.0416667
|
2025/07/12
|
2025-07-12 13:00
|
2025/08/05
|
2025-08-05 17:00
|
37
|
1404/4/21
|
1404/5/14
|
0
|
0.0
|
0
|
0
|
0.0
|
ماشين كار مشخص نشده است
|
3.7735849056603774
|
Edit
Details
Delete
|
|
4.5.4
|
تائيديه نمونه
|
0.00208333
|
0.00208333
|
2025/08/06
|
2025-08-06 08:00
|
2025/08/06
|
2025-08-06 17:00
|
38
|
1404/5/15
|
1404/5/15
|
0
|
0.0
|
0
|
0
|
0.0
|
ماشين كار مشخص نشده است
|
0.18867924528301888
|
Edit
Details
Delete
|
|
4.6
|
منجيد(مشابه )
|
0.0208333
|
0.0208333
|
2025/06/29
|
2025-06-29 13:00
|
2025/07/13
|
2025-07-13 12:00
|
|
1404/4/8
|
1404/4/22
|
0
|
80.0
|
0
|
8
|
0.0
|
|
1.8867924528301887
|
Edit
Details
Delete
|
|
4.6.1
|
تامين منجيد دو سوراخ
|
0.0208333
|
0.0208333
|
2025/06/29
|
2025-06-29 13:00
|
2025/07/13
|
2025-07-13 12:00
|
10
|
1404/4/8
|
1404/4/22
|
50
|
80.0
|
0
|
8
|
0.0
|
آذين پليمر/ بازرگاني(آقاي صفائي)
|
1.8867924528301887
|
Edit
Details
Delete
|
|
4.7
|
مت و منوليت
|
0.0729167
|
0.0729167
|
2025/06/29
|
2025-06-29 13:00
|
2025/08/13
|
2025-08-13 12:00
|
|
1404/4/8
|
1404/5/22
|
0
|
23.0
|
0
|
8
|
0.0
|
|
6.60377358490566
|
Edit
Details
Delete
|
|
4.7.1
|
سفارش گذاري براي پك ckd مت منوليت
|
0.0729167
|
0.0729167
|
2025/06/29
|
2025-06-29 13:00
|
2025/08/13
|
2025-08-13 12:00
|
10
|
1404/4/8
|
1404/5/22
|
0
|
23.0
|
0
|
8
|
0.0
|
بازرگاني خارجي ( آقاي محمودي)
|
6.60377358490566
|
Edit
Details
Delete
|
|
4.8
|
پايان تامين و قالب سازي
|
0
|
0
|
2025/08/25
|
2025-08-25 17:00
|
2025/08/25
|
2025-08-25 17:00
|
22,17,28,34,39,41,43
|
1404/6/3
|
1404/6/3
|
0
|
0.0
|
0
|
0
|
0.0
|
|
0.0
|
Edit
Details
Delete
|
|
5
|
فاز نمونه اوليه وساخت فيكسچر
|
0.204167
|
0.204167
|
2025/08/26
|
2025-08-26 08:00
|
2025/12/31
|
2025-12-31 17:00
|
|
1404/6/4
|
1404/10/10
|
0
|
0.0
|
0
|
0
|
0.0
|
|
32.83018867924529
|
Edit
Details
Delete
|
|
5.1
|
توليد 5 عدد مجموعه اگزوز اوليه
|
0.00416667
|
0.00416667
|
2025/08/26
|
2025-08-26 08:00
|
2025/08/27
|
2025-08-27 17:00
|
17,44
|
1404/6/4
|
1404/6/5
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي محصول ( آقاي غضنفري)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
5.2
|
تحويل به مهندسي محصول كرمان موتور جهت بررسي
|
0.00625
|
0.00625
|
2025/08/28
|
2025-08-28 08:00
|
2025/09/02
|
2025-09-02 12:00
|
46
|
1404/6/6
|
1404/6/11
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي محصول ( آقاي غضنفري)/مهندسي محصول كرمان موتور ( آقاي تيرگر)
|
0.5660377358490566
|
Edit
Details
Delete
|
|
5.3
|
ثبت كارتابل نمونه اوليه
|
0.00416667
|
0.00416667
|
2025/09/02
|
2025-09-02 13:00
|
2025/09/04
|
2025-09-04 12:00
|
47
|
1404/6/11
|
1404/6/13
|
0
|
0.0
|
0
|
0
|
0.0
|
كادك ( خانم معافي)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
5.4
|
اخذ تاييديه نمونه اوليه
|
0.0208333
|
0.0208333
|
2025/09/06
|
2025-09-06 08:00
|
2025/09/18
|
2025-09-18 12:00
|
|
1404/6/15
|
1404/6/27
|
0
|
0.0
|
0
|
0
|
0.0
|
|
1.8867924528301887
|
Edit
Details
Delete
|
|
5.4.1
|
انجام تست هاي مونتاژ پذيري در بم
|
0.0104167
|
0.0104167
|
2025/09/06
|
2025-09-06 08:00
|
2025/09/13
|
2025-09-13 12:00
|
48
|
1404/6/15
|
1404/6/22
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي محصول كرمان موتور
|
0.9433962264150944
|
Edit
Details
Delete
|
|
5.4.2
|
ارسال گزارش
|
0.00416667
|
0.00416667
|
2025/09/13
|
2025-09-13 13:00
|
2025/09/15
|
2025-09-15 12:00
|
50
|
1404/6/22
|
1404/6/24
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي محصول كرمان موتور
|
0.37735849056603776
|
Edit
Details
Delete
|
|
5.4.3
|
اخذ تائيديه
|
0.00625
|
0.00625
|
2025/09/15
|
2025-09-15 13:00
|
2025/09/18
|
2025-09-18 12:00
|
51
|
1404/6/24
|
1404/6/27
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.5660377358490566
|
Edit
Details
Delete
|
|
5.5
|
تهيه نهايي BOM
|
0.00416667
|
0.00416667
|
2025/09/20
|
2025-09-20 08:00
|
2025/09/21
|
2025-09-21 17:00
|
52
|
1404/6/29
|
1404/6/30
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي محصول( خانم فرامرز پور)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
5.6
|
آدیت تضمین کیفیت
|
0.00208333
|
0.00208333
|
2025/09/22
|
2025-09-22 08:00
|
2025/09/22
|
2025-09-22 17:00
|
53,52
|
1404/6/31
|
1404/6/31
|
0
|
0.0
|
0
|
0
|
0.0
|
تضمين كيفيت ( آقاي جلال الديني)
|
0.18867924528301888
|
Edit
Details
Delete
|
|
5.7
|
تست آلايندگي
|
0.104167
|
0.104167
|
2025/09/20
|
2025-09-20 08:00
|
2025/11/22
|
2025-11-22 12:00
|
|
1404/6/29
|
1404/9/1
|
0
|
0.0
|
0
|
0
|
0.0
|
|
9.433962264150944
|
Edit
Details
Delete
|
|
5.7.1
|
ارسال نمونه به تهران جهت ارسال به كرمان موتور براي انجام تست
|
0.00625
|
0.00625
|
2025/09/20
|
2025-09-20 08:00
|
2025/09/22
|
2025-09-22 17:00
|
52
|
1404/6/29
|
1404/6/31
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي محصول كرمان موتور
|
0.5660377358490566
|
Edit
Details
Delete
|
|
5.7.2
|
تست آلايندگي و تست توان سر چرخ نمونه مطالعاتی
|
0.09375
|
0.09375
|
2025/09/23
|
2025-09-23 08:00
|
2025/11/18
|
2025-11-18 17:00
|
56
|
1404/7/1
|
1404/8/27
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي محصول كرمان موتور
|
8.49056603773585
|
Edit
Details
Delete
|
|
5.7.3
|
ارسال نتايج به آرمان موتور جهت ثبت در آرشيو فني
|
0.00416667
|
0.00416667
|
2025/11/19
|
2025-11-19 08:00
|
2025/11/22
|
2025-11-22 12:00
|
57
|
1404/8/28
|
1404/9/1
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.37735849056603776
|
Edit
Details
Delete
|
|
5.8
|
فيكسچرهاي توليدي وكنترلي
|
0.16875
|
0.16875
|
2025/09/20
|
2025-09-20 08:00
|
2025/12/31
|
2025-12-31 17:00
|
|
1404/6/29
|
1404/10/10
|
0
|
0.0
|
0
|
0
|
0.0
|
|
19.62264150943396
|
Edit
Details
Delete
|
|
5.8.1
|
طراحي فيكسچر
|
0.0604167
|
0.0604167
|
2025/09/20
|
2025-09-20 08:00
|
2025/10/26
|
2025-10-26 12:00
|
|
1404/6/29
|
1404/8/4
|
0
|
0.0
|
0
|
0
|
0.0
|
|
5.471698113207547
|
Edit
Details
Delete
|
|
5.8.1.1
|
اسكن نمونه تائيد شده و مدلسازي
|
0.0291667
|
0.0291667
|
2025/09/20
|
2025-09-20 08:00
|
2025/10/06
|
2025-10-06 17:00
|
52
|
1404/6/29
|
1404/7/14
|
0
|
0.0
|
0
|
0
|
0.0
|
بازرگاني ( آقايان صفائي / نظري )
|
2.6415094339622645
|
Edit
Details
Delete
|
|
5.8.1.2
|
طراحي فيكسچر توليدي و كنترلي
|
0.0208333
|
0.0208333
|
2025/10/07
|
2025-10-07 08:00
|
2025/10/19
|
2025-10-19 17:00
|
61
|
1404/7/15
|
1404/7/27
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي پروژه ( آقاي يوسفيان)
|
1.8867924528301887
|
Edit
Details
Delete
|
|
5.8.1.3
|
اخذ تائيديه براي فيكسچرهاي كنترلي مجموعه نهايي از كادك
|
0.0104167
|
0.0104167
|
2025/10/20
|
2025-10-20 08:00
|
2025/10/26
|
2025-10-26 12:00
|
62
|
1404/7/28
|
1404/8/4
|
0
|
0.0
|
0
|
0
|
0.0
|
الزامات كادك ( آقاي صالحي)
|
0.9433962264150944
|
Edit
Details
Delete
|
|
5.8.2
|
ساخت فيكسچرتوليدي
|
0.0479167
|
0.0479167
|
2025/10/26
|
2025-10-26 13:00
|
2025/11/25
|
2025-11-25 12:00
|
|
1404/8/4
|
1404/9/4
|
0
|
0.0
|
0
|
0
|
0.0
|
|
4.339622641509434
|
Edit
Details
Delete
|
|
5.8.2.1
|
ليزر برش قطعات فيكسچر توليدي
|
0.03125
|
0.03125
|
2025/10/26
|
2025-10-26 13:00
|
2025/11/13
|
2025-11-13 12:00
|
63
|
1404/8/4
|
1404/8/22
|
0
|
0.0
|
0
|
0
|
0.0
|
سازنده مشخص نشده
|
2.8301886792452833
|
Edit
Details
Delete
|
|
5.8.2.2
|
ارسال فيكسچر به بم
|
0.00625
|
0.00625
|
2025/11/15
|
2025-11-15 08:00
|
2025/11/17
|
2025-11-17 17:00
|
65
|
1404/8/24
|
1404/8/26
|
0
|
0.0
|
0
|
0
|
0.0
|
بازرگاني ( آقاي مرادي),مهندسي پروژه ( آقاي يوسفيان)
|
0.5660377358490566
|
Edit
Details
Delete
|
|
5.8.2.3
|
مونتاژ فيكسچر هاي توليدي در كارخانه
|
0.0104167
|
0.0104167
|
2025/11/18
|
2025-11-18 08:00
|
2025/11/25
|
2025-11-25 12:00
|
66
|
1404/8/27
|
1404/9/4
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي ابزار(آقاي ترك پور)
|
0.9433962264150944
|
Edit
Details
Delete
|
|
5.8.3
|
ساخت فيكسچركنترلي
|
0.104167
|
0.104167
|
2025/10/26
|
2025-10-26 13:00
|
2025/12/29
|
2025-12-29 17:00
|
|
1404/8/4
|
1404/10/8
|
0
|
0.0
|
0
|
0
|
0.0
|
|
9.433962264150944
|
Edit
Details
Delete
|
|
5.8.3.1
|
ساخت فيكسچرهاي كنترلي
|
0.09375
|
0.09375
|
2025/10/26
|
2025-10-26 13:00
|
2025/12/23
|
2025-12-23 12:00
|
62,63
|
1404/8/4
|
1404/10/2
|
0
|
0.0
|
0
|
0
|
0.0
|
سازنده مشخص نشده
|
8.49056603773585
|
Edit
Details
Delete
|
|
5.8.3.2
|
گزارش گيري ابعادي/ cmm
|
0.00416667
|
0.00416667
|
2025/12/23
|
2025-12-23 13:00
|
2025/12/25
|
2025-12-25 12:00
|
69
|
1404/10/2
|
1404/10/4
|
0
|
0.0
|
0
|
0
|
0.0
|
سازنده مشخص نشده
|
0.37735849056603776
|
Edit
Details
Delete
|
|
5.8.3.3
|
ارسال فيكسچر به بم
|
0.00625
|
0.00625
|
2025/12/27
|
2025-12-27 08:00
|
2025/12/29
|
2025-12-29 17:00
|
70
|
1404/10/6
|
1404/10/8
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي پروژه ( آقاي يوسفيان),بازرگاني ( آقاي مرادي)
|
0.5660377358490566
|
Edit
Details
Delete
|
|
5.8.4
|
صورتجلسه تائيد و تحويل فيكسچرها به واحد توليد
|
0.00416667
|
0.00416667
|
2025/12/30
|
2025-12-30 08:00
|
2025/12/31
|
2025-12-31 17:00
|
67,71
|
1404/10/9
|
1404/10/10
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي پروژه ( آقاي يوسفيان),مهندسي ابزار(آقاي ترك پور)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
5.9
|
پايان فاز
|
0
|
0
|
2025/12/31
|
2025-12-31 17:00
|
2025/12/31
|
2025-12-31 17:00
|
52,58,67,63,71,72
|
1404/10/10
|
1404/10/10
|
0
|
0.0
|
0
|
0
|
0.0
|
|
0.0
|
Edit
Details
Delete
|
|
6
|
فاز يك روز خط
|
0.18125
|
0.18125
|
2025/09/20
|
2025-09-20 08:00
|
2026/01/08
|
2026-01-08 12:00
|
|
1404/6/29
|
1404/10/18
|
0
|
0.0
|
0
|
0
|
0.0
|
|
12.830188679245284
|
Edit
Details
Delete
|
|
6.1
|
سفارش گذاري 100 ست
|
0.0104167
|
0.0104167
|
2025/09/20
|
2025-09-20 08:00
|
2025/09/24
|
2025-09-24 17:00
|
49,52
|
1404/6/29
|
1404/7/2
|
0
|
0.0
|
0
|
0
|
0.0
|
بازرگاني ( آقايان صفائي / نظري )
|
0.9433962264150944
|
Edit
Details
Delete
|
|
6.2
|
توليد و ارسال قطعات يك روز خط به كارخانه
|
0.0208333
|
0.0208333
|
2025/09/25
|
2025-09-25 08:00
|
2025/10/07
|
2025-10-07 17:00
|
75
|
1404/7/3
|
1404/7/15
|
0
|
0.0
|
0
|
0
|
0.0
|
تامين كننده ( ايران اگزوز )
|
1.8867924528301887
|
Edit
Details
Delete
|
|
6.3
|
آديت فرآيند واحد تضمين كيفيت
|
0.00208333
|
0.00208333
|
2025/10/08
|
2025-10-08 08:00
|
2025/10/08
|
2025-10-08 17:00
|
76
|
1404/7/16
|
1404/7/16
|
0
|
0.0
|
0
|
0
|
0.0
|
تضمين كيفيت ( آقاي جلال الديني)
|
0.18867924528301888
|
Edit
Details
Delete
|
|
6.4
|
توليد يك روز خط اگزوز در آرمان موتور
|
0.00833333
|
0.00833333
|
2025/11/25
|
2025-11-25 13:00
|
2025/11/30
|
2025-11-30 17:00
|
77,76,67
|
1404/9/4
|
1404/9/9
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي توليد /مهندسي پروژه
|
0.7547169811320755
|
Edit
Details
Delete
|
|
6.5
|
ثبت كارتابل يك روز خط و ارسال قطعات به خط توليد كرمان موتور
|
0.00625
|
0.00625
|
2025/12/01
|
2025-12-01 08:00
|
2025/12/03
|
2025-12-03 17:00
|
78
|
1404/9/10
|
1404/9/12
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.5660377358490566
|
Edit
Details
Delete
|
|
6.6
|
مونتاژ يك روز خط-بسته به برنامه توليد
|
0.00625
|
0.00625
|
2025/12/04
|
2025-12-04 08:00
|
2025/12/08
|
2025-12-08 12:00
|
79
|
1404/9/13
|
1404/9/17
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي توليد /مهندسي پروژه
|
0.5660377358490566
|
Edit
Details
Delete
|
|
6.7
|
ارزيابي يك روز خط
|
0.00833333
|
0.00833333
|
2026/01/01
|
2026-01-01 08:00
|
2026/01/06
|
2026-01-06 12:00
|
80,73
|
1404/10/11
|
1404/10/16
|
0
|
0.0
|
0
|
0
|
0.0
|
كادك ( آقاي عبدي)
|
0.7547169811320755
|
Edit
Details
Delete
|
|
6.8
|
تاييديه يك روز خط
|
0.00416667
|
0.00416667
|
2026/01/06
|
2026-01-06 13:00
|
2026/01/08
|
2026-01-08 12:00
|
81
|
1404/10/16
|
1404/10/18
|
0
|
0.0
|
0
|
0
|
0.0
|
كادك ( آقاي عبدي)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
6.9
|
انجام تست هاي ذكر شده در تست پلن، تهيه تست ريپورت
|
0.075
|
0.075
|
2025/11/22
|
2025-11-22 13:00
|
2026/01/07
|
2026-01-07 12:00
|
|
1404/9/1
|
1404/10/17
|
0
|
0.0
|
0
|
0
|
0.0
|
|
6.7924528301886795
|
Edit
Details
Delete
|
|
6.9.1
|
دريافت پيش فاكتور از آزمايشگاه
|
0.00416667
|
0.00416667
|
2025/11/22
|
2025-11-22 13:00
|
2025/11/25
|
2025-11-25 12:00
|
58
|
1404/9/1
|
1404/9/4
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.37735849056603776
|
Edit
Details
Delete
|
|
6.9.2
|
پرداخت مبلغ انجام تست
|
0.00416667
|
0.00416667
|
2025/11/25
|
2025-11-25 13:00
|
2025/11/27
|
2025-11-27 12:00
|
84
|
1404/9/4
|
1404/9/6
|
0
|
0.0
|
0
|
0
|
0.0
|
خزانه ( آقاي محمودي)
|
0.37735849056603776
|
Edit
Details
Delete
|
|
6.9.3
|
ارسال قطعات به ازمايشگاه
|
0.00416667
|
0.00416667
|
2025/11/29
|
2025-11-29 08:00
|
2025/11/30
|
2025-11-30 17:00
|
85
|
1404/9/8
|
1404/9/9
|
0
|
0.0
|
0
|
0
|
0.0
|
مهندسي پروژه ( آقاي ابراهيم )
|
0.37735849056603776
|
Edit
Details
Delete
|
|
6.9.4
|
انجام آزمون و تهيه تست ريپورت
|
0.0625
|
0.0625
|
2025/12/01
|
2025-12-01 08:00
|
2026/01/07
|
2026-01-07 12:00
|
86
|
1404/9/10
|
1404/10/17
|
0
|
0.0
|
0
|
0
|
0.0
|
آزمايشگاه مشخص نيست
|
5.660377358490567
|
Edit
Details
Delete
|
|
7
|
اتمام پروژه- سفارشگذاري جهت توليد انبوه
|
0
|
0
|
2026/01/08
|
2026-01-08 12:00
|
2026/01/08
|
2026-01-08 12:00
|
82,83
|
1404/10/18
|
1404/10/18
|
0
|
0.0
|
0
|
0
|
0.0
|
|
0.0
|
Edit
Details
Delete
|
|
1
|
امكان سنجي و توجيه اقتصادي پروژه
|
20
|
0
|
2023/12/27
|
Dec 27 2023 9:30AM
|
2024/01/21
|
Jan 21 2024 12:00PM
|
2
|
1402/10/6
|
1402/11/1
|
100
|
0
|
0
|
9.75
|
0
|
|
9.75
|
Edit
Details
Delete
|
|
2
|
شروع پروژه
|
0
|
0
|
2023/12/27
|
Dec 27 2023 9:30AM
|
2023/12/27
|
Dec 27 2023 9:30AM
|
|
1402/10/6
|
1402/10/6
|
100
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
3
|
فاز مطالعاتی
|
27
|
0
|
2024/01/21
|
Jan 21 2024 12:00PM
|
2024/02/27
|
Feb 27 2024 10:30AM
|
1
|
1402/11/1
|
1402/12/8
|
0
|
0
|
0
|
18.12
|
0
|
|
18.12
|
Edit
Details
Delete
|
|
3.1
|
دريافت اطلاعات فني از مشتري (نقشه، شناسنامه فني ، تست پلن و ...)
|
5
|
0
|
2024/01/21
|
Jan 21 2024 12:00PM
|
2024/01/28
|
Jan 28 2024 3:00PM
|
1SS
|
1402/11/1
|
1402/11/8
|
100
|
0
|
0
|
2.44
|
0
|
|
2.44
|
Edit
Details
Delete
|
|
3.2
|
دريافت نمونه اگزوز وارداتي (منفصله و مجموعه كامل)
|
3
|
0
|
2024/01/21
|
Jan 21 2024 12:00PM
|
2024/01/24
|
Jan 24 2024 3:31PM
|
1SS
|
1402/11/1
|
1402/11/4
|
100
|
0
|
0
|
1.55
|
0
|
|
1.55
|
Edit
Details
Delete
|
|
3.3
|
انتخاب پيمانكار
|
5
|
0
|
2024/01/21
|
Jan 21 2024 12:00PM
|
2024/01/28
|
Jan 28 2024 3:00PM
|
1SS
|
1402/11/1
|
1402/11/8
|
100
|
0
|
0
|
2.44
|
0
|
|
2.44
|
Edit
Details
Delete
|
|
3.4
|
مذاکره با پیمانکار جهت بررسي و ساخت داخل اگزوز
|
5
|
0
|
2024/01/21
|
Jan 21 2024 12:00PM
|
2024/01/28
|
Jan 28 2024 3:00PM
|
1SS
|
1402/11/1
|
1402/11/8
|
100
|
0
|
0
|
2.44
|
0
|
|
2.44
|
Edit
Details
Delete
|
|
3.5
|
ساخت نمونه مطالعاتی
|
5
|
0
|
2024/01/28
|
Jan 28 2024 3:00PM
|
2024/02/04
|
Feb 4 2024 9:30AM
|
4,5,6,7
|
1402/11/8
|
1402/11/15
|
100
|
0
|
0
|
2.44
|
0
|
|
2.44
|
Edit
Details
Delete
|
|
3.6
|
تست و مونتاژ پذيري نمونه مطالعاتي - بم
|
2
|
0
|
2024/02/04
|
Feb 4 2024 9:30AM
|
2024/02/06
|
Feb 6 2024 10:30AM
|
8
|
1402/11/15
|
1402/11/17
|
100
|
0
|
0
|
0.97
|
0
|
|
0.97
|
Edit
Details
Delete
|
|
3.7
|
تست آلايندگي و تست توان سر چرخ نمونه مطالعاتی
|
10
|
0
|
2024/02/12
|
Feb 12 2024 12:00PM
|
2024/02/25
|
Feb 25 2024 9:30AM
|
9FS+3 days
|
1402/11/23
|
1402/12/6
|
100
|
0
|
0
|
4.87
|
0
|
|
4.87
|
Edit
Details
Delete
|
|
3.8
|
بررسي نتايج تست ها
|
1
|
0
|
2024/02/25
|
Feb 25 2024 9:30AM
|
2024/02/26
|
Feb 26 2024 10:00AM
|
10
|
1402/12/6
|
1402/12/7
|
100
|
0
|
0
|
0.49
|
0
|
|
0.49
|
Edit
Details
Delete
|
|
3.9
|
اخذ تاييدیه یک نمونه از نمونه های مطالعاتی
|
1
|
0
|
2024/02/26
|
Feb 26 2024 10:00AM
|
2024/02/27
|
Feb 27 2024 10:30AM
|
11
|
1402/12/7
|
1402/12/8
|
100
|
0
|
0
|
0.49
|
0
|
|
0.49
|
Edit
Details
Delete
|
|
4
|
فاز توليد و تاييد نمونه اوليه
|
44
|
0
|
2024/02/04
|
Feb 4 2024 9:30AM
|
2024/04/17
|
Apr 17 2024 9:00AM
|
|
1402/11/15
|
1403/1/29
|
0
|
0
|
0
|
42.4
|
0
|
|
42.4
|
Edit
Details
Delete
|
|
4.1
|
توليد 3 ست بعنوان نمونه اوليه
|
10
|
0
|
2024/02/04
|
Feb 4 2024 9:30AM
|
2024/02/18
|
Feb 18 2024 3:00PM
|
10FS-15 days
|
1402/11/15
|
1402/11/29
|
100
|
0
|
0
|
4.87
|
0
|
|
4.87
|
Edit
Details
Delete
|
|
4.2
|
ارسال نمونه هاي اوليه به كارخانه
|
2
|
0
|
2024/02/17
|
Feb 17 2024 2:30PM
|
2024/02/19
|
Feb 19 2024 3:30PM
|
14FS-1 day
|
1402/11/28
|
1402/11/30
|
100
|
0
|
0
|
0.97
|
0
|
|
0.97
|
Edit
Details
Delete
|
|
4.3
|
آدیت تضمین کیفیت
|
0
|
0
|
2024/02/19
|
Feb 19 2024 3:30PM
|
2024/02/19
|
Feb 19 2024 3:30PM
|
15
|
1402/11/30
|
1402/11/30
|
100
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
4.4
|
بررسي نمونه هاي اوليه توسط واحد مهندسي آرمان موتور
|
2
|
0
|
2024/02/19
|
Feb 19 2024 3:30PM
|
2024/02/21
|
Feb 21 2024 4:30PM
|
15
|
1402/11/30
|
1402/12/2
|
100
|
0
|
0
|
0.97
|
0
|
|
0.97
|
Edit
Details
Delete
|
|
4.5
|
ارسال نمونه هاي اوليه به شركت کرمان موتور
|
3
|
0
|
2024/02/22
|
Feb 22 2024 8:30AM
|
2024/02/26
|
Feb 26 2024 10:00AM
|
17
|
1402/12/3
|
1402/12/7
|
100
|
0
|
0
|
1.46
|
0
|
|
1.46
|
Edit
Details
Delete
|
|
4.6
|
بررسي و ارزيابي نمونه اوليه
|
4
|
0
|
2024/02/26
|
Feb 26 2024 10:00AM
|
2024/03/02
|
Mar 2 2024 12:00PM
|
18
|
1402/12/7
|
1402/12/12
|
100
|
0
|
0
|
1.95
|
0
|
|
1.95
|
Edit
Details
Delete
|
|
4.7
|
اعلام نتايج بررسي نمونه ها
|
1
|
0
|
2024/03/02
|
Mar 2 2024 12:00PM
|
2024/03/03
|
Mar 3 2024 12:30PM
|
19
|
1402/12/12
|
1402/12/13
|
100
|
0
|
0
|
0.49
|
0
|
|
0.49
|
Edit
Details
Delete
|
|
4.8
|
اخذ تاييديه نمونه اوليه
|
1
|
0
|
2024/03/03
|
Mar 3 2024 1:00PM
|
2024/03/04
|
Mar 4 2024 1:30PM
|
20
|
1402/12/13
|
1402/12/14
|
100
|
0
|
0
|
0.49
|
0
|
|
0.49
|
Edit
Details
Delete
|
|
4.9
|
ارسال نمونه تاييد شده به تهران جهت تهيه نقشه
|
2
|
0
|
2024/03/04
|
Mar 4 2024 1:30PM
|
2024/03/06
|
Mar 6 2024 2:30PM
|
21
|
1402/12/14
|
1402/12/16
|
100
|
0
|
0
|
0.97
|
0
|
|
0.97
|
Edit
Details
Delete
|
|
4.10
|
اسكن و مدلسازي
|
20
|
0
|
2024/02/19
|
Feb 19 2024 3:30PM
|
2024/03/16
|
Mar 16 2024 10:00AM
|
22FS-13 days
|
1402/11/30
|
1402/12/26
|
100
|
0
|
0
|
9.75
|
0
|
|
9.75
|
Edit
Details
Delete
|
|
4.11
|
طراحي فيكسچر توليدي و كنترلي
|
15
|
0
|
2024/02/28
|
Feb 28 2024 11:00AM
|
2024/03/18
|
Mar 18 2024 11:00AM
|
23FS-13 days
|
1402/12/9
|
1402/12/28
|
100
|
0
|
0
|
7.31
|
0
|
|
7.31
|
Edit
Details
Delete
|
|
4.12
|
ساخت فيكسچر توليدي و كنترلي
|
15
|
0
|
2024/03/06
|
Mar 6 2024 2:30PM
|
2024/04/08
|
Apr 8 2024 2:30PM
|
24FS-9 days
|
1402/12/16
|
1403/1/20
|
100
|
0
|
0
|
7.31
|
0
|
|
7.31
|
Edit
Details
Delete
|
|
4.13
|
مونتاژ فيكسچر ها در كارخانه
|
5
|
0
|
2024/04/08
|
Apr 8 2024 2:30PM
|
2024/04/17
|
Apr 17 2024 9:00AM
|
25
|
1403/1/20
|
1403/1/29
|
100
|
0
|
0
|
2.44
|
0
|
|
2.44
|
Edit
Details
Delete
|
|
4.14
|
عقد قرارداد توليد اگزوز و سفارش توليد 100 ست
|
7
|
0
|
2024/03/02
|
Mar 2 2024 12:00PM
|
2024/03/10
|
Mar 10 2024 4:00PM
|
21FS-2 days
|
1402/12/12
|
1402/12/20
|
100
|
0
|
0
|
3.41
|
0
|
|
3.41
|
Edit
Details
Delete
|
|
5
|
فاز يك روز خط
|
41
|
0
|
2024/02/27
|
Feb 27 2024 10:30AM
|
2024/05/05
|
May 5 2024 4:30PM
|
|
1402/12/8
|
1403/2/16
|
0
|
0
|
0
|
27.54
|
0
|
|
29.73
|
Edit
Details
Delete
|
|
5.1
|
پيش پرداخت قرارداد
|
5
|
0
|
2024/03/07
|
Mar 7 2024 3:00PM
|
2024/03/14
|
Mar 14 2024 9:30AM
|
27FS-2 days
|
1402/12/17
|
1402/12/24
|
100
|
0
|
0
|
2.44
|
0
|
|
2.44
|
Edit
Details
Delete
|
|
5.2
|
توليد و ارسال قطعات يك روز خط به كارخانه
|
10
|
0
|
2024/03/09
|
Mar 9 2024 3:30PM
|
2024/04/04
|
Apr 4 2024 12:30PM
|
29FS-4 days
|
1402/12/19
|
1403/1/16
|
100
|
0
|
0
|
4.87
|
0
|
|
4.87
|
Edit
Details
Delete
|
|
5.3
|
آديت فرآيند واحد تضمين كيفيت
|
0
|
0
|
2024/04/04
|
Apr 4 2024 12:30PM
|
2024/04/04
|
Apr 4 2024 12:30PM
|
30
|
1403/1/16
|
1403/1/16
|
0
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
5.4
|
توليد يك روز خط اگزوز در آرمان موتور
|
4
|
0
|
2024/04/14
|
Apr 14 2024 4:00PM
|
2024/04/20
|
Apr 20 2024 10:00AM
|
31SS,30FS-2 days,26FS-2 days
|
1403/1/26
|
1403/2/1
|
100
|
0
|
0
|
1.95
|
0
|
|
1.95
|
Edit
Details
Delete
|
|
5.5
|
مجوز يك روز خط
|
3
|
0
|
2024/04/20
|
Apr 20 2024 10:00AM
|
2024/04/23
|
Apr 23 2024 11:30AM
|
32
|
1403/2/1
|
1403/2/4
|
50
|
0
|
0
|
0.73
|
0
|
|
1.46
|
Edit
Details
Delete
|
|
5.6
|
مونتاژ يك روز خط-بسته به برنامه توليد
|
3
|
0
|
2024/04/23
|
Apr 23 2024 11:30AM
|
2024/04/27
|
Apr 27 2024 1:30PM
|
33
|
1403/2/4
|
1403/2/8
|
100
|
0
|
0
|
1.46
|
0
|
|
1.46
|
Edit
Details
Delete
|
|
5.7
|
انجام تست هاي ذكر شده در تست پلن، تهيه تست ريپورت
|
30
|
0
|
2024/02/27
|
Feb 27 2024 10:30AM
|
2024/04/21
|
Apr 21 2024 10:30AM
|
21FS-5 days,12FS-5 days
|
1402/12/8
|
1403/2/2
|
90
|
0
|
0
|
13.16
|
0
|
|
14.62
|
Edit
Details
Delete
|
|
5.8
|
ارزيابي يك روز خط
|
4
|
0
|
2024/04/27
|
Apr 27 2024 1:30PM
|
2024/05/01
|
May 1 2024 3:30PM
|
34
|
1403/2/8
|
1403/2/12
|
100
|
0
|
0
|
1.95
|
0
|
|
1.95
|
Edit
Details
Delete
|
|
5.9
|
تاييديه يك روز خط
|
2
|
0
|
2024/05/01
|
May 1 2024 3:30PM
|
2024/05/05
|
May 5 2024 4:30PM
|
36
|
1403/2/12
|
1403/2/16
|
100
|
0
|
0
|
0.97
|
0
|
|
0.97
|
Edit
Details
Delete
|
|
6
|
اتمام پروژه- سفارشگذاري جهت توليد انبوه
|
0
|
0
|
2024/05/05
|
May 5 2024 5:00PM
|
2024/05/05
|
May 5 2024 5:00PM
|
37,35
|
1403/2/16
|
1403/2/16
|
0
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
0
|
Exhaust-T9
|
88.0d
|
0.0d
|
2023/12/27
|
12/27/2023 12:00:00 AM
|
2024/05/05
|
5/5/2024 12:00:00 AM
|
|
1402/10/6
|
1403/2/16
|
0
|
0
|
0
|
97.8067076043342
|
0
|
|
99.99979693617298
|
Edit
Details
Delete
|
|
1
|
امكان سنجي و توجيه اقتصادي پروژه
|
20.0d
|
20.0d
|
2023/12/27
|
12/27/2023 12:00:00 AM
|
2024/01/21
|
1/21/2024 12:00:00 AM
|
2
|
1402/10/6
|
1402/11/1
|
100
|
0
|
0
|
9.74706369706126
|
0
|
|
9.74706369706126
|
Edit
Details
Delete
|
|
2
|
شروع پروژه
|
0.0d
|
0.0d
|
2023/12/27
|
12/27/2023 12:00:00 AM
|
2023/12/27
|
12/27/2023 12:00:00 AM
|
|
1402/10/6
|
1402/10/6
|
100
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
3
|
فاز مطالعاتی
|
27.0d
|
0.0d
|
2024/01/21
|
1/21/2024 12:00:00 AM
|
2024/02/27
|
2/27/2024 12:00:00 AM
|
1
|
1402/11/1
|
1402/12/8
|
0
|
0
|
0
|
18.124461880858387
|
0
|
|
18.124461880858387
|
Edit
Details
Delete
|
|
3.1
|
دريافت اطلاعات فني از مشتري (نقشه، شناسنامه فني ، تست پلن و ...)
|
5.0d
|
5.0d
|
2024/01/21
|
1/21/2024 12:00:00 AM
|
2024/01/28
|
1/28/2024 12:00:00 AM
|
1
|
1402/11/1
|
1402/11/8
|
100
|
0
|
0
|
2.436765924265315
|
0
|
|
2.436765924265315
|
Edit
Details
Delete
|
|
3.2
|
دريافت نمونه اگزوز وارداتي (منفصله و مجموعه كامل)
|
3.19d
|
3.19d
|
2024/01/21
|
1/21/2024 12:00:00 AM
|
2024/01/24
|
1/24/2024 12:00:00 AM
|
1
|
1402/11/1
|
1402/11/4
|
100
|
0
|
0
|
1.5544535958542474
|
0
|
|
1.5544535958542474
|
Edit
Details
Delete
|
|
3.3
|
انتخاب پيمانكار
|
5.0d
|
5.0d
|
2024/01/21
|
1/21/2024 12:00:00 AM
|
2024/01/28
|
1/28/2024 12:00:00 AM
|
1
|
1402/11/1
|
1402/11/8
|
100
|
0
|
0
|
2.436765924265315
|
0
|
|
2.436765924265315
|
Edit
Details
Delete
|
|
3.4
|
مذاکره با پیمانکار جهت بررسي و ساخت داخل اگزوز
|
5.0d
|
5.0d
|
2024/01/21
|
1/21/2024 12:00:00 AM
|
2024/01/28
|
1/28/2024 12:00:00 AM
|
1
|
1402/11/1
|
1402/11/8
|
100
|
0
|
0
|
2.436765924265315
|
0
|
|
2.436765924265315
|
Edit
Details
Delete
|
|
3.5
|
ساخت نمونه مطالعاتی
|
5.0d
|
5.0d
|
2024/01/28
|
1/28/2024 12:00:00 AM
|
2024/02/04
|
2/4/2024 12:00:00 AM
|
4,5,6,7
|
1402/11/8
|
1402/11/15
|
100
|
0
|
0
|
2.436765924265315
|
0
|
|
2.436765924265315
|
Edit
Details
Delete
|
|
3.6
|
تست و مونتاژ پذيري نمونه مطالعاتي - بم
|
2.0d
|
2.0d
|
2024/02/04
|
2/4/2024 12:00:00 AM
|
2024/02/06
|
2/6/2024 12:00:00 AM
|
8
|
1402/11/15
|
1402/11/17
|
100
|
0
|
0
|
0.9747063697061259
|
0
|
|
0.9747063697061259
|
Edit
Details
Delete
|
|
3.7
|
تست آلايندگي و تست توان سر چرخ نمونه مطالعاتی
|
10.0d
|
10.0d
|
2024/02/12
|
2/12/2024 12:00:00 AM
|
2024/02/25
|
2/25/2024 12:00:00 AM
|
9
|
1402/11/23
|
1402/12/6
|
100
|
0
|
0
|
4.87353184853063
|
0
|
|
4.87353184853063
|
Edit
Details
Delete
|
|
3.8
|
بررسي نتايج تست ها
|
1.0d
|
1.0d
|
2024/02/25
|
2/25/2024 12:00:00 AM
|
2024/02/26
|
2/26/2024 12:00:00 AM
|
10
|
1402/12/6
|
1402/12/7
|
100
|
0
|
0
|
0.487353184853063
|
0
|
|
0.487353184853063
|
Edit
Details
Delete
|
|
3.9
|
اخذ تاييدیه یک نمونه از نمونه های مطالعاتی
|
1.0d
|
1.0d
|
2024/02/26
|
2/26/2024 12:00:00 AM
|
2024/02/27
|
2/27/2024 12:00:00 AM
|
11
|
1402/12/7
|
1402/12/8
|
100
|
0
|
0
|
0.487353184853063
|
0
|
|
0.487353184853063
|
Edit
Details
Delete
|
|
4
|
فاز توليد و تاييد نمونه اوليه
|
44.0d
|
0.0d
|
2024/02/04
|
2/4/2024 12:00:00 AM
|
2024/04/17
|
4/17/2024 12:00:00 AM
|
|
1402/11/15
|
1403/1/29
|
0
|
0
|
0
|
42.39972708221649
|
0
|
|
42.39972708221649
|
Edit
Details
Delete
|
|
4.1
|
توليد 3 ست بعنوان نمونه اوليه
|
10.0d
|
10.0d
|
2024/02/04
|
2/4/2024 12:00:00 AM
|
2024/02/18
|
2/18/2024 12:00:00 AM
|
10
|
1402/11/15
|
1402/11/29
|
100
|
0
|
0
|
4.87353184853063
|
0
|
|
4.87353184853063
|
Edit
Details
Delete
|
|
4.2
|
ارسال نمونه هاي اوليه به كارخانه
|
2.0d
|
2.0d
|
2024/02/17
|
2/17/2024 12:00:00 AM
|
2024/02/19
|
2/19/2024 12:00:00 AM
|
14
|
1402/11/28
|
1402/11/30
|
100
|
0
|
0
|
0.9747063697061259
|
0
|
|
0.9747063697061259
|
Edit
Details
Delete
|
|
4.3
|
آدیت تضمین کیفیت
|
0.0d
|
0.0d
|
2024/02/19
|
2/19/2024 12:00:00 AM
|
2024/02/19
|
2/19/2024 12:00:00 AM
|
15
|
1402/11/30
|
1402/11/30
|
100
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
4.4
|
بررسي نمونه هاي اوليه توسط واحد مهندسي آرمان موتور
|
2.0d
|
2.0d
|
2024/02/19
|
2/19/2024 12:00:00 AM
|
2024/02/21
|
2/21/2024 12:00:00 AM
|
15
|
1402/11/30
|
1402/12/2
|
100
|
0
|
0
|
0.9747063697061259
|
0
|
|
0.9747063697061259
|
Edit
Details
Delete
|
|
4.5
|
ارسال نمونه هاي اوليه به شركت کرمان موتور
|
3.0d
|
3.0d
|
2024/02/22
|
2/22/2024 12:00:00 AM
|
2024/02/26
|
2/26/2024 12:00:00 AM
|
17
|
1402/12/3
|
1402/12/7
|
100
|
0
|
0
|
1.462059554559189
|
0
|
|
1.462059554559189
|
Edit
Details
Delete
|
|
4.6
|
بررسي و ارزيابي نمونه اوليه
|
4.0d
|
4.0d
|
2024/02/26
|
2/26/2024 12:00:00 AM
|
2024/03/02
|
3/2/2024 12:00:00 AM
|
18
|
1402/12/7
|
1402/12/12
|
100
|
0
|
0
|
1.9494127394122518
|
0
|
|
1.9494127394122518
|
Edit
Details
Delete
|
|
4.7
|
اعلام نتايج بررسي نمونه ها
|
1.0d
|
1.0d
|
2024/03/02
|
3/2/2024 12:00:00 AM
|
2024/03/03
|
3/3/2024 12:00:00 AM
|
19
|
1402/12/12
|
1402/12/13
|
100
|
0
|
0
|
0.487353184853063
|
0
|
|
0.487353184853063
|
Edit
Details
Delete
|
|
4.8
|
اخذ تاييديه نمونه اوليه
|
1.0d
|
1.0d
|
2024/03/03
|
3/3/2024 12:00:00 AM
|
2024/03/04
|
3/4/2024 12:00:00 AM
|
20
|
1402/12/13
|
1402/12/14
|
100
|
0
|
0
|
0.487353184853063
|
0
|
|
0.487353184853063
|
Edit
Details
Delete
|
|
4.9
|
ارسال نمونه تاييد شده به تهران جهت تهيه نقشه
|
2.0d
|
2.0d
|
2024/03/04
|
3/4/2024 12:00:00 AM
|
2024/03/06
|
3/6/2024 12:00:00 AM
|
21
|
1402/12/14
|
1402/12/16
|
100
|
0
|
0
|
0.9747063697061259
|
0
|
|
0.9747063697061259
|
Edit
Details
Delete
|
|
4.10
|
اسكن و مدلسازي
|
20.0d
|
20.0d
|
2024/02/19
|
2/19/2024 12:00:00 AM
|
2024/03/16
|
3/16/2024 12:00:00 AM
|
22
|
1402/11/30
|
1402/12/26
|
100
|
0
|
0
|
9.74706369706126
|
0
|
|
9.74706369706126
|
Edit
Details
Delete
|
|
4.11
|
طراحي فيكسچر توليدي و كنترلي
|
15.0d
|
15.0d
|
2024/02/28
|
2/28/2024 12:00:00 AM
|
2024/03/18
|
3/18/2024 12:00:00 AM
|
23
|
1402/12/9
|
1402/12/28
|
100
|
0
|
0
|
7.310297772795946
|
0
|
|
7.310297772795946
|
Edit
Details
Delete
|
|
4.12
|
ساخت فيكسچر توليدي و كنترلي
|
15.0d
|
15.0d
|
2024/03/06
|
3/6/2024 12:00:00 AM
|
2024/04/08
|
4/8/2024 12:00:00 AM
|
24
|
1402/12/16
|
1403/1/20
|
100
|
0
|
0
|
7.310297772795946
|
0
|
|
7.310297772795946
|
Edit
Details
Delete
|
|
4.13
|
مونتاژ فيكسچر ها در كارخانه
|
5.0d
|
5.0d
|
2024/04/08
|
4/8/2024 12:00:00 AM
|
2024/04/17
|
4/17/2024 12:00:00 AM
|
25
|
1403/1/20
|
1403/1/29
|
100
|
0
|
0
|
2.436765924265315
|
0
|
|
2.436765924265315
|
Edit
Details
Delete
|
|
4.14
|
عقد قرارداد توليد اگزوز و سفارش توليد 100 ست
|
7.0d
|
7.0d
|
2024/03/02
|
3/2/2024 12:00:00 AM
|
2024/03/10
|
3/10/2024 12:00:00 AM
|
21
|
1402/12/12
|
1402/12/20
|
100
|
0
|
0
|
3.4114722939714412
|
0
|
|
3.4114722939714412
|
Edit
Details
Delete
|
|
5
|
فاز يك روز خط
|
41.0d
|
0.0d
|
2024/02/27
|
2/27/2024 12:00:00 AM
|
2024/05/05
|
5/5/2024 12:00:00 AM
|
|
1402/12/8
|
1403/2/16
|
0
|
0
|
0
|
27.53545494419806
|
0
|
|
29.728544276036846
|
Edit
Details
Delete
|
|
5.1
|
پيش پرداخت قرارداد
|
5.0d
|
5.0d
|
2024/03/07
|
3/7/2024 12:00:00 AM
|
2024/03/14
|
3/14/2024 12:00:00 AM
|
27
|
1402/12/17
|
1402/12/24
|
100
|
0
|
0
|
2.436765924265315
|
0
|
|
2.436765924265315
|
Edit
Details
Delete
|
|
5.2
|
توليد و ارسال قطعات يك روز خط به كارخانه
|
10.0d
|
10.0d
|
2024/03/09
|
3/9/2024 12:00:00 AM
|
2024/04/04
|
4/4/2024 12:00:00 AM
|
29
|
1402/12/19
|
1403/1/16
|
100
|
0
|
0
|
4.87353184853063
|
0
|
|
4.87353184853063
|
Edit
Details
Delete
|
|
5.3
|
آديت فرآيند واحد تضمين كيفيت
|
0.0d
|
0.0d
|
2024/04/04
|
4/4/2024 12:00:00 AM
|
2024/04/04
|
4/4/2024 12:00:00 AM
|
30
|
1403/1/16
|
1403/1/16
|
0
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
5.4
|
توليد يك روز خط اگزوز در آرمان موتور
|
4.0d
|
4.0d
|
2024/04/14
|
4/14/2024 12:00:00 AM
|
2024/04/20
|
4/20/2024 12:00:00 AM
|
31,30,26
|
1403/1/26
|
1403/2/1
|
100
|
0
|
0
|
1.9494127394122518
|
0
|
|
1.9494127394122518
|
Edit
Details
Delete
|
|
5.5
|
مجوز يك روز خط
|
3.0d
|
3.0d
|
2024/04/20
|
4/20/2024 12:00:00 AM
|
2024/04/23
|
4/23/2024 12:00:00 AM
|
32
|
1403/2/1
|
1403/2/4
|
50
|
0
|
0
|
0.7310297772795945
|
0
|
|
1.462059554559189
|
Edit
Details
Delete
|
|
5.6
|
مونتاژ يك روز خط-بسته به برنامه توليد
|
3.0d
|
3.0d
|
2024/04/23
|
4/23/2024 12:00:00 AM
|
2024/04/27
|
4/27/2024 12:00:00 AM
|
33
|
1403/2/4
|
1403/2/8
|
100
|
0
|
0
|
1.462059554559189
|
0
|
|
1.462059554559189
|
Edit
Details
Delete
|
|
5.7
|
انجام تست هاي ذكر شده در تست پلن، تهيه تست ريپورت
|
30.0d
|
30.0d
|
2024/02/27
|
2/27/2024 12:00:00 AM
|
2024/04/21
|
4/21/2024 12:00:00 AM
|
21,12
|
1402/12/8
|
1403/2/2
|
90
|
0
|
0
|
13.158535991032702
|
0
|
|
14.620595545591891
|
Edit
Details
Delete
|
|
5.8
|
ارزيابي يك روز خط
|
4.0d
|
4.0d
|
2024/04/27
|
4/27/2024 12:00:00 AM
|
2024/05/01
|
5/1/2024 12:00:00 AM
|
34
|
1403/2/8
|
1403/2/12
|
100
|
0
|
0
|
1.9494127394122518
|
0
|
|
1.9494127394122518
|
Edit
Details
Delete
|
|
5.9
|
تاييديه يك روز خط
|
2.0d
|
2.0d
|
2024/05/01
|
5/1/2024 12:00:00 AM
|
2024/05/05
|
5/5/2024 12:00:00 AM
|
36
|
1403/2/12
|
1403/2/16
|
100
|
0
|
0
|
0.9747063697061259
|
0
|
|
0.9747063697061259
|
Edit
Details
Delete
|
|
6
|
اتمام پروژه- سفارشگذاري جهت توليد انبوه
|
0.0d
|
0.0d
|
2024/05/05
|
5/5/2024 12:00:00 AM
|
2024/05/05
|
5/5/2024 12:00:00 AM
|
37,35
|
1403/2/16
|
1403/2/16
|
0
|
0
|
0
|
0
|
0
|
|
0
|
Edit
Details
Delete
|
|
0
|
Exhaust-T9
|
0.183333
|
0.183333
|
2023/12/27
|
2023-12-27 09:30
|
2024/05/05
|
2024-05-05 17:00
|
|
1402/10/6
|
1403/2/16
|
0
|
0.0
|
0
|
0
|
0.0
|
|
99.99979693617298
|
Edit
Details
Delete
|
|
1
|
امكان سنجي و توجيه اقتصادي پروژه
|
0.0416667
|
0.0416667
|
2023/12/27
|
2023-12-27 09:30
|
2024/01/21
|
2024-01-21 12:00
|
2
|
1402/10/6
|
1402/11/1
|
100
|
0.0
|
0
|
0
|
0.0
|
|
9.74706369706126
|
Edit
Details
Delete
|
|
2
|
شروع پروژه
|
0
|
0
|
2023/12/27
|
2023-12-27 09:30
|
2023/12/27
|
2023-12-27 09:30
|
|
1402/10/6
|
1402/10/6
|
100
|
0.0
|
0
|
0
|
0.0
|
|
0.0
|
Edit
Details
Delete
|
|
3
|
فاز مطالعاتی
|
0.05625
|
0.05625
|
2024/01/21
|
2024-01-21 12:00
|
2024/02/27
|
2024-02-27 10:30
|
1
|
1402/11/1
|
1402/12/8
|
0
|
0.0
|
0
|
0
|
0.0
|
|
18.124461880858387
|
Edit
Details
Delete
|
|
3.1
|
دريافت اطلاعات فني از مشتري (نقشه، شناسنامه فني ، تست پلن و ...)
|
0.0104167
|
0.0104167
|
2024/01/21
|
2024-01-21 12:00
|
2024/01/28
|
2024-01-28 15:00
|
1
|
1402/11/1
|
1402/11/8
|
100
|
0.0
|
0
|
0
|
0.0
|
|
2.436765924265315
|
Edit
Details
Delete
|
|
3.2
|
دريافت نمونه اگزوز وارداتي (منفصله و مجموعه كامل)
|
0.00664583
|
0.00664583
|
2024/01/21
|
2024-01-21 12:00
|
2024/01/24
|
2024-01-24 15:31
|
1
|
1402/11/1
|
1402/11/4
|
100
|
0.0
|
0
|
0
|
0.0
|
|
1.5544535958542474
|
Edit
Details
Delete
|
|
3.3
|
انتخاب پيمانكار
|
0.0104167
|
0.0104167
|
2024/01/21
|
2024-01-21 12:00
|
2024/01/28
|
2024-01-28 15:00
|
1
|
1402/11/1
|
1402/11/8
|
100
|
0.0
|
0
|
0
|
0.0
|
|
2.436765924265315
|
Edit
Details
Delete
|
|
3.4
|
مذاکره با پیمانکار جهت بررسي و ساخت داخل اگزوز
|
0.0104167
|
0.0104167
|
2024/01/21
|
2024-01-21 12:00
|
2024/01/28
|
2024-01-28 15:00
|
1
|
1402/11/1
|
1402/11/8
|
100
|
0.0
|
0
|
0
|
0.0
|
|
2.436765924265315
|
Edit
Details
Delete
|
|
3.5
|
ساخت نمونه مطالعاتی
|
0.0104167
|
0.0104167
|
2024/01/28
|
2024-01-28 15:00
|
2024/02/04
|
2024-02-04 09:30
|
4,5,6,7
|
1402/11/8
|
1402/11/15
|
100
|
0.0
|
0
|
0
|
0.0
|
|
2.436765924265315
|
Edit
Details
Delete
|
|
3.6
|
تست و مونتاژ پذيري نمونه مطالعاتي - بم
|
0.00416667
|
0.00416667
|
2024/02/04
|
2024-02-04 09:30
|
2024/02/06
|
2024-02-06 10:30
|
8
|
1402/11/15
|
1402/11/17
|
100
|
0.0
|
0
|
0
|
0.0
|
|
0.9747063697061259
|
Edit
Details
Delete
|
|
3.7
|
تست آلايندگي و تست توان سر چرخ نمونه مطالعاتی
|
0.0208333
|
0.0208333
|
2024/02/12
|
2024-02-12 12:00
|
2024/02/25
|
2024-02-25 09:30
|
9
|
1402/11/23
|
1402/12/6
|
100
|
0.0
|
0
|
0
|
0.0
|
|
4.87353184853063
|
Edit
Details
Delete
|
|
3.8
|
بررسي نتايج تست ها
|
0.00208333
|
0.00208333
|
2024/02/25
|
2024-02-25 09:30
|
2024/02/26
|
2024-02-26 10:00
|
10
|
1402/12/6
|
1402/12/7
|
100
|
0.0
|
0
|
0
|
0.0
|
|
0.487353184853063
|
Edit
Details
Delete
|
|
3.9
|
اخذ تاييدیه یک نمونه از نمونه های مطالعاتی
|
0.00208333
|
0.00208333
|
2024/02/26
|
2024-02-26 10:00
|
2024/02/27
|
2024-02-27 10:30
|
11
|
1402/12/7
|
1402/12/8
|
100
|
0.0
|
0
|
0
|
0.0
|
|
0.487353184853063
|
Edit
Details
Delete
|
|
4
|
فاز توليد و تاييد نمونه اوليه
|
0.0916667
|
0.0916667
|
2024/02/04
|
2024-02-04 09:30
|
2024/04/17
|
2024-04-17 09:00
|
|
1402/11/15
|
1403/1/29
|
0
|
0.0
|
0
|
0
|
0.0
|
|
42.39972708221649
|
Edit
Details
Delete
|
|
4.1
|
توليد 3 ست بعنوان نمونه اوليه
|
0.0208333
|
0.0208333
|
2024/02/04
|
2024-02-04 09:30
|
2024/02/18
|
2024-02-18 15:00
|
10
|
1402/11/15
|
1402/11/29
|
100
|
0.0
|
0
|
0
|
0.0
|
|
4.87353184853063
|
Edit
Details
Delete
|
|
4.2
|
ارسال نمونه هاي اوليه به كارخانه
|
0.00416667
|
0.00416667
|
2024/02/17
|
2024-02-17 14:30
|
2024/02/19
|
2024-02-19 15:30
|
14
|
1402/11/28
|
1402/11/30
|
100
|
0.0
|
0
|
0
|
0.0
|
|
0.9747063697061259
|
Edit
Details
Delete
|
|
4.3
|
آدیت تضمین کیفیت
|
0
|
0
|
2024/02/19
|
2024-02-19 15:30
|
2024/02/19
|
2024-02-19 15:30
|
15
|
1402/11/30
|
1402/11/30
|
100
|
0.0
|
0
|
0
|
0.0
|
|
0.0
|
Edit
Details
Delete
|
|
4.4
|
بررسي نمونه هاي اوليه توسط واحد مهندسي آرمان موتور
|
0.00416667
|
0.00416667
|
2024/02/19
|
2024-02-19 15:30
|
2024/02/21
|
2024-02-21 16:30
|
15
|
1402/11/30
|
1402/12/2
|
100
|
0.0
|
0
|
0
|
0.0
|
|
0.9747063697061259
|
Edit
Details
Delete
|
|
4.5
|
ارسال نمونه هاي اوليه به شركت کرمان موتور
|
0.00625
|
0.00625
|
2024/02/22
|
2024-02-22 08:30
|
2024/02/26
|
2024-02-26 10:00
|
17
|
1402/12/3
|
1402/12/7
|
100
|
0.0
|
0
|
0
|
0.0
|
|
1.462059554559189
|
Edit
Details
Delete
|
|
4.6
|
بررسي و ارزيابي نمونه اوليه
|
0.00833333
|
0.00833333
|
2024/02/26
|
2024-02-26 10:00
|
2024/03/02
|
2024-03-02 12:00
|
18
|
1402/12/7
|
1402/12/12
|
100
|
0.0
|
0
|
0
|
0.0
|
|
1.9494127394122518
|
Edit
Details
Delete
|
|
4.7
|
اعلام نتايج بررسي نمونه ها
|
0.00208333
|
0.00208333
|
2024/03/02
|
2024-03-02 12:00
|
2024/03/03
|
2024-03-03 12:30
|
19
|
1402/12/12
|
1402/12/13
|
100
|
0.0
|
0
|
0
|
0.0
|
|
0.487353184853063
|
Edit
Details
Delete
|
|
4.8
|
اخذ تاييديه نمونه اوليه
|
0.00208333
|
0.00208333
|
2024/03/03
|
2024-03-03 13:00
|
2024/03/04
|
2024-03-04 13:30
|
20
|
1402/12/13
|
1402/12/14
|
100
|
0.0
|
0
|
0
|
0.0
|
|
0.487353184853063
|
Edit
Details
Delete
|
|
4.9
|
ارسال نمونه تاييد شده به تهران جهت تهيه نقشه
|
0.00416667
|
0.00416667
|
2024/03/04
|
2024-03-04 13:30
|
2024/03/06
|
2024-03-06 14:30
|
21
|
1402/12/14
|
1402/12/16
|
100
|
0.0
|
0
|
0
|
0.0
|
|
0.9747063697061259
|
Edit
Details
Delete
|
|
4.10
|
اسكن و مدلسازي
|
0.0416667
|
0.0416667
|
2024/02/19
|
2024-02-19 15:30
|
2024/03/16
|
2024-03-16 10:00
|
22
|
1402/11/30
|
1402/12/26
|
100
|
0.0
|
0
|
0
|
0.0
|
|
9.74706369706126
|
Edit
Details
Delete
|
|
4.11
|
طراحي فيكسچر توليدي و كنترلي
|
0.03125
|
0.03125
|
2024/02/28
|
2024-02-28 11:00
|
2024/03/18
|
2024-03-18 11:00
|
23
|
1402/12/9
|
1402/12/28
|
100
|
0.0
|
0
|
0
|
0.0
|
|
7.310297772795946
|
Edit
Details
Delete
|
|
4.12
|
ساخت فيكسچر توليدي و كنترلي
|
0.03125
|
0.03125
|
2024/03/06
|
2024-03-06 14:30
|
2024/04/08
|
2024-04-08 14:30
|
24
|
1402/12/16
|
1403/1/20
|
100
|
0.0
|
0
|
0
|
0.0
|
|
7.310297772795946
|
Edit
Details
Delete
|
|
4.13
|
مونتاژ فيكسچر ها در كارخانه
|
0.0104167
|
0.0104167
|
2024/04/08
|
2024-04-08 14:30
|
2024/04/17
|
2024-04-17 09:00
|
25
|
1403/1/20
|
1403/1/29
|
100
|
0.0
|
0
|
0
|
0.0
|
|
2.436765924265315
|
Edit
Details
Delete
|
|
4.14
|
عقد قرارداد توليد اگزوز و سفارش توليد 100 ست
|
0.0145833
|
0.0145833
|
2024/03/02
|
2024-03-02 12:00
|
2024/03/10
|
2024-03-10 16:00
|
21
|
1402/12/12
|
1402/12/20
|
100
|
0.0
|
0
|
0
|
0.0
|
|
3.4114722939714412
|
Edit
Details
Delete
|
|
5
|
فاز يك روز خط
|
0.0854167
|
0.0854167
|
2024/02/27
|
2024-02-27 10:30
|
2024/05/05
|
2024-05-05 16:30
|
|
1402/12/8
|
1403/2/16
|
0
|
0.0
|
0
|
0
|
0.0
|
|
29.728544276036846
|
Edit
Details
Delete
|
|
5.1
|
پيش پرداخت قرارداد
|
0.0104167
|
0.0104167
|
2024/03/07
|
2024-03-07 15:00
|
2024/03/14
|
2024-03-14 09:30
|
27
|
1402/12/17
|
1402/12/24
|
100
|
0.0
|
0
|
0
|
0.0
|
|
2.436765924265315
|
Edit
Details
Delete
|
|
5.2
|
توليد و ارسال قطعات يك روز خط به كارخانه
|
0.0208333
|
0.0208333
|
2024/03/09
|
2024-03-09 15:30
|
2024/04/04
|
2024-04-04 12:30
|
29
|
1402/12/19
|
1403/1/16
|
100
|
0.0
|
0
|
0
|
0.0
|
|
4.87353184853063
|
Edit
Details
Delete
|
|
5.3
|
آديت فرآيند واحد تضمين كيفيت
|
0
|
0
|
2024/04/04
|
2024-04-04 12:30
|
2024/04/04
|
2024-04-04 12:30
|
30
|
1403/1/16
|
1403/1/16
|
0
|
0.0
|
0
|
0
|
0.0
|
|
0.0
|
Edit
Details
Delete
|
|
5.4
|
توليد يك روز خط اگزوز در آرمان موتور
|
0.00833333
|
0.00833333
|
2024/04/14
|
2024-04-14 16:00
|
2024/04/20
|
2024-04-20 10:00
|
31,30,26
|
1403/1/26
|
1403/2/1
|
100
|
0.0
|
0
|
0
|
0.0
|
|
1.9494127394122518
|
Edit
Details
Delete
|
|
5.5
|
مجوز يك روز خط
|
0.00625
|
0.00625
|
2024/04/20
|
2024-04-20 10:00
|
2024/04/23
|
2024-04-23 11:30
|
32
|
1403/2/1
|
1403/2/4
|
50
|
0.0
|
0
|
0
|
0.0
|
|
1.462059554559189
|
Edit
Details
Delete
|
|
5.6
|
مونتاژ يك روز خط-بسته به برنامه توليد
|
0.00625
|
0.00625
|
2024/04/23
|
2024-04-23 11:30
|
2024/04/27
|
2024-04-27 13:30
|
33
|
1403/2/4
|
1403/2/8
|
100
|
0.0
|
0
|
0
|
0.0
|
|
1.462059554559189
|
Edit
Details
Delete
|
|
5.7
|
انجام تست هاي ذكر شده در تست پلن، تهيه تست ريپورت
|
0.0625
|
0.0625
|
2024/02/27
|
2024-02-27 10:30
|
2024/04/21
|
2024-04-21 10:30
|
21,12
|
1402/12/8
|
1403/2/2
|
90
|
0.0
|
0
|
0
|
0.0
|
|
14.620595545591891
|
Edit
Details
Delete
|
|
5.8
|
ارزيابي يك روز خط
|
0.00833333
|
0.00833333
|
2024/04/27
|
2024-04-27 13:30
|
2024/05/01
|
2024-05-01 15:30
|
34
|
1403/2/8
|
1403/2/12
|
100
|
0.0
|
0
|
0
|
0.0
|
|
1.9494127394122518
|
Edit
Details
Delete
|
|
5.9
|
تاييديه يك روز خط
|
0.00416667
|
0.00416667
|
2024/05/01
|
2024-05-01 15:30
|
2024/05/05
|
2024-05-05 16:30
|
36
|
1403/2/12
|
1403/2/16
|
100
|
0.0
|
0
|
0
|
0.0
|
|
0.9747063697061259
|
Edit
Details
Delete
|
|
6
|
اتمام پروژه- سفارشگذاري جهت توليد انبوه
|
0
|
0
|
2024/05/05
|
2024-05-05 17:00
|
2024/05/05
|
2024-05-05 17:00
|
37,35
|
1403/2/16
|
1403/2/16
|
0
|
0.0
|
0
|
0
|
0.0
|
|
0.0
|
Edit
Details
Delete
|